MHF_Workload_Estimate_for_MFH_FY15_(31_May_14).pdf

PDF 487 KB Posted

Attached to
Custodial Services Federal contract opportunity
Solicitation number
FA5270-14-R-0003
Issued by
Department of the Air Force Pacific Air Forces

About this file

Revised MFH Workload Estimate (31 May 14)

View the file

Other files for this federal contract opportunity

Other files attached to Custodial Services, newest first.
File Type Posted
Attch_1_-_PWS_(11_Jun_14).pdf PDF
FA5270-14-R-003-0002.pdf PDF
Attch_3_-_Workload_Data_(11_Jun_14).pdf PDF
14-R-0003-0001_-_Conformed.pdf PDF
Attch_3_-_Workload_Data_(3_Jun_14).pdf PDF
Q_ _A_(6_Jun_14).pdf PDF
14-R-0003-0001.pdf PDF
Attch_1_-_PWS_(3_Jun_14).pdf PDF
Attch_4_-_Site_Visit_Reservation_Form.pdf PDF
Attch_2_-_CD_(MFR).pdf PDF
Attch_4_-_Site_Visit_Reservation_Form.pdf PDF
Attch_7_-_Past_and_Present_Performance_Questionaire.pdf PDF
Attch_3_-_Workload_Data_(18_Apr_14).pdf PDF
Attch_6_-_Past_Present_Performance_Form.pdf PDF
14-R-0003_Custodial_(Final).pdf PDF
Attch_5_-_Question_Form.pdf PDF
Attch_1_-_PWS_(5_May_14).pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA5270-14-R-0003

1.Task: Sweep/Dust Mop and Damp Mop Floors

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 217 Admin 602 ft2 23 20 22 21 20 22 22 21 23 23 21 22 260 svs 156,520 ft2

4460 671 ft2 23 20 22 21 20 22 22 21 23 23 21 22 260 svs 174,460 ft2

107 127 ft2 23 20 22 21 20 22 22 21 23 23 21 22 260 svs 33,020 ft2 sub-total 1,400 ft2 - - - - - - - - - - - - - svs 364,000 ft2

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 4506 21,020 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,672,300 ft2

4511 20,451 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,464,615 ft2

4513 21,020 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,672,300 ft2

4528 21,020 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,672,300 ft2

4531 20,451 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,464,615 ft2

4533 21,020 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,672,300 ft2

10182 8,848 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 3,229,520 ft2

10184 8,848 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 3,229,520 ft2

10186 8,848 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 3,229,520 ft2

10188 8,848 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 3,229,520 ft2

376 21,323 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,782,895 ft2

377 21,623 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,892,395 ft2

378 21,623 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,892,395 ft2

846 21,623 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,892,395 ft2

847 21,623 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,892,395 ft2

848 21,623 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,892,395 ft2

858 20,049 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,317,885 ft2

859 20,049 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,317,885 ft2

867 21,623 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,892,395 ft2

868 21,623 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,892,395 ft2

869 12,175 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,443,875 ft2

871 12,175 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,443,875 ft2

872 21,623 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,892,395 ft2

1086 21,623 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,892,395 ft2

1087 12,175 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,443,875 ft2

1088 12,175 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,443,875 ft2

2602 21,623 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,892,395 ft2

2604 21,623 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 7,892,395 ft2

26 15,423 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 5,629,395 ft2

27 15,329 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 5,595,085 ft2

1670 15,423 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 5,629,395 ft2

1669 15,329 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 5,595,085 ft2 sub-total 569,852 ft2 - - - - - - - - - - - - - svs 207,995,980 ft2

2. Hi-Rises and Mid-Rises Common Area (Lobby, multi purpose room, center stairs and admin areas), Minimum Requirement: Seven (7) times weekly (Monday to Sunday)

