Updated Salient Characteristics.pdf

PDF 17 KB Posted

Attached to
Custom Audio Booth Federal contract opportunity
Solicitation number
FA500019SX030
Issued by
Department of the Air Force Pacific Air Forces

View the file

Other files for this federal contract opportunity

Other files attached to Custom Audio Booth, newest first.
File Type Posted
Audio Booth QA updated.pdf PDF
Updated AudioBooth floor plan.pdf PDF
FA500019SX030_GSA-RFQ Audio Booth UPDATED.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SALIENT CHARACTERISTICS

Request the purchase of a customized Integrated Sound Room

• Single wall control side with double wall exam suite

• Noise isolation class (NIC) rating of 66 or greater

• Noise reduction coefficient (NRC) of 1.08 or greater

• Roof mounted LED lighting system with dimmer switches in control and exam sides

• Walk-thru design of doors between control and testing side

• Exterior dimensions 209” x 125” x 99” overall height

• Invisible cable system: recessed low voltage cable chase internal to the wall panels that allow equipment cable to run “unseen” from panel to panel within the cable chase

• ADA compliant for wheel chair and scooter access

• Three duplex outlets with jack panels

• Three recessed conduit drops

• 36” nominal clear opening door with large window

• 16” x 60 “ window in doors

• Patient test window 26 x 32 or larger

• Multimedia panel with 26” touchscreen monitor that is acoustically sealed and structurally enhanced recess inside panels in exam room to create flush mounted touch screen

• Cam-Locking wall and roof construction (allows for disassembly and relocation of the sound booth without damaging the integrity of the panels and safeguarding acoustic performance)

• High performance Low profile steel floor system to allow for ease of access to room with height of the threshold at the door of 2 inches with stainless steel threshold transition ramp

• Installer is responsible to connect fire suppression and electrical. (Connection points are prepped and in close proximity) No HVAC needed

• Booth must have factory installed sprinkler heads

File details come from the government source that posted it. Updated .