RFQ_RFI_Responses_-_Wash_Rack_-_CO_signed.pdf
PDF 86 KB Posted
- Attached to
- Horizontal Closed Loop Wash Rack System Federal contract opportunity
- Solicitation number
- FA5240-16-Q-M057
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Specifications_SOW.pdf | ||
| Combo_Signed_Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
18 August 16
MEMORANDUM FOR ALL INTERESTED PARTIES
FROM: 36 CONS/LGCB
Bldg 22026 Unit 14040
Andersen AFB, Yigo, GU 96929
SUBJECT: Responses to Questions/Requests for Information Submitted FA5240-16-Q-M057:
The following questions have been submitted by interested parties. All questions and answers are included as follows:
Q1: In the SOW section titled 3,000 Gallon Settling Tank. Should the 3,000 gallon Stainless tank described in this section actually be a 300 gallon stainless tank and the 3,000 gallon tank would be the poly rain tank?
A1: It is a 300 gallon stainless steel tank and a 3,000 gallon poly rain tank. There was an extra 0 added by accident.
Q2: Does the government require a 1 year parts and labor warranty with on-site monthly preventative maintenance?
A2: Yes, we require a 1 year warranty but the company does an onsite PM to keep the warranty valid.
Q3: Does the government require the system to be fully installed onsite including off loading and placing of the components?
A3: Yes.
Q4: Please confirm if the filtration system is to be provide built into a 20' equipment enclosure to protect it from the elements?
A4: Yes that is correct.
Q5: Is the contractor required to provide typhoon blocks and galvanized cables for the container and all tanks located outside?
A5: Yes.
Q6: Is the contractor required to provide all piping and labor to make water connection to the equipment?
DEPARTMENT OF THE AIR FORCE
36TH CONTRACTING SQUADRON (PACAF)
ANDERSEN AIR FORCE BASE, GUAM
A6: Yes.
Q7: If so is the contractor required to provide a new backflow preventer?
A7: Yes.
Q8: Is the contractor required to connect the wash rack system to base power?
A8: Yes.
Q9: The 24" wide galvanized conveyor listed in the specification, is this conveyor to be placed in a concrete wash pad? It will be in a trench in an existing concrete pad.
If so please confirm the length?
A9: 18 Feet.
Q10: Is the contractor responsible for providing the dimensional drawings for the concrete trough for the conveyor?
A10: Yes.
Q11: Will the customer be providing the concrete work?
A11: No, our shop will be cutting the existing concrete pad to widen the trench for the conveyor.
We will also be repairing the existing curbs to the contractors specs.
KELLI FLOYD
Contracting Officer
| 2016-08-18T14:47:52+1000 | |
| FLOYD.KELLI.ANN.1300642469 |
File details come from the government source that posted it. Updated .