FA5270-19-Q-003C.pdf

PDF 230 KB Posted

Attached to
Reserved Federal contract opportunity
Solicitation number
FA527019Q003C
Issued by
Department of the Air Force Pacific Air Forces

View the file

Other files for this federal contract opportunity

Other files attached to Reserved, newest first.
File Type Posted
Project_Information_Sheet.docx DOCX document
Attachment__4_-_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
Attachment__3_-_Door_Location_plan.pdf PDF
Attachment__6_-__Past_Performance_Questionnaire.pdf PDF
Attachment__7_-_Question_Form.pdf PDF
Attachment__5_-_Site_Visit_Reservation_Form.pdf PDF
Attachment__1_-_SOW_16_Jul_19.pdf PDF
Attachment__2_-_CSP_11_Jul_19.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

Number: FA5270-19-Q-0003C

Solicitation Issue Date: 21 August 2019

From: 18 th

Contracting Squadron To: All Qualified Interested Parties Unit 5199, Bldg. 95 Kadena Air Base, Japan Your Company Name: _________________

APO, AP 96368

TEL: 098-938-1110 extension 634-3541 (Commercial) Michael Hofer: michael.hofer@us.af.mil

Responses must be received NLT: 12 Sept 2019, 1:00PM Japan Standard Time (JST)

Offerors shall submit electronic copies of quotations via e-mail. Email files are not to exceed 3 MB. By submitting an electronic copy, offerors assume all risk of quotation not getting through security measures and firewalls. Only files created using Microsoft WORD, Microsoft EXCEL, and/or Adobe .pdf files will be accepted. No zip files will be accepted. Submit quotations & all files electronically, no later than specified closing date and time on the RFQ to the above email address.

This procurement is being solicited under the Federal Acquisition Regulations FAR Part 15, Contracting by Negotiations and FAR Part 13 Simplified Acquisition Procedures.

*Lack of registration in the SAM database will make your firm ineligible for award. The Contractor is required to confirm annually that the information in the SAM database is accurate and complete, (IAW FAR 52.204-13 System for Award Management Maintenance (OCT 2018).

PROJECT NUMBER AND TITLE: 1070819, Repair SCIF Doors B32520

CONTRACT TYPE: Firm Fixed Price

WORK ELEMENT: Work Element No. 1 (Design/Build)

MAGNITUDE OF PROPOSED PROJECT: Pursuant to FAR 36.204(e) the following is provided. The magnitude of construction is between $25,000 and $100,000.

(FY 19 conversion rate: $1.00 = ¥111.5938)

Item Description QTY Unit Price Extended Amount

0001 Repair SCIF Doors 1 ___________ ______________.

The contractor shall provide all plant, labor and materials to replace the five exterior doors and frames on the SCIF portion of Building 3520 in accordance with ICD 705, the Construction Security Plan, and Statement of Work (SOW) dated 16 July 2019.

mailto:michael.hofer@us.af.mil

SITE VISIT: A site visit will be held on 28 Aug 2019 @ 2:00 P.M JST. Offerors shall complete the Site Visit Reservation Form (Attch 5) and submit digitally to the POC’s listed above by 2:00 P.M JST 27 Aug 2019.

GENERAL QUOTE PREPARATION INSTRUCTIONS

A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of three (3) separate parts; Part I – Summary and Miscellaneous Data, Part II - Price Proposal, and Part III - Past Performance Proposal.

B. Specific Instructions:

1. PART I – SUMMARY AND MISCELLANEOUS DATA. Submit Numbered Emails no greater than 5MB in size.

(a) The offeror shall provide a concise summary and master table of contents of the entire proposal.

(b) Your acknowledgement of any and all Amendments to the solicitation. (Amendments will not be counted against the page limits).

(c) Complete the necessary fill-ins and certifications in Clauses, Provisions, or Attachments.

(d) Incurred Expenses: The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.

(e) Licensing Requirement: Any contract resulting from this solicitation will be awarded and performed in its entirety in the country of Japan. Contractors must be duly authorized to operate and conduct business in Japan, and must fully comply with all laws, decrees, labor standards, and regulations of Japan during the performance of the contract. Offerors must be registered to do business in Japan and possess a construction license (Kensetsu-Gyo Kyokasho) issued by the Ministry of Land, Infrastructure and Transport, or prefectural government.

