About this file
This document contains questions and answers regarding solicitation number FA500023Q0084 for racks, cabinets, and doors from the Department of the Air Force Pacific Air Forces. The questions and answers provide clarification on pricing requirements, with bidders asked to incorporate shipping costs for all ten requested line items to Joint Base Elmendorf-Richardson in Alaska into the unit prices rather than listing shipping as a separate line item. Acceptable response formats are identified as either squeezing pricing into the provided schedule, submitting pricing on a separate spreadsheet, or providing a single combined lot quote with shipping incorporated into the total price.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Combined Synopsis-Solicitation RCD.pdf | ||
| Requirements List.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers:
Question 1:
Can you advise the exact ship to address for this equipment so we can have our distributor work on the freight costs for this heavy equipment? I see the below information, but was wondering if there is a building or road address for the final destination.
Answer:
8515 SHARP AVE WAREHOUSE BAY 13
ELMENDORF AFB
AK 99506-0001
UNITED STATES
Question 2:
The COMBINED SYNOPSIS/SOLICITATION ‘COMBO’: Appendix 1: PRICING SCHEDULE only has room for 5 line items listed, but the solicitation has 10 line item products. Do you want us to squeeze it in? Or should I just list 1 Combined Lot Quote with Shipping included?
Answer:
1 Combined Lot Quote with Shipping and/or a quotation with a full price breakdown such as one that could be made on, but not necessarily, an Microsoft Excel spreadsheet, are both acceptable.
Question 3:
The solicitation asks us to include ***Shipping costs to JBER, AK 99506 MUST be included within the unit prices.*** Does that mean you want us to incorporate the shipping cost into each line item of each 10 products listed? Or is it ok to just have 1 large shipping cost incorporated into the final total bid? Right now we have a shipping total for the entire Lot (for all 10 items combined) not divided separately into each of the 10 line items requested.
Answer:
Please do not include shipping as a separate line item and incorporate it into the items requested.