Combo.docx
DOCX document 52 KB Posted
- Attached to
- AK RCC Furniture Federal contract opportunity
- Solicitation number
- FA5000-17-T-0206
About this file
Combined solicitation/synopsis
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
[Type here]
COMBINED SYNOPSIS/SOLICITATION ‘COMBO’:
AK RCC Furniture
(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.
(ii) Solicitation FA5000-17-T-0206 is issued as a Request for Quote (RFQ).
(iii) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-95, effective 19 Jan 2017. The DFARS provisions and clauses are those in effect to DPN 20161222, effective 22 December 2016. The AFFARS provisions and clauses are those in effect to AFAC 2017-0127, effective 27 January 2017.
(iv) This requirement is solicited under ‘Small Business Set Aside’ competition. The North American Industrial Classification System (NAICS) code associated with this procurement is 337211 with a small business size standard of 1,000 Employees.
(v) The Pricing Schedule is incorporated as Attachment 1. Vendors shall complete Attachment 1 in its entirety and return with any other documentation/data as required by this Combo.
(vi) The government intends to award a firm-fixed price contract for the following:
(vii) Delivery shall be FOB Destination 60 Days ARO. Contractor shall include delivery schedule information on the Pricing Schedule, Attachment 1. All items shall be delivered to:
Joint Base Elmendorf-Richardson, Anchorage Alaska, 99506
(viii) FAR 52.212-1 Instructions to Offerors -- Commercial Items (Jan 2017) is hereby incorporated by reference, with the same force and effect as if it were given in full text. In addition to the following addendum, all terms and conditions of FAR 52.212-1 remain in effect. The following have been tailored to this procurement and are hereby added via addendum:
1. To assure timely and equitable evaluation of the quotes, the Offerors must follow the instructions contained herein. The quote must be complete, self-sufficient, and respond directly to the requirements of this solicitation. If awarded the contract the contractor is required to submit a signed copy of the contract confirming receipt of the contractual document within five (5) business days.
2. Specific Instructions: The response shall consist of the following:
a. Submit one (1) copy of technical acceptability narrative
b. Submit one (1) copy of price schedule (Attachment 1) and any pertinent additional information
(ix) FAR 52.212-2 Evaluation -- Commercial Items (Oct 2014) this provision has been tailored to this procurement and is provided in full-text below:
(a) The Government will award a purchase order resulting from this solicitation to whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate quotes:
(1) Technical acceptability
(2) Price
(b) Technical acceptability: The government will evaluate quotes on the basis of whether or not the provided quote is technically acceptable.
(c) Price: The government will rank all quotes by price. If the lowest priced quote is found acceptable, an award will be made without further consideration. If that quote is found unacceptable, the Government will evaluate the next lowest quote for acceptability until an award can be made to the lowest priced acceptable quoter.
(x) Each vendor shall ensure the provision at FAR 52.212-3 including its Alternate I, Vendors Representations and Certifications--Commercial Items (Jan 2017) are updated at www.sam.gov. Failure to obtain SAM registration will result in submissions not being considered for award.