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

Workload Estimate for MFH

1. MFH Office Facilities, Minimum Requirement: Five (5) times weekly (Monday to Friday)

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

4506 4,779 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,348 ft2

4511 4,779 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,348 ft2

4513 4,779 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,348 ft2

4528 4,779 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,348 ft2

4531 4,779 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,348 ft2

4533 4,779 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,348 ft2

10182 4,800 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,600 ft2

10184 4,800 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,600 ft2

10186 4,800 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,600 ft2

10188 4,800 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,600 ft2

376 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

377 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

378 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

846 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

847 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

848 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

858 4,779 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,348 ft2

859 4,779 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,348 ft2

867 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

868 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

869 7,200 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 86,400 ft2

871 7,200 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 86,400 ft2

872 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

1086 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

1087 7,200 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 86,400 ft2

1088 7,200 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 86,400 ft2

2602 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

2604 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

26 1,785 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 21,420 ft2

27 1,790 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 21,480 ft2

1670 1,785 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 21,420 ft2

1669 1,790 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 21,480 ft2 sub-total 169,846 ft2 - - - - - - - - - - - - - svs 2,038,152 ft2

Total 741,098 ft2 - - - - - - - - - - - - - svs 210,398,132 ft2

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated

3. Hi-Rises and Mid-Rises Fire escape stairways, Minimum Requirement: Monthly

2.Task: Vacuum/Clean Carpet, Rugs, Walk-off Mats and Artificial Grass Floor Covering

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

217 Admin 10,916 ft2 23 20 22 21 20 22 22 21 23 23 21 22 260 svs 2,838,160 ft2

217 Lobby 1,046 ft2 23 20 22 21 20 22 22 21 23 23 21 22 260 svs 271,960 ft2

4460 1,284 ft2 23 20 22 21 20 22 22 21 23 23 21 22 260 svs 333,840 ft2

107 1,767 ft2 23 20 22 21 20 22 22 21 23 23 21 22 260 svs 459,420 ft2 sub-total 15,013 ft2 - - - - - - - - - - - - - svs 3,903,380 ft2

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

4506 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

4511 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

4513 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

4528 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

4531 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

4533 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

10182 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

10184 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

10186 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

10188 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

376 343 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 125,195 ft2

377 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

378 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

846 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

847 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

848 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

858 24 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 8,760 ft2

859 24 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 8,760 ft2

867 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

868 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

869 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

871 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

872 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

2. Hi-Rises and Mid-Rises Common Area (Lobby, multi purpose room, center stairs and admin areas), Minimum Requirement: Seven (7) times weekly (Monday to Sunday)

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

1. (a)MFH Office Facilities, Minimum Requirement: Weekly (Mondays) (b)Bldg #217, MFH Office Lobby Area, Minimum Requirement: Five(5) times weekly (Monday to Friday)

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

1086 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

1087 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

1088 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

2602 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

2604 48 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 17,520 ft2

26 42 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 15,330 ft2

27 42 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 15,330 ft2

1670 42 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 15,330 ft2

1669 42 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 15,330 ft2 sub-total 1,759 ft2 - - - - - - - - - - - - - svs 642,035 ft2

Total 16,772 ft2 - - - - - - - - - - - - - svs 4,545,415 ft2

3.Task: Low Dusting

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 217 Admin 1,152 ft2 4 4 5 4 4 5 4 4 5 4 5 4 52 svs 59,904 ft2

217 Lobby 105 ft2 4 4 5 4 4 5 4 4 5 4 5 4 52 svs 5,460 ft2

4460 196 ft2 4 4 5 4 4 5 4 4 5 4 5 4 52 svs 10,192 ft2

107 289 ft2 4 4 5 4 4 5 4 4 5 4 5 4 52 svs 15,028 ft2 sub-total 1,742 ft2 - - - - - - - - - - - - - svs 90,584 ft2

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 4506 2,102 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 767,230 ft2

4511 2,045 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 746,425 ft2

4513 2,102 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 767,230 ft2

4528 2,102 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 767,230 ft2

4531 2,045 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 746,425 ft2

4533 2,102 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 767,230 ft2

10182 885 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 323,025 ft2

10184 885 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 323,025 ft2

10186 885 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 323,025 ft2

10188 885 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 323,025 ft2

376 2,162 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 789,130 ft2

377 2,162 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 789,130 ft2

378 2,162 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 789,130 ft2

846 2,162 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 789,130 ft2

847 2,162 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 789,130 ft2

848 2,162 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 789,130 ft2

858 2,005 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 731,825 ft2

859 2,005 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 731,825 ft2

867 2,162 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 789,130 ft2

868 2,162 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 789,130 ft2

869 1,218 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 444,570 ft2

2. Hi-Rises and Mid-Rises Common Area (Lobby, multi purpose room, center stairs and admin areas), Minimum Requirement: Seven (7) times weekly (Monday to Sunday)