2. PART II – PRICE Quote - Submit Numbered Emails no greater than 5MB in size.

(a) Insert proposed unit and extended prices for each Contract Line Item Number (CLIN) 0001. Pricing shall be your best offer to include but not limited to indirect costs such as overhead, profit, bond, insurance, etc. It is imperative that mathematical calculations are correct.

(b) Extreme care should be exercised to ensure that no proprietary data of any kind are included in the proposal.

3. PART III – PAST PERFORMANCE PROPOSAL - Limited to no more than 5 pages per contract listed. Only references for past efforts/contracts of relevance are desired. Submit Numbered Emails no greater than 5MB in size.

(a) Project Information Sheet included in this solicitation, is provided for the offeror to submit previous construction project experience whose past performance is to be considered under this solicitation.

(1) Submit no more than (3) in total relevant projects. If more than three (3) projects are submitted, only the first three (3) projects will be considered for evaluation. The fourth (4th) and any additional project will not be considered for evaluation. This is regardless whether or not the first three (3) projects are classified as “relevant” or “not relevant” by Government evaluators. Offerors shall use Project Information Sheet when submitting past performance information.

(2) If an offeror has no past performance history of relevance, the offeror must state affirmatively it possesses no past performance history of relevance. The offeror shall ensure correct phone numbers and email addresses are provided for the client point of contact.

(b) Past Performance Information: Only recent and relevant construction projects are requested for evaluation. For the purposes of this solicitation, “recent” is defined as within the last three (3) years prior to the solicitation issuance date. “Relevant” projects include the following and must be submitted in Part III of the offeror’s proposal.

(1) General description: The scope includes but is not limited to: design and perform the work to provide reliable and functional high-security door;

(2) Were completed on a DoD Installation;

(3) Were completed by the Offeror as the prime contractor;

(c) Quality and Satisfaction Rating of Contracts: Past Performance Questionnaires (PPQs) shall be used by the offeror in obtaining and providing past performance information. The government requires the offeror send out a PPQ to EACH of the Points-of-Contact (POCs) identified in the submitted Project Information Sheet (para (a) above). The offeror shall complete and submit with the proposal the first page of the PPQ for every Project Information Sheet.

The offeror shall send out the PPQ, using the Past Performance Evaluation Cover Letter to each of its references.

THE RESPONSIBILITY TO SEND OUT THE PAST PERFORMANCE QUESTIONNAIRE RESTS

SOLELY WITH THE OFFEROR. OFFERORS SHOULD FOLLOW-UP WITH CLIENTS/REFERENCES TO

ENSURE TIMELY SUBMITTAL OF QUESTIONNAIRES. PPQS ARE DUE BACK TO THE

GOVERNMENT BY 12 September 2019, 2:00PM.

Once the questionnaires are completed by the POCs, the information contained therein will be considered source selection sensitive and will not be released outside the Government. The POCs shall forward their completed questionnaires directly to the Government – NOT BACK TO THE OFFEROR.

PPQs shall be sent directly from your reference to this office marked to the attention of Capt Michael Hofer, via e-mail to michael.hofer.1@us.af.mil or mailed to the following address:

18th Contracting Squadron Attn: Capt Michael Hofer Unit 5199, Bldg. 95

APO AP 96368-5199

(d) In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team member (joint venture, teaming arrangement) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

(e) The evaluation of past performance information will not take into account past performance mailto:michael.hofer.1@us.af.mil regarding predecessor companies, will not take into account past performance of key personnel who have relevant experience, and will not take into account past performance regarding subcontractors that will perform major aspects of the requirement when such information is relevant to this acquisition.

D. General Information:

1. Information regarding submission of proposals: Hand carried or mailed proposals must be delivered to the following address:

18th Contracting Squadron/PKC Attn: Capt Michael Hofer Unit 5199, Bldg. 95

APO AP 96368-5199

2. The sealed envelope or package used to submit your proposal must show the time and date specified for receipt, the solicitation number, and the name and address of the offeror.

3. Offerors are cautioned that Kadena Air Base has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance. SOME DELAY SHOULD BE EXPECTED WHEN HAND-CARRYING PROPOSALS. Offerors should allow sufficient time to obtain a visitor pass and arrive at 18th Contracting Squadron, Kadena Air Base prior to the time specified for receipt.