(xi) The clause at FAR 52.212-4, Contract Terms and Conditions – Commercial Items (Jan 2017), is hereby incorporated by reference, with the same force and effect as if it were given in full text. The full text of a clause may be accessed electronically at this address:
http://farsite.hill.af.mil/
(xii) The clause at FAR 52.212-5, Contract Terms and Conditions Required To Implement Statutes Or Executive Orders – Commercial Items (Jan 2017), is hereby incorporated by reference, with the same force and effect as if it were given in full text. Additionally, the following clauses apply to this acquisition:
| FAR 52.204-7 |
| System for Award Management |
| Oct 2016 |
| FAR 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| Oct 2016 |
| FAR 52.204-16 |
| Commercial and Government Entity Code Reporting |
| Jul 2016 |
| FAR 52.204-17 |
| Ownership or Control of Offeror |
| Jul 2016 |
| FAR 52.204-18 |
| Commercial and Government Entity Code Maintenance |
| Jul 2016 |
| FAR 52.204-19 |
| Incorporation by Reference of Representations and Certifications |
| Dec 2014 |
| FAR 52.204-20 |
| Predecessor of Offeror |
| Jul 2016 |
| FAR 52.209-6 |
| Protecting the Government's Interest When Subcontracting with Vendors Debarred, Suspended, or Proposed for Debarment |
| Oct 2015 |
| FAR 52.219-6 |
| Notice of Total Small Business Set-Aside |
| Nov 2011 |
| FAR 52.219-28 |
| Post Award Small Business Program Representation |
| Jul 2013 |
| FAR 52.222-3 |
| Convict Labor |
| Jun 2003 |
| FAR 52-222-19 |
| Child Labor-Cooperation With Authorities and Remedies |
| Oct 2016 |
| FAR 52.222-21 |
| Prohibition of Segregated Facilities |
| Apr 2015 |
| FAR 52.222-22 |
| Previous Contracts and Compliance Reports |
| Feb 1999 |
| FAR 52.222-26 |
| Equal Opportunity |
| Sep 2016 |
| FAR 52.222-36 |
| Affirmative Action for Workers with Disabilities |
| Jul 2014 |
| FAR 52.222-50 |
| Combating Trafficking in Persons |
| Mar 2015 |
| FAR 52.223-6 |
| Drug-Free Workplace |
| May 2001 |
| FAR 52.223-18 |
| Encouraging Vendor Policies to Ban Text Messaging While Driving |
| Aug 2011 |
| FAR 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| Jun 2008 |
| FAR 52.225-25 |
| Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certifications |
| Oct 2015 |
| FAR 52.232-33 |
| Payment by Electronic Funds Transfer-- System for Award Management. |
| Jul 2013 |
| FAR 52.232-39 |
| Unenforceability of Unauthorized Obligations |
| Jun 2013 |
| FAR 52.232-40 |
| Providing Accelerated Payments to Small Business Subvendors |
| Dec 2013 |
| FAR 52.233-1 |
| Disputes |
| May 2014 |
| FAR 52.233-3 |
| Protest after Award |
| Aug 1996 |
| FAR 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| Oct 2004 |
| FAR 52.237-1 |
| Site Visit |
| Apr 1984 |
| FAR 52.247-34 |
| F. o. b. Destination |
| Nov 1991 |
| FAR 52.247-64 |
| Preference for Privately Owned U.S.-Flag Commercial Vessels |
| Feb 2006 |
| DFARS 252.203-7000 |
| Requirements Relating To Compensation of Former DoD Officials |
| Sep 2011 |
| DFARS 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| Sep 2013 |
| DFARS 252-203-7005 |
| Representation Relating to Compensation of Former DoD Officials |
| Nov 2011 |
| DFARS 252.204-7008 |
| Compliance with Safeguarding Covered Defense Information Controls |
| Oct 2016 |
| DFARS 252.204-7011 |
| Alternative Line Item Structure |
| Sep 2011 |
| DFARS 252.204-7012 |
| Safeguarding Covered Defense Information and Cyber Incident Reporting |
| Oct 2016 |
| DFARS 252.204-7015 |
| Disclosure of Information to Litigation Support Vendors |
| May 2016 |
| DFARS 252.211-7003 |
| Item Unique Identification and Valuation |
| Mar 2016 |
| DFARS 252.211-7008 |
| Use of Government-Assigned Serial Numbers |
| Sep 2010 |
| DFARS 252.213-7000 |
| Notice to Prospective Suppliers on Use of Past Performance Information Retrieval System—Statistical Reporting in Past Performance Evaluations |
| Jun 2015 |
| DFARS 252.223-7008 |
| Prohibition of Hexavalent Chromium |
| Jun 2013 |
| DFARS 252.225-7002 |
| Qualifying Country Sources as Subvendors |
| Dec 2016 |
| DFARS 252.225-7036 |
| Buy American—Free Trade Agreements—Balance of Payments Program |
| Dec 2016 |
| DFARS 252.225-7048 |
| Export-Controlled Items |
| Jun 2013 |
| DFARS 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| Jun 2012 |
| DFARS 252.232-7006 |
| Wide Area Workflow Payment Instructions |
| May 2013 |
| DFARS 252.232-7010 |
| Levies on Contract Payments |
| Dec 2006 |
| DFARS 252.244-7000 |
| Subcontracts for Commercial Items |
| Jun 2013 |
| DFARS 252.246-7004 |
| Safety of Facilities, Infrastructure, and Equipment for Military Operations |
| Oct 2010 |
| DFARS 252.247-7023 |
| Transportation of Supplies by Sea--Basic |
| Apr 2014 |
| AFFARS 5352.201-9101 |
| Ombudsman |
| Jun 2016 |
| AFFARS 5352.223-9001 |
| Health and Safety on Government Installations |
| Nov 2012 |
| AFFARS 5352.242-9000 |
| Contractor Access to Air Force Installations |
| Nov 2012 |
FAR 52.252-1 - Solicitation Provisions Incorporated by Reference (Feb 1998) is hereby incorperated by full text.