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

1. MFH Office Facilities, Minimum Requirement: Weekly (Tuesdays)

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

871 1,218 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 444,570 ft2

872 2,162 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 789,130 ft2

1086 2,162 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 789,130 ft2

1087 1,218 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 444,570 ft2

1088 1,218 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 444,570 ft2

2602 2,162 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 789,130 ft2

2604 2,162 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 789,130 ft2

26 1,542 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 562,830 ft2

27 1,533 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 559,545 ft2

1670 1,542 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 562,830 ft2

1669 1,533 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 559,545 ft2 sub-total 57,014 ft2 - - - - - - - - - - - - - svs 20,810,110 ft2

Total 58,756 ft2 - - - - - - - - - - - - - svs 20,900,694 ft2

4.Task: Clean Interior Glass/Mirror

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 217 Admin 5,000 ft2 13 13 13 13 12 14 13 13 13 13 13 13 156 svs 780,000 ft2

4460 3,000 ft2 13 13 13 13 12 14 13 13 13 13 13 13 156 svs 468,000 ft2

107 1,000 ft2 13 13 13 13 12 14 13 13 13 13 13 13 156 svs 156,000 ft2 sub-total 9,000 ft2 - - - - - - - - - - - - - svs 1,404,000 ft2

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 4506 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

4511 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

4513 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

4528 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

4531 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

4533 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

10182 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

10184 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

10186 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

10188 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

376 18 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 6,570 ft2

377 18 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 6,570 ft2

378 18 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 6,570 ft2

846 18 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 6,570 ft2

847 18 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 6,570 ft2

848 18 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 6,570 ft2

858 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

859 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

867 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

868 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

869 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

871 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

2. Hi-Rises and Mid-Rises Common Area (Lobby, multi purpose room, center stairs and admin areas), Minimum Requirement: Daily (7) times weekly (Monday thru Sunday)

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

1. MFH Office Facilities, Minimum Requirement: Three(3) times weekly (Mon, Wed and Fridays)

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

1233823909A Highlight

1233823909A Highlight

872 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

1086 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

1087 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

1088 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

2602 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

2604 12 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 4,380 ft2

26 52 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 18,980 ft2

27 52 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 18,980 ft2

1670 52 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 18,980 ft2

1669 52 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 18,980 ft2 sub-total 580 ft2 - - - - - - - - - - - - - svs 211,700 ft2

Total 9,580 ft2 - - - - - - - - - - - - - svs 1,615,700 ft2

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 217 Admin 602 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 7,224 ft2

4460 671 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 8,052 ft2

107 127 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 1,524 ft2 sub-total 1,400 ft2 - - - - - - - - - - - - - svs 16,800 ft2

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 4506 4,779 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,348 ft2

4511 4,779 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,348 ft2

4513 4,779 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,348 ft2

4528 4,779 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,348 ft2

4531 4,779 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,348 ft2

4533 4,779 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,348 ft2

10182 4,800 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,600 ft2

10184 4,800 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,600 ft2

10186 4,800 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,600 ft2

10188 4,800 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,600 ft2

376 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

377 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

378 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

846 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

847 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

848 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

858 4,779 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,348 ft2

859 4,779 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 57,348 ft2

867 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

868 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

869 7,200 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 86,400 ft2

871 7,200 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 86,400 ft2

872 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

1086 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

2. Hi-Rises and Mid-Rises Common Area (Lobby, multi purpose room, center stairs and admin areas), Minimum Requirement: Monthly

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

5. Buff Floors

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

Total Estimated

1. MFH Office Facilities, Minimum Requirement: Monthly

1087 7,200 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 86,400 ft2

1088 7,200 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 86,400 ft2

2602 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

2604 6,372 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 76,464 ft2

26 1,785 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 21,420 ft2

27 1,790 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 21,480 ft2

1670 1,785 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 21,420 ft2

1669 1,790 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 21,480 ft2 sub-total 169,846 ft2 - - - - - - - - - - - - - svs 2,038,152 ft2

Total 171,258 ft2 - - - - - - - - - - - - - svs 2,059,332 ft2

6.Task: Sweep Exterior Floor/Pavement

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 sub-total - ft2 - - - - - - - - - - - - - svs - ft2

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 4506 11,748 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 281,952 ft2