Late proposals are defined as being received by the 18th Contracting Squadron after the solicitation closing date and time and will be processed in accordance with FAR 52.215-1(c)(3),“Submission, modification, revision, and withdrawal of proposals.”

4. FEDERAL HOLIDAYS: The following Federal Legal Holidays are observed by this base:

New Year’s Day 1 January Birthday of Martin Luther King Third Monday in January Washington’s Birthday Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

5. Submission of Complete Proposals: All proposals must be complete, self-sufficient, and respond directly to the requirements of this solicitation. Failure to furnish a complete proposal, at the time of proposal submission, may result in the proposal being unacceptable to the Government and elimination from consideration for award. The Government reserves the right to award without discussions. Any commitments made in the proposal shall become a part of the resultant contract.

6. Incurred Expenses: The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation. The offeror is required to submit an offer on all items. Failure to do so may disqualify the proposal.

7. In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful proposals and will destroy all extra copies. No destruction certificate will be provided.

8. Amendments prior to receipt of proposals: The Government reserves the right to revise or amend the solicitation, specifications and/or drawing, prior to the date of receipt of proposals. If, in the opinion of the Contracting Officer, revisions or amendments require material changes in the quantity or price of items, the date of receipt of proposals may also be changed. Such revisions or amendments, or change in the date for receipt of proposals will be announced by an amendment to the Request for Propos

BASIS FOR CONTRACT AWARD

This is a competitive Lowest Price Acceptable Performance (LPAP) source selection conducted in accordance with Federal Acquisition Regulation (FAR) Part 15, Department of Defense (DoD) FAR Supplement Procedures, Guidance and Information Subpart 215.3, and Air Force FAR Supplement (AFFARS) Mandatory Procedures (MP) 5315.3. By submission of its offer in accordance with the instructions provided in provision FAR 52.215-1, Instructions to Offerors – Competitive Acquisition, the offeror accedes to the terms of this model contract. Failure to meet a solicitation requirement may result in an offer being determined unacceptable. Award will be made to the lowest Total Evaluated Price (TEP) of pricing schedule in Exhibit that meets the acceptability standards for non- price factors. The evaluation process will include the following:

A. Past Performance Factor. The government will evaluate recent and relevant performance information on all offerors based on (i) the past/current projects provided by the offeror using the Project Information Sheet (SSP Attachment 5), and (ii) any past performance information obtained from survey/questionnaires (SSP Attachment 6), and (iii) any data independently obtained by the government. If a reference identified by the offeror in accordance with GENERAL QUOTE PREPARATION INSTRUCTIONS, para B.3(c), does not submit a survey/questionnaire, the government will follow up with the reference POC, but it is not responsible for the failure of a reference POC to provide a survey/questionnaire.

1. Recent past performance information includes contracts performed and/or being performed for any customer within the last five (5) years prior to the issuance date of the solicitation.

2. Relevant contracts performance effort involved similar scope, magnitude of effort, and complexities to that required by this solicitation as outlined below.

(a) General description: Work to include but is not limited to: design and perform the work to provide reliable and functional high-security door;

(b) Were completed on a DoD Installation;

(c) Were completed by the Offeror as the prime contractor;

The government will assess relevancy for each project and assign a rating as described in Table 1 below:

Table 1. Past Performance Relevancy Ratings Rating Rating Definition

Relevant

Present/past performance involved similar scope, magnitude of effort, and complexity that this solicitation requires.

Not Relevant

Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

3. Performance Quality Assessment: For each of the recent and relevant past performance information reviewed, the performance quality of work will be assessed based on the (i) Quality Assessment Criteria evaluated under GENERAL QUOTE PREPARATION INSTRUCTIONS, para B.3(b), Performance Surveys/Questionnaires and (ii) the evaluation ratings in the Federal Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), if available. Each recent and relevant past performance information reviewed will be assigned a rating as described in Table 2 below:

Table 2. Quality Assessment Ratings Rating Rating Definition

Satisfactory (S)

During the contract period, contractor performance is meeting (or met) contract requirements. For any problems encountered, contractor took effective corrective action.

Unsatisfactory (U)

During the contract period, contractor performance is not meeting (or did not meet) contract requirements. For any problems encountered, corrective action appeared only marginally effective, not effective, or not fully implemented. Customer involvement was required.