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address:
http://farsite.hill.af.mil/
FAR 52.252-2 – Clauses Incorperated by Reference (Feb 1998) is hereby incorporated by full text.
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:
http://farsite.hill.af.mil/
(2) The Government may seek any available remedies in the event the Contractor fails to perform in accordance with the terms and conditions of the contract as a result of Government action under this clause.
(End of clause)
(xiii) No additional contract requirements apply to this acquisition.
(xiv) This acquisition does not require a Defense Priorities and Allocations System (DPAS) rating.
(xv) NOTICE TO ALL INTERESTED PARTIES:
Questions shall be submitted to:
A1C Sierra Miller at sierra.miller@us.af.mil
Please forward all questions no later than 10:00 a.m. Alaska Time on 08 September 2017.
Site Visit Details:
When: 7 September 2017, 10:00 AM AKDT Where: All parties are to meet at the Boniface Gate Visitors Center, JBER, AK
Base Access:
All contractors will be required to present a valid picture ID (driver’s license or passport). Due to the Real ID Act of 2005, drivers’ licenses from Kentucky, Maine, Montana, Pennsylvania, Minnesota, Missouri, Washington, and American Samoa will not be accepted; in this case, passports, federally issued identification cards or U.S. permanent resident cards will suffice. All contractors who will be driving are required to provide up-to-date vehicle registration and insurance.An amendment will be issued answering all questions received, providing the Government’s answers.
Offers are due no later than 2:00 p.m. Alaska Time on 12 September 2017.
(xvi) The POC for this solicitation is:
A1C Sierra Miller sierra.miller@us.af.mil
(907) 552-3053
List of Attachments:
· Attachment 1: Pricing Schedule (2 pages)
· Attachment 2: Performance Work Statement (7 Pages)
FA5000-17-T-0206
Attachment 1: PRICING SCHEDULE
2 Pages
| LINE ITEM |
| DESCRIPTION |
| QTY |
| UI |
| UNIT PRICE |
| EXTENDED PRICE |
| 0001: |
| Scope of Work: |
-Dismantle all existing furniture and removing all cabling (power, fiber and CAT5) in preparation for re-utilization and install.
-Furnish and install the equipment defined above furniture in the 176th ADS Room 27 Located at building 9480 on Elmendorf Air force base in Anchorage Alaska.
- Use existing furniture currently located in Room 27 to the maximum extent possible.
-Furnish and install equipment to meet requirements listed on attachment 1(Q 55328 – ALCOM NORAD Room 27.pdf) and in correspondence to Figure 2.
-Provide all labor, hardware and reutilize existing cabling as to provide a complete functioning system inclusive of all ancillary costs such as travel, shipping, equipment rental and miscellaneous.
-Remove and dispose at contractors’ location all extra parts and pieces not used.
Government furnished equipment, supplies, and duties
-Power for proposed systems to be provided by Government in the location indicated by the installation team.
-Any structural modifications to wall necessary to support the proposed systems are to be provided by the Government.
-Any painting and patching necessary to repair the facility due to the required modifications are to be provided by the Government.
-Fiber and CAT5 termination to be performed by Government (Contractor to re-run existing cables).
Site Access/Working Hours:
-Site access will be provided during the hours of 0730-1630, Monday-Friday.
Please see attached Figures 1 & 2
| 1 |
| EA |
TOTAL PRICE:
***Shipping costs to JBER, AK 99506 MUST be included within the unit prices. *** Offers will hereby expire on 30 Sept 2017
Business Size: Small Large Women-Owned Veteran-Owned Other:__________________________
| Net Terms (Mandatory): |
| CAGE |
| DUNS: |
| Printed Name |
| Title |
| Signature |
| Date |
NOTE: The individual signing must be a signatory official for this Entity; signature constitutes agreement to all terms/conditions contained within this solicitation.
