pd2DB97.pdf

PDF 85 KB Posted

Attached to
Centracom Communication System Federal contract opportunity
Solicitation number
FA5270-16-T-0046
Issued by
Department of the Air Force Pacific Air Forces

About this file

Shipping Instructions.

View the file

Other files for this federal contract opportunity

Other files attached to Centracom Communication System, newest first.
File Type Posted
Parts_List.docx DOCX document
pd2F8FA.doc DOC document
justification_and_approval_CENTRACOMM.pdf PDF
pd2986F.pdf PDF
1._Sources_Sought.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROOF OF DELIVERY

TO: CONTRACTOR

Please submit proof of delivery documents for each line item and quantity shipped under each TCN number along with invoice to ensure payment is made in timely manner.

Please ensure that delivered packages are traceable if lost or stolen.

FREIGHT DELIVERY PROCEDURES

Delivery will be made by most economical method or as follows:

If freight charges exceed $100.00, a copy of the carrier’s freight bill or other evidence of receipt must be furnished with invoice. The receipt must show amount of shipping charges and be signed by company’s representative.

If freight charges exceed the amount on the purchase order, you must receive authorization by the contracting office prior to shipment and/or receive alternate shipping instructions.

Failure to obtain prior authorization may result in the government paying a lesser amount. The government will only pay fair and reasonable transportation charges as established by current market rates. Failure to comply with these procedures may delay or preclude you from receiving payment for freight charges.

Vendor will ensure that all items are delivered by delivery date.

RECEIVING REPORT

TO: REQUESTER

Upon receipt of supplies or services, the requesting activity will prepare a Receiving Report (DD Form 250, DD

Form 1155, SF 1449 or a letter) and send it to address in block 18a, and 1 copy to the Contracting Office address in block 9. Receiving Reports must be submitted within 6 working days after receipt of merchandise.

REMIT TO ADDRESS

CONTRACTOR SHIPPING INSTRUCTIONS

These instructions apply to shipments originating in the United States destined for Okinawa, Japan.

Section A – Applies to All Orders

Shipments 0-70 pounds and within size limitations: Ship prepaid by the least costly small package carrier or the

United States Postal Service. Any direct charge for prepaid cost will be listed as a separate item on the invoice for the supplies shipped. Submit a copy of the transportation or freight bill with the invoice for cost verification.

Failure to provide a copy of the paid freight bill may result in the contractor not being fully reimbursed for freight charges. Contractors shall not divide quantities into small parcels of 0-70 pounds for the purpose of avoiding shipment by other modes of transportation. Contractors shall not insure shipments at Government expense for the purpose of recovery in case of loss or damage, except where minimum insurance is required for the purpose of obtaining receipts at point of origin and upon delivery.

Shipments 0-70 pounds NOT within size limitations, or shipments 71 pounds and over: Ship prepaid by commercial surface (water), or the least costly small package carrier. If this is not possible, ship item(s) through the Defense

Transportation System.

Any shipping container or load exceeding 200 pounds gross weight shall be placed on a standard wooden/plastic skid with a minimum 3 7/8” clearance for the purpose of handling with forklifts or other material handling equipment and to allow ease of loading/unloading.

Section B – Applies to Orders Shipped via Military Sealift

Procedures for shipping through the Military Sealift Command, Consolidation and Containerization Point (CCP), Tracy, CA:

a. All shipments must be packaged, marked and labeled in accordance with DoD 4500.9R, Defense

Transportation Regulation, Part II, Cargo Movements and MIL-STD 129. Shipments considered hazardous must be prepared in accordance with Title 49, Code of Federal Regulation-Transportation, and the International Maritime

Dangerous Goods Code (IMDGC).

b. All shipments must be marked “For Export”.

c. The shipment and all paperwork must be annotated with the transportation control number (TCN) the ultimate destination and purchase order (P.O) number. Use of the military shipping label (DD Form 1387) is encouraged, but not required.

d. All shipments must be on “heat treated” pallets.

e. Contractors SHALL use Government shipping labels.

# OF PIECES PACKAGE TYPE

Ex) Box, Container, Crate, Skid/Wood Pallet, 463L Pallet

DIMENSIONS WEIGHT OF EACH

INDIVIDUAL PIECE

File details come from the government source that posted it. Updated .