The past performance evaluation is an assessment of the offeror’s probability of meeting the solicitation requirements. Offerors must receive a past performance rating of “Acceptable” to be eligible for award. For offerors in a teaming arrangement where two or more companies form a partnership or joint venture (JV), at least one partner must be rated “Acceptable;” in order for the partnership to be rated “Acceptable” as a whole.

As a result of the recency, relevancy, and performance quality assessments, offerors will receive an integrated past performance rating as described in Table 3 below:

Table 3. Past Performance Evaluation Ratings Rating Description

Acceptable Based on the offeror’s performance record, the government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.

Unacceptable Based on the offeror’s performance record, the government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating cannot be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the offeror shall be determined to have an unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral shall be considered “acceptable.”

C. Price Evaluation Factor.

The Government shall rank all technically acceptable offeror’s Total Evaluation Price (TEP). The price evaluation will document the fair and reasonableness of the TEP.

D. Offerors are cautioned to submit sufficient information and in the format specified in GENERAL QUOTE

PREPARATION INSTRUCTIONS of this solicitation. Offerors may be asked to clarify certain aspects of their proposals. Exchanges conducted to resolve minor or clerical errors will not constitute discussions and the contracting officer reserves the right to award a contract without the opportunity for proposal revision. The Government intends to award a contract without discussions with respective offerors. The Government, however, reserves the right to conduct discussions if deemed in its best interest.

E. Award will be made to the lowest priced offer, based on TEP, which meets the acceptability standards for non- price factors.

CLAUSES INCORPORATED BY REFERENCE

52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-7 Anti-Kickback Procedures MAY 2014

52.203-12 Limitation On Payments To Influence Certain Federal Transactions OCT 2010

52.203-17 Contractor Employee Whistleblower Rights and

Requirement To Inform Employees of Whistleblower Rights

APR 2014

52.204-7 System for Award Management OCT 2016 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards OCT 2016

52.204-13 System for Award Management Maintenance OCT 2016

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations NOV 2015

52.222-50 Combating Trafficking in Persons MAR 2015

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts SEP 2013

52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts MAY 2008

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.225-14 Inconsistency Between English Version And Translation Of Contract FEB 2000

52.228-2 Additional Bond Security OCT 1997 52.228-3 Worker's Compensation Insurance (Defense Base Act) JUL 2014

52.228-4 Workers' Compensation and War-Hazard Insurance Overseas APR 1984

52.228-11 Pledges Of Assets JAN 2012 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017

52.232-33 Payment by Electronic Funds Transfer--System for Award Management JUL 2013

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984

52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984

52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) - Alternate I APR 1984

52.236-26 Preconstruction Conference FEB 1995 52.242-14 Suspension of Work APR 1984 52.243-5 Changes and Changed Conditions APR 1984 52.244-6 Subcontracts for Commercial Items NOV 2017 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2015

52.249-2 Termination For Convenience Of The Government (Fixed- Price) APR 2012

52.249-2 Alt I Termination for Convenience of the Government (Fixed- Price) (Apr 2012) - Alternate I SEP 1996

52.249-10 Default (Fixed-Price Construction) APR 1984 52.252-6 Authorized Deviations In Clauses APR 1984 52.253-1 Computer Generated Forms JAN 1991

252.201-7000 Contracting Officer's Representative DEC 1991

252.203-7000 Requirements Relating to Compensation of Former DoD Officials SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7041 Correspondence in English JUN 1997 252.225-7042 Authorization to Perform APR 2003 252.225-7048 Export-Controlled Items JUN 2013 252.227-7033 Rights in Shop Drawings APR 1966 252.229-7000 Invoices Exclusive of Taxes or Duties JUN 1997 252.231-7000 Supplemental Cost Principles DEC 1991

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports JUN 2012

252.232-7008 Assignment of Claims (Overseas) JUN 1997 252.232-7010 Levies on Contract Payments DEC 2006 252.233-7001 Choice of Law (Overseas) JUN 1997 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013

252.246-7004 Safety of Facilities, Infrastructure, and Equipment for Military Operations OCT 2010

252.247-7023 Transportation of Supplies by Sea APR 2014

252.247-7023 Alt I

Transportation of Supplies by Sea (APR 2014) Alternate

I APR 2014

CLAUSES INCORPORATED BY FULL TEXT

52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY

DATA (JAN 1997)

(a) "Hazardous material", as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract).