Attachment 2:
Performance Work Statement
7 Pages
AKRCC Back Offices Refurbishment Performance Work Statement
1. Facility Description
Defense Support of Civilian Authorities (DSCA) Operations Area
The Alaska Rescue Coordination Center requires a turnkey solution to support up to (4) search and rescue operator positions and additional furnishing to accommodate (6) support personnel. Personnel require furniture that is modular, metal frame construction (desk/consoles), can accommodate various computer and communication equipment and ergonomically suitable for 24/7 operations. All proposals must include in their scope: shipping to site, offload of all materials to the room of rest, staging, installation and clearing of all debris. A final walkthrough by the manufacturer-certified installation technicians is required for training and acceptance.
2. General Conditions
Comply with the applicable provisions of the referenced standards except as modified by governing codes and the Contract Documents. Where a recommendation or suggestion occurs in the referenced standards, such recommendation or suggestion shall be considered mandatory. In the event of conflict between referenced standards, this specification or within themselves, the more stringent standard or requirement shall govern.
3. Salient Characteristics
3.1. The AKRCC requires a furniture solution that can accommodate a 24 X 7 mission operations environment. Design must facilitate complex interaction between people, technology and environment. Hinged, sliding or adjustable furniture pieces shall be offered with a lifetime warranty. Lift columns shall be covered with a 5 year labor and parts warranty.
3.2 Solution shall be modular and reconfigurable in design, with the ability to reasonably adapt to future system upgrades. The AKRCC is a mission critical operation with high demands and unique challenges, which requires absolute functionality in design and also fit a limited to space available.
3.3 Solution must offer substantial cable management systems that provide complete storage of all required cables. Dual cable management chains shall be offered in all sit to stand desk/consoles. Chains shall travel from the highest position to the lowest and prevent cable kinking in the optional sit/stand version.
3.4 Conference tables must provide storage for various cabling and power strips
3.5 Desk/consoles shall have the ability to have accessories mounted on adjustable slat walls. The slat wall shall be a minimum of 12” in height.
3.6 Communication storage cabinets must provide sufficient venting and cable access areas for installed equipment.
3.7 Adjacent furniture shall provide cable raceways and or access holes to easily run various cabling from each section.
3.8 Product must be able to be assembled by the manufacturer’s certified installation team using standard tools without any cutting or drilling. The manufacturer shall provide a toolkit with spare parts, and project paperwork upon completion of the install. Product must be rigid and self-supporting to permit individual removal, relocation or modification of adjacent modules.
4. Offeror qualifications:
4.1 Due to the unique mission requirements for this project, the offeror must have the following qualifications before offer will be considered: Offeror shall demonstrate extensive experience in implementing and managing similar projects with the DoD community.
4.2 Equipment manufacturer must maintain and provide a copy of ISO-9001 quality certification.
4.3 Product and installation services must meet the NSTISSAM 2-95 standards.
4.4 Offeror must submit examples of previous projects that comply with this requirement.
4.5 Equipment manufacturer must maintain and supply a copy of their GREENGUARD certification for low chemical emissions UL 2818.
4.6 All offerors must conduct a site visit before the closing date of the RFQ to conduct measurement of the facility and incorporate the measurements into their proposed design.
5. GSA Parts List
Please see enclosed bill of materials and drawings as the basis of required design.
Background Required to replace aged, piecemealed and associated furniture utilized by the Alaska Rescue Coordination Center (AKRCC) in support of 11AF Search and Rescue Operations with newer, ergonomic, multi-functional furniture capable of supporting SAR controllers and support personnel along with mission essential equipment in a 24/7, 365 day environment. All items will be located in building 10471, suite 122 in the Alaska Rescue Coordination Center.
Scope of Work All rooms -Furnish and install the equipment defined below and in attached documents at in the AKRCC facility on Joint Base Elmendorf Fort Richardson in Anchorage Alaska.
-Provide all labor, hardware and cabling as to provide a complete functioning system inclusive of all ancillary costs such as travel, shipping, equipment rental miscellaneous.