4511 11,748 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 281,952 ft2

4513 11,748 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 281,952 ft2

4528 11,748 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 281,952 ft2

4531 11,748 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 281,952 ft2

4533 11,748 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 281,952 ft2

10182 9,861 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 236,664 ft2

10184 9,861 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 236,664 ft2

10186 9,861 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 236,664 ft2

10188 9,861 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 236,664 ft2

376 11,397 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 273,528 ft2

377 11,397 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 273,528 ft2

378 11,397 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 273,528 ft2

846 11,397 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 273,528 ft2

847 11,397 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 273,528 ft2

848 11,397 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 273,528 ft2

858 12,432 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 298,368 ft2

859 12,432 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 298,368 ft2

867 11,397 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 273,528 ft2

868 11,397 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 273,528 ft2

869 9,861 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 236,664 ft2

871 9,861 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 236,664 ft2

872 11,397 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 273,528 ft2

1086 11,397 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 273,528 ft2

2. Hi-Rises and Mid-Rises Common Area (Entrance Ramps, Driveway, Roof), Minimum Requirement: Twice(2) times Monthly

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

1. MFH Office Facilities N/A -

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

1087 9,861 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 236,664 ft2

1088 9,861 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 236,664 ft2

2602 11,397 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 273,528 ft2

2604 11,397 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 273,528 ft2

26 12,154 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 291,696 ft2

27 13,983 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 335,592 ft2

1670 12,154 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 291,696 ft2

1669 13,983 ft2 2 2 2 2 2 2 2 2 2 2 2 2 24 svs 335,592 ft2 sub-total 363,278 ft2 - - - - - - - - - - - - - svs 8,718,672 ft2

Total 363,278 ft2 - - - - - - - - - - - - - svs 8,718,672 ft2

7.Task: Grounds Policing

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 217 kab 114,091 ft2 0 0 0 0 0 0 0 0 0 0 0 0 0 svs - ft2

4460 ct 18,171 ft2 0 0 0 0 0 0 0 0 0 0 0 0 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 sub-total 132,262 ft2 - - - - - - - - - - - - - svs - ft2

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Courtney 591,846 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 216,023,790 ft2

Bazely 205,998 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 75,189,270 ft2

N Foster 535,240 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 195,362,600 ft2

Kishaba 230,770 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 84,231,050 ft2

Kinser 1,668,025 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 608,829,125 ft2

New Kisyaba 285,243 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 104,113,695 ft2

Sada 87,254 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 31,847,710 ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2

2. Hi-Rises and Mid-Rises Common Ground Area, Minimum Requirement: Six(6) times weekly (Monday to Sunday)

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

1. MFH Office Facilities, Minimum Requirement: Five(5) times weekly (Monday to Friday) -

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 sub-total 3,604,376 ft2 - - - - - - - - - - - - - svs 1,315,597,240 ft2

Total 3,736,638 ft2 - - - - - - - - - - - - - svs 1,315,597,240 ft2

8.Task: Clean Garbage Collection Area/Facility

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 sub-total - ft2 - - - - - - - - - - - - - svs - ft2

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 4506 428 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 156,220 ft2

4511 428 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 156,220 ft2

4513 428 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 156,220 ft2

4528 428 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 156,220 ft2

4531 428 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 156,220 ft2

4533 428 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 156,220 ft2

10182 401 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 146,365 ft2

10184 401 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 146,365 ft2

10186 401 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 146,365 ft2

10188 401 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 146,365 ft2

376 441 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 160,965 ft2

377 441 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 160,965 ft2

378 441 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 160,965 ft2

846 441 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 160,965 ft2

847 441 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 160,965 ft2

848 441 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 160,965 ft2

858 428 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 156,220 ft2

859 428 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 156,220 ft2

867 441 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 160,965 ft2

868 441 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 160,965 ft2

869 401 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 146,365 ft2

871 401 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 146,365 ft2

872 441 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 160,965 ft2

1086 441 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 160,965 ft2

2. Hi-Rises and Mid-Rises Garbage Collection Area/Facility, Minimum Requirement: Seven (7) times Weekly (Monday thru Sunday)

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

1. MFH Office Facilities N/A -

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

1087 401 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 146,365 ft2

1088 401 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 146,365 ft2

2602 441 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 160,965 ft2

2604 441 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 160,965 ft2

26 727 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 265,355 ft2

27 443 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 161,695 ft2

1670 727 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 265,355 ft2

1669 443 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 161,695 ft2 sub-total 14,264 ft2 - - - - - - - - - - - - - svs 5,206,360 ft2