(b) The offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Material Safety Data Sheet submitted under this contract.

Material Identification No. (If none, insert "None")

(c) This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered under this contract is hazardous.

(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Material

Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with Federal Standard No. 313, whether or not the apparently successful offeror is the actual manufacturer of these items. Failure to submit the Material Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.

(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard

No. 313, which renders incomplete or inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.

(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the

Contractor of any responsibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.

(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.

(h) The Government's rights in data furnished under this contract with respect to hazardous material are as follows:

(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to--

(i) Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous materials;

(ii) Obtain medical treatment for those affected by the material; and

(iii) Have others use, duplicate, and disclose the data for the Government for these purposes.

(2) To use, duplicate, and disclose data furnished under this clause, in accordance with subparagraph (h)(1) of this clause, in precedence over any other clause of this contract providing for rights in data.

(3) The Government is not precluded from using similar or identical data acquired from other sources.

(End of clause)

52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.

(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe, or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.

(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies available to the Contracting Officer upon request.

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/vmfara.htm http://farsite.hill.af.mil/vmdfara.htm http://farsite.hill.af.mil/vmaffara.htm http://farsite.hill.af.mil/vmfara.htm http://farsite.hill.af.mil/vmdfara.htm http://farsite.hill.af.mil/vmaffara.htm

252.204-7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN

2015)

Substitute the following paragraphs (d) and (e) for paragraph (d) of the provision at FAR 52.204-8:

(d)(1) The following representations or certifications in the System for Award Management (SAM) database are applicable to this solicitation as indicated:

(i) 252.209-7003, Reserve Officer Training Corps and Military Recruiting on Campus--Representation.

Applies to all solicitations with institutions of higher education.

(ii) 252.216-7008, Economic Price Adjustment--Wage Rates or Material Prices Controlled by a Foreign

Government. Applies to solicitations for fixed-price supply and service contracts when the contract is to be performed wholly or in part in a foreign country, and a foreign government controls wage rates or material prices and may during contract performance impose a mandatory change in wages or prices of materials.

(iii) 252.222-7007, Representation Regarding Combating Trafficking in Persons, as prescribed in

222.1771. Applies to solicitations with a value expected to exceed the simplified acquisition threshold.

(iv) 252.225-7042, Authorization to Perform. Applies to all solicitations when performance will be wholly or in part in a foreign country.

(v) 252.225-7049, Prohibition on Acquisition of Commercial Satellite Services from Certain Foreign

Entities-- Representations. Applies to solicitations for the acquisition of commercial satellite services.

(vi) 252.225-7050, Disclosure of Ownership or Control by the Government of a Country that is a State Sponsor of Terrorism. Applies to all solicitations expected to result in contracts of $150,000 or more.

(vii) 252.229-7012, Tax Exemptions (Italy)--Representation. Applies to solicitations when contract performance will be in Italy.

(viii) 252.229-7013, Tax Exemptions (Spain)--Representation. Applies to solicitations when contract performance will be in Spain.

(ix) 252.247-7022, Representation of Extent of Transportation by Sea. Applies to all solicitations except those for direct purchase of ocean transportation services or those with an anticipated value at or below the simplified acquisition threshold.

(2) The following representations or certifications in SAM are applicable to this solicitation as indicated by the Contracting Officer: [Contracting Officer check as appropriate.]

(i) 252.209-7002, Disclosure of Ownership or Control by a Foreign Government.

(ii) 252.225-7000, Buy American--Balance of Payments Program Certificate.

(iii) 252.225-7020, Trade Agreements Certificate.

Use with Alternate I.

(iv) 252.225-7031, Secondary Arab Boycott of Israel.

(v) 252.225-7035, Buy American--Free Trade Agreements--Balance of Payments Program Certificate.

Use with Alternate I.

Use with Alternate II.

Use with Alternate III.

Use with Alternate IV.

Use with Alternate V.

(e) The offeror has completed the annual representations and certifications electronically via the SAM Web site at https://www.acquisition.gov/. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in FAR 52.204-8(c) and paragraph (d) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer, and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by provision number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR/DFARS Clause # Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications located in the SAM database.

(End of provision)

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER

INCIDENT REPORTING (OCT 2016)

(a) Definitions. As used in this clause--

Adequate security means protective measures that are commensurate with the consequences and probability of loss, misuse, or unauthorized access to, or modification of information.