-Provide onsite visit of facility to include measurement of desired work site location -Train designated representatives on usage and maintenance of installed furnishings DSCA Operations Area -Furnish and install two (2) sit to stand corner style desk/consoles, two (2) fixed linear style desk/consoles, and two (2) equipment cabinets.
-Furnish and install one (1) standing height conference/planning table, one (1) printer cabinet, one (1) storage cabinet, and four (4) standard pedestals.
-Furnish six (6) conference room/planning table office stools, and two (2) magnetic porcelain whiteboards -Furnish and install one (1) sliding door (frosted) Directors Office -Furnish and install two (2) sit to stand linear style desk/consoles, two (2) credenzas with hutch and wardrobe locker -Furnish and install one (1) round conference table, one (1) TV/entertainment console, and one (1) book shelf -Furnish two (2) 4’ x 6’ magnetic porcelain white boards NCOICs Office -Furnish and install two (2) sit to stand corner style desk/consoles, one (1) storage cabinet, two (2) overhead storage bins, and two (4) standard pedestals -Furnish and install 7’ foot high panel walls with window panes at top to surround office -(outside office) Furnish and install two (2) storage cabinets and twelve (12) cubbie style storage lockers Gym -Furnish and install one (1) 9’ x 4’6” wall mirror Operations Floor Entrance -Furnish and install one (1) display cabinet, and one (1) display case Government furnished equipment, supplies, and duties -Power for proposed systems to be provided by Government in the location indicated by the installation team.
-Cable paths, communication ports, and electrical outlets are to be provided by Government to and from locations required to support the proposed systems.
-Removal of current furnishings, computers and communication equipment to be provided by the government prior to installation of new furnishings -Any painting and patching necessary to repair the facility due to the required modifications are to be provided by the Government.
-Base access for site visit and installation team will be provided by government Site Access/Working Hours -Site access will be provided during the hours of 0730-1700, Monday-Friday
The following parts list is cumulative for all back office areas
1) Directors Office
1) (1) - TABLE-ROUND, 48 DIA
2) (1) - BASE-X, 36W
3) (2) - SCREEN-PERSONAL / MODESTY, FIXED,48W X 12H
4) (2) - POWER STRIP-USB, 2 OUTLETS, CLAMP MOUNT
5) (1) - WARDROBE, PLINTH BASE, DOOR HINGED LEFT HAND, 24D X 15W X 65 5/8H
6) (1) - WARDROBE, PLINTH BASE, DOOR HINGED RIGHT HAND, 24D X 15W X 65 5/8H
7) (2) - OLOGY; CABLE RISER
8) (2) - OLOGY; DESK-RECTANGLE, ELECTRIC, DEPTH: 29.00000, WIDTH: 70.00000