Total 14,264 ft2 - - - - - - - - - - - - - svs 5,206,360 ft2

9.Task: Clean Elevators/Lifts

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 sub-total - ft2 - - - - - - - - - - - - - svs - ft2

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 4506 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

4511 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

4513 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

4528 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

4531 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

4533 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

10182 58 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 21,170 ft2

10184 58 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 21,170 ft2

10186 58 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 21,170 ft2

10188 58 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 21,170 ft2

376 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

377 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

378 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

846 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

847 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

848 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

858 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

859 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

867 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

868 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

869 58 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 21,170 ft2

871 58 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 21,170 ft2

872 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

1086 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

2. Hi-Rises and Mid-Rises, Minimum Requirement: Seven (7) times weekly (Monday to Sunday)

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

1. MFH Office Facilities N/A -

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

1087 58 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 21,170 ft2

1088 58 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 21,170 ft2

2602 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

2604 69 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 25,185 ft2

26 55 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 20,075 ft2

27 55 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 20,075 ft2

1670 55 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 20,075 ft2

1669 55 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 20,075 ft2 sub-total 2,064 ft2 - - - - - - - - - - - - - svs 753,360 ft2

Total 2,064 ft2 - - - - - - - - - - - - - svs 753,360 ft2

10.Task: Perform Basic Cleaning Restroom, Bathroom, Laundery and Locker Rooms

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 217 Admin 416 ft2 23 20 22 21 20 22 22 21 23 23 21 22 260 svs 108,160 ft2

4460 279 ft2 23 20 22 21 20 22 22 21 23 23 21 22 260 svs 72,540 ft2

107 753 ft2 23 20 22 21 20 22 22 21 23 23 21 22 260 svs 195,780 ft2 ft2 0 svs - ft2 sub-total 1,448 ft2 - - - - - - - - - - - - - svs 376,480 ft2

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 4506 30 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 10,950 ft2

4511 30 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 10,950 ft2

4513 30 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 10,950 ft2

4528 30 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 10,950 ft2

4531 30 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 10,950 ft2

4533 30 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 10,950 ft2

10182 164 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 59,860 ft2

10184 164 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 59,860 ft2

10186 164 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 59,860 ft2

10188 164 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 59,860 ft2

376 180 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 65,700 ft2

377 180 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 65,700 ft2

378 180 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 65,700 ft2

846 180 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 65,700 ft2

847 180 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 65,700 ft2

848 180 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 65,700 ft2

858 30 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 10,950 ft2

859 30 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 10,950 ft2

867 180 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 65,700 ft2

868 180 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 65,700 ft2

869 164 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 59,860 ft2

871 164 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 59,860 ft2

872 180 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 65,700 ft2

1086 180 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 65,700 ft2

2. Hi-Rises and Mid-Rises Common Area Restrooms, Bathrooms, Minimum Requirement: Seven (7) times weekly (Monday thru Sunday)

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

1. MFH Office Facilities, Minimum Requirement: Five(5) times weekly (Monday to Friday)

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

1087 164 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 59,860 ft2

1088 164 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 59,860 ft2

2602 180 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 65,700 ft2

2604 180 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 65,700 ft2

26 208 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 75,920 ft2

27 164 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 59,860 ft2

1670 208 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 75,920 ft2

1669 164 ft2 31 30 31 31 28 31 30 31 30 31 31 30 365 svs 59,860 ft2 sub-total 4,456 ft2 - - - - - - - - - - - - - svs 1,626,440 ft2

Total 5,904 ft2 - - - - - - - - - - - - - svs 2,002,920 ft2

11.Task: Strip, Scrub, Seal and Wax Floor

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 217 Admin 387 ft2 1 1 2 svs 774 ft2

4460 391 ft2 1 1 2 svs 782 ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 sub-total 778 ft2 - - - - - - - - - - - - - svs 1,556 ft2

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 4506 19,070 ft2 1 1 2 svs 38,140 ft2