Compromise means disclosure of information to unauthorized persons, or a violation of the security policy of a system, in which unauthorized intentional or unintentional disclosure, modification, destruction, or loss of an object, or the copying of information to unauthorized media may have occurred.

Contractor attributional/proprietary information means information that identifies the contractor(s), whether directly or indirectly, by the grouping of information that can be traced back to the contractor(s) http://www.acquisition.gov/

(e.g., program description, facility locations), personally identifiable information, as well as trade secrets, commercial or financial information, or other commercially sensitive information that is not customarily shared outside of the company.

Controlled technical information means technical information with military or space application that is subject to controls on the access, use, reproduction, modification, performance, display, release, disclosure, or dissemination. Controlled technical information would meet the criteria, if disseminated, for distribution statements B through F using the criteria set forth in DoD Instruction 5230.24, Distribution Statements on Technical Documents. The term does not include information that is lawfully publicly available without restrictions.

Covered contractor information system means an unclassified information system that is owned, or operated by or for, a contractor and that processes, stores, or transmits covered defense information.

Covered defense information means unclassified controlled technical information or other information, as described in the Controlled Unclassified Information (CUI) Registry at http://www.archives.gov/cui/registry/category- list.html, that requires safeguarding or dissemination controls pursuant to and consistent with law, regulations, and Governmentwide policies, and is--

(1) Marked or otherwise identified in the contract, task order, or delivery order and provided to the contractor by or on behalf of DoD in support of the performance of the contract; or

(2) Collected, developed, received, transmitted, used, or stored by or on behalf of the contractor in support of the performance of the contract.

Cyber incident means actions taken through the use of computer networks that result in a compromise or an actual or potentially adverse effect on an information system and/or the information residing therein.

Forensic analysis means the practice of gathering, retaining, and analyzing computer-related data for investigative purposes in a manner that maintains the integrity of the data.

Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information.

Malicious software means computer software or firmware intended to perform an unauthorized process that will have adverse impact on the confidentiality, integrity, or availability of an information system.

This definition includes a virus, worm, Trojan horse, or other code-based entity that infects a host, as well as spyware and some forms of adware.

Media means physical devices or writing surfaces including, but is not limited to, magnetic tapes, optical disks, magnetic disks, large-scale integration memory chips, and printouts onto which covered defense information is recorded, stored, or printed within a covered contractor information system.

Operationally critical support means supplies or services designated by the Government as critical for airlift, sealift, intermodal transportation services, or logistical support that is essential to the mobilization, deployment, or sustainment of the Armed Forces in a contingency operation.

Rapidly report means within 72 hours of discovery of any cyber incident.

Technical information means technical data or computer software, as those terms are defined in the clause at DFARS 252.227-7013, Rights in Technical Data--Noncommercial Items, regardless of whether or not the clause is incorporated in this solicitation or contract. Examples of technical information include http://www.archives.gov/cui/registry/category-list.html http://www.archives.gov/cui/registry/category-list.html research and engineering data, engineering drawings, and associated lists, specifications, standards, process sheets, manuals, technical reports, technical orders, catalog-item identifications, data sets, studies and analyses and related information, and computer software executable code and source code.

(b) Adequate security. The Contractor shall provide adequate security on all covered contractor information systems. To provide adequate security, the Contractor shall implement, at a minimum, the following information security protections:

(1) For covered contractor information systems that are part of an information technology (IT) service or system operated on behalf of the Government, the following security requirements apply:

(i) Cloud computing services shall be subject to the security requirements specified in the clause 252.239- 7010, Cloud Computing Services, of this contract.

(ii) Any other such IT service or system (i.e., other than cloud computing) shall be subject to the security requirements specified elsewhere in this contract.

(2) For covered contractor information systems that are not part of an IT service or system operated on behalf of the Government and therefore are not subject to the security requirement specified at paragraph (b)(1) of this clause, the following security requirements apply:

(i) Except as provided in paragraph (b)(2)(ii) of this clause, the covered contractor information system shall be subject to the security requirements in National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, ``Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations'' (available via the internet at http://dx.doi.org/10.6028/NIST.SP.800-171) in effect at the time the solicitation is issued or as authorized by the Contracting Officer.