9) (2) - WHITEBOARD-PREMIUM, TRIM TYPE: EDGE SERIES, HEIGHT: 48.25000, WIDTH: 72.25000
10) (1) - BOOKCASE, HIGH PRESSURE LAMINATE, 36W X 28 1/2H
11) (1) - SHELL-DESK, HIGH PRESSURE LAMINATE, 24D X 42W
12) (1) - SHELL-DESK, HIGH PRESSURE LAMINATE, 24D X 72W
13) (2) - SHELL-DESK, HIGH PRESSURE LAMINATE, 24D X 72W
14) (1) - LATERAL FILE-UNDER WORKSURFACE, 22D X 27H X 36W
15) (1) - PEDESTAL-UNDER WORKSURFACE, BOX / BOX / FILE, 23D X 27H
16) (2) - TACKBOARD-OVERHEAD STORAGE, 70W
17) (2) - OVERHEAD STORAGE-DOOR, 72W
18) (1) - SLATWALL, 48W X 12H
19) (2) - POWER STRIP-USB, 2 OUTLETS, RAIL MOUNT
20) (2) - DUAL MONITOR ARM W/ DESK CLAMP & GROMMET MOUNT. SILVER
21) (2) - DASH; LIGHT-TASK, LED, RAIL MOUNT BRACKET
22) (1) - LIGHT-LED, 60 WATT, LINEAR, STAND ALONE, DAISY CHAIN STARTER, 58W
23) (1) - SLATWALL, 60W X 12H
24) (2) - BRACKET-SLATWALL, WALL MOUNT, 12H
2)DSCA Operations Center
1) (1) - POTRERO415; TABLE-STANDING HEIGHT,RECTANGLE, DEPTH: 48.00000, WIDTH: 84.00000
2) (2) - POWER STRIP-USB, 2 OUTLETS, CLAMP MOUNT
3) (4) - OLOGY; CABLE RISER
4) (1) - OLOGY; DESK-90 DEGREE, ELECTRIC, DEPTH - LEFT: 30.00000, DEPTH - RIGHT: 30.00000, WIDTH - LEFT: 58.00000, WIDTH - RIGHT: 76.00000
5) (1) - OLOGY; DESK-90 DEGREE, ELECTRIC, DEPTH - LEFT: 30.00000, DEPTH - RIGHT: 30.00000, WIDTH - LEFT: 76.00000, WIDTH - RIGHT: 58.00000
6) (1) - WHITEBOARD-PREMIUM, TRIM TYPE: EDGE SERIES, HEIGHT: 54.00000, WIDTH: 132.00000
7) (1) - WHITEBOARD-PREMIUM, HEIGHT: 36.00000, WIDTH: 30.00000
8) (1) - UNIVERSAL; BIN-IN THE CASE,TECHNOLOGY / ANSWER / KICK APPLICATION, 24W
9) (1) - UNIVERSAL; BIN-IN THE CASE,TECHNOLOGY / ANSWER / KICK APPLICATION, 30W
10) (1) - BOOKCASE, 2 ADJUSTABLE SHELVES, 15D X 24W X 40H
11) (1) - BRACKET-WALL ATTACHMENT, HORIZONTAL, 24W
12) (1) - BRACKET-WALL ATTACHMENT, HORIZONTAL, 30W
13) (2) - PEDESTAL-MOBILE, BOX / BOX / FILE, 22D X 27H
14) (1) - CABINET-STORAGE, 2 ADJUSTABLE SHELVES, FLUSH STEEL FRONT, 18D X 30W X 40H
15) (1) - CABINET-STORAGE, 5 ADJUSTABLE SHELVES, FLUSH STEEL FRONT, 24D X 30W X 83 1/2H
16) (4) - PEDESTAL-MOBILE, HIGH PRESSURE LAMINATE, BOX / BOX / FILE, 22D X 27H
17) (2) - TOP-RECTANGLE, HIGH PRESSURE LAMINATE, 30D X 72W
18) (2) - LEG-SQUARE POST, PACKAGE QUANTITY 4, 27H LEGS
19) (1) - GROMMET, PACKAGE QUANTITY 10
20) (1) - CHANNEL-REINFORCING, 57D
21) (1) - WORKSURFACE-STRAIGHT, PLASTIC EDGE, LAMINATE, 1/2 CORD DROP, 23 1/2D X 54W
22) (6) - FOCUS, MIDBACK, MESH BACK, BASIC STOOL, A152, HEIGHT ADJ ARMS, MESH BACK
23) (4) - PROCESSOR SLING-VERTICAL
24) (2) - POWER STRIP-USB, 2 OUTLETS, RAIL MOUNT
25) (4) - Dual monitor arm w/ Desk Clamp & Grommet Mount. Silver
26) (2) - DASH; LIGHT-TASK, LED, C CLAMP BRACKET
27) (2) - DASH; LIGHT-TASK, LED, RAIL MOUNT BRACKET
28) (1) - STANCHION-SLATWALL, FREESTANDING
29) (1) - SLATWALL, 24W X 12H
