J&A_Single_Source_Justification_ESCO_BAK-14M.pdf

PDF 206 KB Posted

Attached to
BAK-14M Installation Support Services Federal contract opportunity
Solicitation number
FA486117PB070
Issued by
Department of the Air Force Air Combat Command

About this file

J&A Single Source Justification

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Single Source Justification (Simplified Acquisition)

20 Apr 2017 Page 1 of 2

Section A: General Contract Information

Contracting Activity: 99 CONS/LGCB

Project/Program Name: BAK-14M Installation Support Services ESCO

Purchase Request/Identification Number: F3GHBA7153AW01

Estimated Contract Cost (including Options): $86,750.00

Section B: Description of the Supplies/Services Required

The 820th RHS has a requirement for installation support services for the BAK-14M dual runway and Phoenix Aircraft Arresting Control System (PAACS) on the Nellis AFB airfield. The services will include seven (7) weeks of on-site representation of a technical expert to advise on proper installation of the system.

Section C: Justification for Soliciting from a Single Source or Brand Name

There are only two companies worldwide that manufacture aircraft arresting systems, Zodiac Aerospace (Parent Company of Engineered Arresting Systems Corporation (ESCO) and Scandinavian Manufacturing SCAMA AB. The aircraft arresting system previously purchased by the government that is to be installed at Nellis AFB is an ESCO system. This acquisition is for the purchase of highly specialized ESCO filed service support and installation of electric/ communications systems that will enable the 820th RHS engineers to provide a complete ESCO system that is fully certified to meet all USAF requirements. On 22 March 2017, Capt. Michael J. Christopher, 820th RHS, confirms that ESCO system is currently in place on Nellis AFB.

Section D: Efforts to Obtain Competition

Market research was conducted and there are only two companies worldwide that manufacture aircraft arresting systems, Zodiac Aerospace (Parent Company of Engineered Arresting Systems Corporation (ESCO) and Scandinavian Manufacturing SCAMA AB. The aircraft arresting system previously purchased by the government that is to be installed at Nellis AFB is an ESCO system. On 11 April 2017, via phone and email, a representative from Engineering Arresting Systems Corporation (ESCO) (Alex Delgrosso) confirmed that (ESCO) is the sole proprietor of their products and services. ESCO is registered in SAM. FAR Part 13, Simplified Acquisition Procedures, will be utilized for this effort. Recommend other than full and open competition after exclusion of sources. FAR Part 13, Simplified Acquisition Procedures, will be utilized for this effort.

Section E: Steps to Preclude Future Single Source or Brand Name Awards

At the end of the life cycle of the BAK-14M the Government may have the opportunity to compete for an aircraft arresting system that may solicit more competition.

20 Apr 2017 Page 2 of 2

Section F: Contracting Officer's Determination

I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.

Date

12-Jun-2017

Typed Name and Rank/Grade of Contracting Officer

EDWIN GUTIERREZ, GS-13, DAF

Signature of Contracting Officer

20 Apr 2017 Page of Section A: General Contract Information Section B: Description of the Supplies/Services Required Section C: Justification for Soliciting from a Single Source or Brand Name Section D: Efforts to Obtain Competition Section E: Steps to Preclude Future Single Source or Brand Name Awards Section F: Contracting Officer's Determination I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.

9.0.0.2.20120627.2.874785

Security_Markings:
CurrentPage:
PageCount:
Contract_Activity: 99 CONS/LGCB
Project_Name: BAK-14M Installation Support Services ESCO
PR-ID_Number: F3GHBA7153AW01
Estimated_Cost: $86,750.00
Text:
Date: 12-Jun-2017
Name: EDWIN GUTIERREZ, GS-13, DAF
Signature:

File details come from the government source that posted it. Updated .