4511 18,501 ft2 1 1 2 svs 37,002 ft2

4513 19,070 ft2 1 1 2 svs 38,140 ft2

4528 19,070 ft2 1 1 2 svs 38,140 ft2

4531 18,501 ft2 1 1 2 svs 37,002 ft2

4533 19,070 ft2 1 1 2 svs 38,140 ft2

10182 7,330 ft2 1 1 2 svs 14,660 ft2

10184 7,330 ft2 1 1 2 svs 14,660 ft2

10186 7,330 ft2 1 1 2 svs 14,660 ft2

10188 7,330 ft2 1 1 2 svs 14,660 ft2

376 18,781 ft2 1 1 2 svs 37,562 ft2

377 19,081 ft2 1 1 2 svs 38,162 ft2

378 19,081 ft2 1 1 2 svs 38,162 ft2

846 19,081 ft2 1 1 2 svs 38,162 ft2

847 19,081 ft2 1 1 2 svs 38,162 ft2

848 19,081 ft2 1 1 2 svs 38,162 ft2

858 18,099 ft2 1 1 2 svs 36,198 ft2

859 18,099 ft2 1 1 2 svs 36,198 ft2

867 19,081 ft2 1 1 2 svs 38,162 ft2

868 19,081 ft2 1 1 2 svs 38,162 ft2

869 10,657 ft2 1 1 2 svs 21,314 ft2

871 10,657 ft2 1 1 2 svs 21,314 ft2

872 19,081 ft2 1 1 2 svs 38,162 ft2

1086 19,081 ft2 1 1 2 svs 38,162 ft2

2. Hi-Rises and Mid-Rises Common Area (Lobby, multi purpose room, center stairs, elevators and admin area), Minimum Requirement: Semi-Annual

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

1. MFH Office Facilities, Minimum Requirement: Semi-Annual

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

1233823909A Highlight

1087 10,657 ft2 1 1 2 svs 21,314 ft2

1088 10,657 ft2 1 1 2 svs 21,314 ft2

2602 19,081 ft2 1 1 2 svs 38,162 ft2

2604 19,081 ft2 1 1 2 svs 38,162 ft2

26 12,382 ft2 1 1 2 svs 24,764 ft2

27 13,207 ft2 1 1 2 svs 26,414 ft2

1670 12,382 ft2 1 1 2 svs 24,764 ft2

1669 13,207 ft2 1 1 2 svs 26,414 ft2 sub-total 501,278 ft2 - - - - - - - - - - - - - svs 1,002,556 ft2

Total 502,056 ft2 - - - - - - - - - - - - - svs 1,004,112 ft2

12.Task: Clean Exterior and Interior Side of Windows/Doors

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 217 Admin 5,000 ft2 1 1 2 svs 10,000 ft2

4460 3,000 ft2 1 1 2 svs 6,000 ft2

107 1,000 ft2 1 1 2 svs 2,000 ft2 ft2 0 svs - ft2 sub-total 9,000 ft2 - - - - - - - - - - - - - svs 18,000 ft2

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 4506 294 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 3,528 ft2

4511 294 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 3,528 ft2

4513 294 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 3,528 ft2

4528 294 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 3,528 ft2

4531 294 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 3,528 ft2

4533 294 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 3,528 ft2

10182 447 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 5,364 ft2

10184 447 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 5,364 ft2

10186 447 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 5,364 ft2

10188 447 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 5,364 ft2

376 536 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 6,432 ft2

377 536 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 6,432 ft2

378 536 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 6,432 ft2

846 536 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 6,432 ft2

847 536 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 6,432 ft2

848 536 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 6,432 ft2

858 237 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 2,844 ft2

859 237 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 2,844 ft2

867 536 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 6,432 ft2

868 536 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 6,432 ft2

869 447 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 5,364 ft2

871 447 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 5,364 ft2

872 536 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 6,432 ft2

1086 536 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 6,432 ft2

2. Hi-Rises and Mid-Rises Common Area (Lobby, multi purpose room, center stairs, elevators and admin area), Minimum Requirement: Monthly

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

1. MFH Office Facilities, Minimum Requirement: Semi-Annual (Exact date services will be performed shall be submitted by the contractor)

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

1087 447 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 5,364 ft2

1088 447 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 5,364 ft2

2602 536 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 6,432 ft2

2604 536 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 6,432 ft2

26 5,889 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 70,668 ft2

27 6,263 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 75,156 ft2

1670 5,889 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 70,668 ft2

1669 6,263 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 75,156 ft2 sub-total 36,550 ft2 - - - - - - - - - - - - - svs 438,600 ft2

