MODIFICATION TO SOW and ATTACHMENT 6
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA5000-15-P-0151.pdf | ||
| QandA.pdf | ||
| FA5000-15-T-0241_Asbestos-Carpet-4251.pdf | ||
| MFR_Att6_Carpet-or-Tile.pdf | ||
| MFR-Bldg-Info.pdf | ||
| MFR_Att6_Bldg-4251-Diagram.pdf | ||
| MFR_Measurement.pdf | ||
| Att8_FAR52.222-42.pdf | ||
| FA5000-15-T-0241_Asbestos-Carpet-4251.pdf | ||
| Att9_WD05-2017.pdf | ||
| Att2_252.203-7998_Att3_252.203-7999.pdf | ||
| Att5_SOW-673LRS.pdf | ||
| Att7_AES_SampleReports.pdf | ||
| Att6_Bldg-4251-Diagram.pdf | ||
| Att4_252.209-7992.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
673D AIR BASE WING
JOINT BASE ELMENDORF-RICHARDSON ALASKA
24 September 2015
MEMORANDUM FOR 673 CONS/LGCC
FROM 673 CONS/LGCC
10480 Sijan Ave, Suite 356
JBER, AK 99506
SUBJECT: FA5000-15-T-0241: MODIFICATION TO SOW and ATTACHMENT 6
1. The following information has been added to the Statement of Work:
5. Description of work and special Instructions:
5.1 Existing Conditions
5.1.1 Unit will remove all furniture from office prior to start of work. The contractor will identify, coordinate and communicate area where work is to begin NLT 14 days prior to start of work.
5.1.2 Abate and remove and dispose of existing carpet, carpet pad, mastic, vinyl asbestos tile as necessary to complete the work described in this document.
*The area is estimated to be 37,000 square feet.
*See Attachment 6 for the building diagram has been updated to reflect the tile/carpet area.
5.1.3 Remove and dispose of existing debris / adhesive residue
5.1.4 Provide a clean smooth, true level plane and surface preparation for the install of carpet.
5.1.5 Protect all existing furnishings, equipment and finishes that are not scheduled for removal.
Patch and repaint areas damaged during abatement and removal process. Return all existing finishes to pre-construction conditions.
5.2 Finishes
5.2.1 Install commercial grade, high traffic carpet in a dark gray or dark blue color.
5.2.2 Provide and install coverbase/ wall base board molding to match existing in the area.
5.2.3 Provide adhesives for flooring and base accessories as recommended by the manufacturer. Also comply with local indoor air quality and hazardous material procurement and disposal standards.
5.2.4 All work to be inspected and accepted by Government Official/ Representative upon completion.
2. Attachment 6 has been modified to reflect the tiled areas, the rest are carpet.
3. The quotes will now be due by 1600 (4 pm) on 25 Sept. 2015 Alaska Standard Time. Please resubmit a quote if the changes affect your submission.
4. Please contact Nicholle Mills at 907-552-7181, or email at nicholle.mills.1@us.af.mil with any questions or concerns.
NICHOLLE S. MILLS, CIV, USAF
Contracting Specialist
| 2015-09-24T16:25:46-0800 | |