(ii)(A) The Contractor shall implement NIST SP 800-171, as soon as practical, but not later than December 31, 2017. For all contracts awarded prior to October 1, 2017, the Contractor shall notify the DoD Chief Information Officer (CIO), via email at osd.dibcsia@mail.mil, within 30 days of contract award, of any security requirements specified by NIST SP 800-171 not implemented at the time of contract award.

(B) The Contractor shall submit requests to vary from NIST SP 800-171 in writing to the Contracting Officer, for consideration by the DoD CIO. The Contractor need not implement any security requirement adjudicated by an authorized representative of the DoD CIO to be nonapplicable or to have an alternative, but equally effective, security measure that may be implemented in its place.

(C) If the DoD CIO has previously adjudicated the contractor's requests indicating that a requirement is not applicable or that an alternative security measure is equally effective, a copy of that approval shall be provided to the Contracting Officer when requesting its recognition under this contract.

(D) If the Contractor intends to use an external cloud service provider to store, process, or transmit any covered defense information in performance of this contract, the Contractor shall require and ensure that the cloud service provider meets security requirements equivalent to those established by the Government for the Federal Risk and Authorization Management Program (FedRAMP) Moderate baseline (https://www.fedramp.gov/resources/documents/) and that the cloud service provider complies with requirements in paragraphs (c) through (g) of this clause for cyber incident reporting, malicious software, http://dx.doi.org/10.6028/NIST.SP.800-171 mailto:osd.dibcsia@mail.mil https://www.fedramp.gov/resources/documents/ media preservation and protection, access to additional information and equipment necessary for forensic analysis, and cyber incident damage assessment.

(3) Apply other information systems security measures when the Contractor reasonably determines that information systems security measures, in addition to those identified in paragraphs (b)(1) and (2) of this clause, may be required to provide adequate security in a dynamic environment or to accommodate special circumstances (e.g., medical devices) and any individual, isolated, or temporary deficiencies based on an assessed risk or vulnerability. These measures may be addressed in a system security plan.

(c) Cyber incident reporting requirement.

(1) When the Contractor discovers a cyber incident that affects a covered contractor information system or the covered defense information residing therein, or that affects the contractor's ability to perform the requirements of the contract that are designated as operationally critical support and identified in the contract, the Contractor shall--

(i) Conduct a review for evidence of compromise of covered defense information, including, but not limited to, identifying compromised computers, servers, specific data, and user accounts. This review shall also include analyzing covered contractor information system(s) that were part of the cyber incident, as well as other information systems on the Contractor's network(s), that may have been accessed as a result of the incident in order to identify compromised covered defense information, or that affect the Contractor's ability to provide operationally critical support; and

(ii) Rapidly report cyber incidents to DoD at http://dibnet.dod.mil.

(2) Cyber incident report. The cyber incident report shall be treated as information created by or for DoD and shall include, at a minimum, the required elements at http://dibnet.dod.mil.

(3) Medium assurance certificate requirement. In order to report cyber incidents in accordance with this clause, the Contractor or subcontractor shall have or acquire a DoD-approved medium assurance certificate to report cyber incidents. For information on obtaining a DoD-approved medium assurance certificate, see http://iase.disa.mil/pki/eca/Pages/index.aspx.

(d) Malicious software. When the Contractor or subcontractors discover and isolate malicious software in connection with a reported cyber incident, submit the malicious software to DoD Cyber Crime Center (DC3) in accordance with instructions provided by DC3 or the Contracting Officer. Do not send the malicious software to the Contracting Officer.

(e) Media preservation and protection. When a Contractor discovers a cyber incident has occurred, the Contractor shall preserve and protect images of all known affected information systems identified in paragraph (c)(1)(i) of this clause and all relevant monitoring/packet capture data for at least 90 days from the submission of the cyber incident report to allow DoD to request the media or decline interest.

(f) Access to additional information or equipment necessary for forensic analysis. Upon request by DoD, the Contractor shall provide DoD with access to additional information or equipment that is necessary to conduct a forensic analysis.