Total 45,550 ft2 - - - - - - - - - - - - - svs 456,600 ft2

13.Task: Clean/Shampoo Carpet

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 217 Admin 10,916 ft2 1 1 2 svs 21,832 ft2

217 Lobby 1,046 ft2 1 1 2 svs 2,092 ft2

4460 1,284 ft2 1 1 2 svs 2,568 ft2

107 1,767 ft2 1 1 2 svs 3,534 ft2 sub-total 15,013 ft2 - - - - - - - - - - - - - svs 30,026 ft2

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 4506 ft2 0 svs - ft2

4511 ft2 0 svs - ft2

4513 ft2 0 svs - ft2

4528 ft2 0 svs - ft2

4531 ft2 0 svs - ft2

4533 ft2 0 svs - ft2

10182 ft2 0 svs - ft2

10184 ft2 0 svs - ft2

10186 ft2 0 svs - ft2

10188 ft2 0 svs - ft2

376 ft2 0 svs - ft2

377 ft2 0 svs - ft2

378 ft2 0 svs - ft2

846 ft2 0 svs - ft2

847 ft2 0 svs - ft2

848 ft2 0 svs - ft2

858 ft2 0 svs - ft2

859 ft2 0 svs - ft2

867 ft2 0 svs - ft2

868 ft2 0 svs - ft2

869 ft2 0 svs - ft2

871 ft2 0 svs - ft2

872 ft2 0 svs - ft2

1086 ft2 0 svs - ft2

2. Hi-Rises and Mid-Rises N/A -

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

1. MFH Office Facilities, Minimum Requirement: Semi-Annual

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

1087 ft2 0 svs - ft2

1088 ft2 0 svs - ft2

2602 ft2 0 svs - ft2

2604 ft2 0 svs - ft2

26 ft2 0 svs - ft2

27 ft2 0 svs - ft2

1670 ft2 0 svs - ft2

1669 ft2 0 svs - ft2 sub-total - ft2 - - - - - - - - - - - - - svs - ft2

Total 15,013 ft2 - - - - - - - - - - - - - svs 30,026 ft2

14.Task: Perform High Dusting

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 217 Admin 1,152 ft2 1 1 2 svs 2,304 ft2

217 Lobby 105 ft2 1 1 2 svs 210 ft2

4460 196 ft2 1 1 2 svs 392 ft2

107 289 ft2 1 1 2 svs 578 ft2 sub-total 1,742 ft2 - - - - - - - - - - - - - svs 3,484 ft2

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 4506 2,102 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 25,224 ft2

4511 2,045 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 24,540 ft2

4513 2,102 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 25,224 ft2

4528 2,102 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 25,224 ft2

4531 2,045 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 24,540 ft2

4533 2,102 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 25,224 ft2

10182 885 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 10,620 ft2

10184 885 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 10,620 ft2

10186 885 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 10,620 ft2

10188 885 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 10,620 ft2

376 2,162 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 25,944 ft2

377 2,162 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 25,944 ft2

378 2,162 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 25,944 ft2

846 2,162 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 25,944 ft2

847 2,162 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 25,944 ft2

848 2,162 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 25,944 ft2

858 2,005 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 24,060 ft2

859 2,005 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 24,060 ft2

867 2,162 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 25,944 ft2

868 2,162 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 25,944 ft2

869 1,218 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 14,616 ft2

871 1,218 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 14,616 ft2

872 2,162 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 25,944 ft2

1086 2,162 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 25,944 ft2

2. Hi-Rises and Mid-Rises Common Area (Lobby, multi purpose room, center stairs and admin area), Minimum Requirement: Monthly (Exact date services shall be submitted by the contractor)

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

1. MFH Office Facilities, Minimum Requirement: Semi-Annual (Exact date services shall be submitted by the contractor)

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

1087 1,218 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 14,616 ft2

1088 1,218 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 14,616 ft2

2602 2,162 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 25,944 ft2

2604 2,162 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 25,944 ft2

26 1,547 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 18,564 ft2

27 1,533 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 18,396 ft2

1670 1,547 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 18,564 ft2

1669 1,533 ft2 1 1 1 1 1 1 1 1 1 1 1 1 12 svs 18,396 ft2 sub-total 57,024 ft2 - - - - - - - - - - - - - svs 684,288 ft2

