Attach_1_-_Instructions_to_Offerors.pdf
PDF 169 KB Posted
- Attached to
- AE Repair CHPP Electrical Panel, Phase A Federal contract opportunity
- Solicitation number
- FA5004-AE-FTQW180504
About this file
Instructions to Offerors
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach_2_-_Evaluation_Factors.pdf | ||
| Attach_3_-_Statement_of_Work.pdf | ||
| Attach_4_-_SF330.pdf | ||
| Attachment_5_-_PPQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Synopsis Attachment 1 – Instructions to Offerors Project Name:
Repair CH&PP Electrical Panels/Circuits
Project Number: FTQW 18-0504
QUALIFICATION PACKAGE PREPARATION INSTRUCTIONS
To assure timely and equitable evaluation of qualification packages, offerors must follow the instructions contained herein. Vendors are required to meet all instruction requirements. Failure to meet a requirement may result in a vendor being excluded from evaluation. Vendors must clearly identify any exception to the instructions and provide complete accompanying rationale.
Submit one (1) complete original and one (1) electronic copy
i. Cover Letter including company name, point of contact information to include phone number and email, DUNS number and CAGE code, business type (large business, small business, small disadvantaged business, 8(a)-certified small disadvantaged business, HUBZone small business, woman-owned small business, very small business, veteran-owned small business, service-disabled veteran-owned small business).
ii. Submit a completed SF 330 Part I specific to the Renovate Base Ops B1215 requirement and
SF 330 Part II if one is not already on file with the 354th Contracting Squadron. Please note, IAW FAR 52.244-4: Subcontractors and Outside Associates and Consultants (Architect-
Engineer Services)(Aug 1998): Any subcontractors, outside associates, or consultants required by the Contractor in connection with the services covered by any resulting contract will be limited to individuals or firms that were specifically identified and evaluated up front. The Contractor shall obtain the Contracting Officer’s written consent before making any substitution for these subcontractors, associates, or consultants. DO NOT SUBMIT
ANY PRICING INFORMATION WITH YOUR SF 330. Pricing information will be requested prior to negotiations from the vendor the government determines most qualified for the project.
iii. Contractors are responsible for submitting Past Performance Questionnaire (PPQ). This document should be completed in full and submitted to the Points of Contact listed below with their final packages.
iv. Teaming Agreement identification: The prime firm shall provide a statement in the cover letter confirming whether or not there are executed teaming agreements in place for team members as part of the SF-330 submittal. The statement shall also list team members.
(Contractor teaming arrangements are defined as (1) a partnership or joint venture between two or more companies or (2) an agreement for a specific Government opportunity between a potential prime contractor and one or more companies that are potential subcontractors.)
v. Electronic packages should be emailed to tanya.gutka@us.af.mil with a courtesy copy to donovan.wall@us.af.mil.
vi. Hand-carried packages must be deposited at the 354th Contracting Squadron, 2310 Central
Ave, Eielson AFB, AK 99702. The sealed envelope or package used to submit your qualifications must be marked “SOURCE SELECTION SENSITIVE” and must show the time and date specified for receipt, the Synopsis Number, and the name and address of the mailto:tanya.gutka@us.af.mil mailto:donovan.wall@us.af.mil.
Synopsis Attachment 1 – Instructions to Offerors Project Name:
Repair CH&PP Electrical Panels/Circuits
Project Number: FTQW 18-0504 offeror. Vendors are cautioned that Eielson AFB, AK has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance. SOME DELAY SHOULD BE ANTICIPATED WHEN HAND CARRYING
PACKAGES. Vendors should allow sufficient time to obtain a visitor pass and arrive at the
Contracting Squadron PRIOR to the time specified for receipt. Vendors are required to submit all electronic copies of the packages in Adobe Acrobat or Microsoft Word.
vii. If mailing the package, the sealed envelope or package used to submit your package must be marked “SOURCE SELECTION SENSITIVE” and must show the time and date specified for receipt, the synopsis number, and the name and address of the offeror. The mailing address to send proposals:
Mail to:
354 CONS/LGCA
ATTN: Tanya Gutka
BLDG 2258 Central Ave, Room 300
Eielson, AFB Alaska 99702
DISPOSITION OF PROPOSALS: The original proposal and related information will be retained with the contract file. All extra copies will be destroyed after completion of evaluations.
Primary POC email: tanya.gutka@us.af.mil
Alternate POC email: donovan.wall@us.af.mil mailto:tanya.gutka@us.af.mil mailto:donovan.wall@us.af.mil
File details come from the government source that posted it. Updated .