30) (2) - SLATWALL, 30W X 18H
31) (4) - SLATWALL, 36W X 18H
32) (6) - SLATWALL, WALL BRACKET, 18H
3)NCOIC Office
1) (1) - SERIES 5; WORKSURFACE-90 DEGREE,EXTENDED, RIGHT HAND, UNIVERSAL SYSTEMS APPLICATION,58WL X 23DL X 76WR X 23DR
2) (1) - SERIES 5; WORKSURFACE-90 DEGREE, EXTENDED, LEFT HAND, UNIVERSAL SYSTEMS APPLICATION, 76WL X 23DL X 58WR X 23DR
3) (3) - POWER STRIP-USB, 2 OUTLETS, CLAMP MOUNT
4) (2) - UNIVERSAL; BIN-IN THE CASE,TECHNOLOGY / ANSWER / KICK APPLICATION,36W
5) (1) - CABINET-STORAGE, 2 ADJUSTABLE SHELVES,FLUSH STEEL FRONT, 18D X 36W X 40H
6) (1) - CABINET-STORAGE, 2 ADJUSTABLE SHELVES,FLUSH STEEL FRONT, 18D X 36W X 40H
7) (2) - SHELF, ANSWER / KICK APPLICATION, 30W
8) (1) - FILE-LATERAL, HIGH PRESSURE LAMINATE,FREESTANDING, 24D X 28 1/2H X 36W
9) (2) - PEDESTAL-MOBILE, HIGH PRESSURE LAMINATE, BOX / BOX / FILE, 22D X 27H
10) (2) - SHELL-DESK, HIGH PRESSURE LAMINATE, 24D X 66W
11) (3) - WINDOW-SINGLE PANE, 12H X 30W, GLASS :6500 CLEAR GLASS
12) (3) - WINDOW-SINGLE PANE, 12H X 30W, GLASS :6530 FROSTED
13) (4) - WINDOW-SINGLE PANE, 12H X 36W, GLASS :6500 CLEAR GLASS
14) (4) - WINDOW-SINGLE PANE, 12H X 36W, GLASS :6530 FROSTED
15) (2) - TACKBOARD, 18H X 36W
16) (3) - PANEL SKIN, LAMINATE, FLOOR, 24H X 30W
17) (2) - MARKERBOARD, STEEL SKIN, 24H X 30W
18) (7) - PANEL SKIN-TACKABLE ACOUSTICAL,24H X 30W
19) (4) - PANEL SKIN, LAMINATE, FLOOR, 24H X 36W
20) (12) - PANEL SKIN-TACKABLE ACOUSTICAL,24H X 36W
21) (3) - FRAME-HORIZONTAL PACKAGE, THIN, 30W
22) (4) - FRAME, HORIZONTAL PACKAGE, THIN, 36W
23) (2) - JUNCTION-END OF RUN, THIN, 78H
24) (4) - JUNCTION-IN LINE, THIN, 78H
25) (1) - JUNCTION-L, THIN, 78H
26) (2) - JUNCTION-WALL START, 78H
27) (3) - WALL HANGING CHANNEL, 66H
28) (1) - ANSWER; DOOR-SLIDING, 78H X 36W, INSERT :6625 TRANSLUCENT
29) (1) - WORKSURFACE-STRAIGHT, PLASTIC EDGE, LAMINATE, 1/2 CORD DROP, 23 1/2D X 72W
30) (2) - BRACKET-SLATWALL, ANSWER / KICK / PRIVACY WALL BRACKET APPLICATION, 18H
31) (2) - PROCESSOR SLING-VERTICAL
32) (2) - DUAL MONITOR ARM W/ DESK CLAMP & GROMMET MOUNT. SILVER
33) (2) - DASH; LIGHT-TASK, LED, C CLAMP BRACKET
34) (2) - LIGHT-SHELF, LED, 18 1/2W
35) (2) - LIGHT-SHELF, LED, DAISY CHAIN SECONDARY,18 1/2W
36) (2) - PANEL SKIN-HARD SURFACE, 24H X 30W
37) (2) - SLATWALL, 30W X 18H
38) (1) - SLATWALL, 36W X 18H
39) (1) - SLATWALL, WALL BRACKET, 18H
40) (4) - ZONE FOUR STORAGE LOCKER, 20''D x 15''W x 62''H, LEFT HAND
41) (2) - SOTO; MOBILE CADDY
42) (6) - BINDER HOLDER
43) (6) - LETTER TRAY-LANDSCAPE, 12W
44) (8) - PEN / PENCIL CUP
45) (4) - UNIVERSAL SHELF
46) (6) - TELEPHONE CADDY
47) (8) - PERSONAL SHELF
48) (1) - CHART HOLDER-2 TIER, SLATWALL
49) (6) - SLATSHELF-LANDSCAPE, 12W
50) (4) - CABLE RING, PACKAGE QUANTITY 4
File details come from the government source that posted it. Updated .