Total 58,766 ft2 - - - - - - - - - - - - - svs 687,772 ft2

15.Task: Remove Trash

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 217 Admin 100 ft2 23 20 22 21 20 22 22 21 23 23 21 22 260 svs 26,000 ft2

4460 15 ft2 23 20 22 21 20 22 22 21 23 23 21 22 260 svs 3,900 ft2

107 10 ft2 23 20 22 21 20 22 22 21 23 23 21 22 260 svs 2,600 ft2 ft2 0 svs - ft2 sub-total 125 ft2 - - - - - - - - - - - - - svs 32,500 ft2

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 4506 ft2 0 svs - ft2

4511 ft2 0 svs - ft2

4513 ft2 0 svs - ft2

4528 ft2 0 svs - ft2

4531 ft2 0 svs - ft2

4533 ft2 0 svs - ft2

10182 ft2 0 svs - ft2

10184 ft2 0 svs - ft2

10186 ft2 0 svs - ft2

10188 ft2 0 svs - ft2

376 ft2 0 svs - ft2

377 ft2 0 svs - ft2

378 ft2 0 svs - ft2

846 ft2 0 svs - ft2

847 ft2 0 svs - ft2

848 ft2 0 svs - ft2

858 ft2 0 svs - ft2

859 ft2 0 svs - ft2

867 ft2 0 svs - ft2

868 ft2 0 svs - ft2

869 ft2 0 svs - ft2

871 ft2 0 svs - ft2

872 ft2 0 svs - ft2

1086 ft2 0 svs - ft2

2. Hi-Rises and Mid-Rises N/A -

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

1. MFH Office Facilities, Minimum Requirement: Five(5) times weekly (Monday to Friday)

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

1087 ft2 0 svs - ft2

1088 ft2 0 svs - ft2

2602 ft2 0 svs - ft2

2604 ft2 0 svs - ft2

26 ft2 0 svs - ft2

27 ft2 0 svs - ft2

1670 ft2 0 svs - ft2

1669 ft2 0 svs - ft2 sub-total - ft2 - - - - - - - - - - - - - svs - ft2

Total 125 ft2 - - - - - - - - - - - - - svs 32,500 ft2

16.Task: Clean Drinking Fountains

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 217 Admin 3 ft2 23 20 22 21 20 22 22 21 23 23 21 22 260 svs 780 ft2

4460 2 ft2 23 20 22 21 20 22 22 21 23 23 21 22 260 svs 520 ft2 ft2 0 svs - ft2 ft2 0 svs - ft2 sub-total 5 ft2 - - - - - - - - - - - - - svs 1,300 ft2

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 4506 ft2 0 svs - ft2

4511 ft2 0 svs - ft2

4513 ft2 0 svs - ft2

4528 ft2 0 svs - ft2

4531 ft2 0 svs - ft2

4533 ft2 0 svs - ft2

10182 ft2 0 svs - ft2

10184 ft2 0 svs - ft2

10186 ft2 0 svs - ft2

10188 ft2 0 svs - ft2

376 ft2 0 svs - ft2

377 ft2 0 svs - ft2

378 ft2 0 svs - ft2

846 ft2 0 svs - ft2

847 ft2 0 svs - ft2

848 ft2 0 svs - ft2

858 ft2 0 svs - ft2

859 ft2 0 svs - ft2

867 ft2 0 svs - ft2

868 ft2 0 svs - ft2

869 ft2 0 svs - ft2

871 ft2 0 svs - ft2

872 ft2 0 svs - ft2

1086 ft2 0 svs - ft2

2. Hi-Rises and Mid-Rises N/A -

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

Total Estimated Quantity

1. MFH Office Facilities, Minimum Requirement: Five(5) times weekly (Monday to Friday)

Facility Estimated Quantity

Minimum Requirement for Each Month Annual Frequency

1087 ft2 0 svs - ft2

1088 ft2 0 svs - ft2

2602 ft2 0 svs - ft2

2604 ft2 0 svs - ft2

26 ft2 0 svs - ft2

27 ft2 0 svs - ft2

1670 ft2 0 svs - ft2

1669 ft2 0 svs - ft2 sub-total - ft2 - - - - - - - - - - - - - svs - ft2

Total 5 ft2 - - - - - - - - - - - - - svs 1,300 ft2

Level 5

File details come from the government source that posted it. Updated .