4._FA520918Q0155_Atch_1_-_Specs.pdf

PDF 114 KB Posted

Attached to
Spreader Feeder Machine Federal contract opportunity
Solicitation number
FA520918Q0155
Issued by
Department of the Air Force Pacific Air Forces

About this file

FA520918Q0155 - Atch 1 - Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Spreader Feeder Machine, newest first.
File Type Posted
SF30_Document.pdf PDF
2._Notice_to_Offeror_DS_-_Amend_0001.pdf PDF
2._Notice_to_Offeror_DS_-_Amend_0001.pdf PDF
FA520918Q0155_Amend_0001.pdf PDF
5._FA520918Q0155_Atch_2_-_Map.pdf PDF
2a.__Gate_Pass_Req.pdf PDF
2._Notice_to_Offeror_DS.pdf PDF
3._FA520918P0155.pdf PDF
1.__Business_w_US_Govt.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

< Specification > SPREADER‐FEEDING MACHINE for Laundry Plant, Front‐loading

< Recommended Item Description >

Mfr : TOTO Folder Industory Co.,Ltd Model: SONIC‐ES4‐EX‐33 or equal

< Minimum Requirements >

Motor: Inverter Drive Station: 4 stations Conveyor Speed: 10~60m/min Voltage Frequency: 3 Phase, 200V, 50/60Hz Utility: Air 0.6~Mpa (Max) Machine Installation Parameter: Width: 4,950mm (Max) / Depth: 3,405mm (Max)

Height: 2,395mm(Max) / Weight: 4,500kg (Max) Course Log: Able to program 4 kinds (minimum) Language: Operational instructions on the touch panel screen must be in Japanese Capable to Spread/feed : Flat sheet, Fitted Sheet, Duvet cover

Tablecloth (Square and Round shape) Minimum Requirements:

(1) Auto‐Lock Function: should stop working synchronously when any one of the machines

(Flat Ironer and Flat work Folder) stop working whether by accidental or emergency circumstances.

(2) Able to interlock speed adjustment with relative equipment; Flat ironer, Flat work folder

(3) Easy to have repair parts and technical support for maintain.

(4) Instruction manual book in Japanese. Japanese Operation instructions on machine.

(5) Upper part is able to lift up when worker don’t use it. See below picture.

FA520918Q0155

Attachment 1

Delivery Date: 90 days after receipt of order

< Includes followings >

Ship to Bldg #154‐4, Sagami General Depot Delivery / Installation Removal of old machine and move to out of the Laundry Plant (see attached map) Piping Connection Construction Power Connection Construction Trial Run and Adjustment / On‐site training for operation 1‐year Warranty