(g) Cyber incident damage assessment activities. If DoD elects to conduct a damage assessment, the

Contracting Officer will request that the Contractor provide all of the damage assessment information gathered in accordance with paragraph (e) of this clause.

http://dibnet.dod.mil/ http://dibnet.dod.mil/ http://iase.disa.mil/pki/eca/Pages/index.aspx

(h) DoD safeguarding and use of contractor attributional/proprietary information. The Government shall protect against the unauthorized use or release of information obtained from the contractor (or derived from information obtained from the contractor) under this clause that includes contractor attributional/proprietary information, including such information submitted in accordance with paragraph (c). To the maximum extent practicable, the Contractor shall identify and mark attributional/proprietary information. In making an authorized release of such information, the Government will implement appropriate procedures to minimize the contractor attributional/proprietary information that is included in such authorized release, seeking to include only that information that is necessary for the authorized purpose(s) for which the information is being released.

(i) Use and release of contractor attributional/proprietary information not created by or for DoD. Information that is obtained from the contractor (or derived from information obtained from the contractor) under this clause that is not created by or for DoD is authorized to be released outside of DoD--

(1) To entities with missions that may be affected by such information;

(2) To entities that may be called upon to assist in the diagnosis, detection, or mitigation of cyber incidents;

(3) To Government entities that conduct counterintelligence or law enforcement investigations;

(4) For national security purposes, including cyber situational awareness and defense purposes (including with Defense Industrial Base (DIB) participants in the program at 32 CFR part 236); or

(5) To a support services contractor (``recipient'') that is directly supporting Government activities under a contract that includes the clause at 252.204-7009, Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information.

(j) Use and release of contractor attributional/proprietary information created by or for DoD. Information that is obtained from the contractor (or derived from information obtained from the contractor) under this clause that is created by or for DoD (including the information submitted pursuant to paragraph (c) of this clause) is authorized to be used and released outside of DoD for purposes and activities authorized by paragraph (i) of this clause, and for any other lawful Government purpose or activity, subject to all applicable statutory, regulatory, and policy based restrictions on the Government's use and release of such information.

(k) The Contractor shall conduct activities under this clause in accordance with applicable laws and regulations on the interception, monitoring, access, use, and disclosure of electronic communications and data.

(l) Other safeguarding or reporting requirements. The safeguarding and cyber incident reporting required by this clause in no way abrogates the Contractor's responsibility for other safeguarding or cyber incident reporting pertaining to its unclassified information systems as required by other applicable clauses of this contract, or as a result of other applicable U.S. Government statutory or regulatory requirements.

(m) Subcontracts. The Contractor shall--

(1) Include this clause, including this paragraph (m), in subcontracts, or similar contractual instruments, for operationally critical support, or for which subcontract performance will involve covered defense information, including subcontracts for commercial items, without alteration, except to identify the parties. The

Contractor shall determine if the information required for subcontractor performance retains its identity as covered defense information and will require protection under this clause, and, if necessary, consult with the Contracting Officer; and

(2) Require subcontractors to--

(i) Notify the prime Contractor (or next higher-tier subcontractor) when submitting a request to vary from a NIST SP 800-171 security requirement to the Contracting Officer, in accordance with paragraph (b)(2)(ii)(B) of this clause; and

(ii) Provide the incident report number, automatically assigned by DoD, to the prime Contractor (or next higher-tier subcontractor) as soon as practicable, when reporting a cyber incident to DoD as required in paragraph (c) of this clause.

252.223-7001 HAZARD WARNING LABELS (DEC 1991)

(a) "Hazardous material," as used in this clause, is defined in the Hazardous Material Identification and Material Safety Data clause of this contract.

(b) The Contractor shall label the item package (unit container) of any hazardous material to be delivered under this contract in accordance with the Hazard Communication Standard (29 CFR 1910.1200 et seq).

The Standard requires that the hazard warning label conform to the requirements of the standard unless the material is otherwise subject to the labeling requirements of one of the following statutes:

(1) Federal Insecticide, Fungicide and Rodenticide Act;

(2) Federal Food, Drug and Cosmetics Act;

(3) Consumer Product Safety Act;

(4) Federal Hazardous Substances Act; or

(5) Federal Alcohol Administration Act.

(c) The Offeror shall list which hazardous material listed in the Hazardous Material Identification and

Material Safety Data clause of this contract will be labeled in accordance with one of the Acts in paragraphs (b)(1) through (5) of this clause instead of the Hazard Communication Standard. Any hazardous material not listed will be interpreted to mean that a label is required in accordance with the Hazard Communication Standard.

MATERIAL (If None, Insert "None.") ACT

(d) The apparently successful Offeror agrees to submit, before award, a copy of the hazard warning label for all hazardous materials not listed in paragraph (c) of this clause.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.