PERFORMANCE WORK STATEMENT
FOR
561 JOINT TACTICS SQUADRON
TACTICS, TECHNIQUES AND PROCEDURES MANUALS
FA4861-12-R-C003 01 August 2011
Attachment 1
TABLE OF CONTENTS
SECTION/TITLE PAGE
| 1. DESCRIPTION OF SERVICES | 2 |
| 1.1 Scope of Work | 2 |
| 1.1 Contractor Qualifications | 3 |
| 1.3 FMS Manual Production | 4 |
| 1.4 FMS Start-Up Volumes | 5 |
| 1.5 FMS Follow-On Volumes | 7 |
| 1.6 AFTTP Manual Production | 8 |
| 1.7 AFTTP Start-Up Volumes | 9 |
| 1.8 AFTTP Follow-On Volumes | 10 |
| 1.9 Contractor Travel Service | 11 |
| 1.10 Service Outcome Description | 11 |
2. SERVICES SUMMARY 12
3. GOVERNMENT FURNISHED PROPERTY
| AND SERVICES | 16 |
| 3.1 General Information | 16 |
| 3.2 Government Furnished Property | 16 |
| 3.3 Government Provided Services | 17 |
| 4. GENERAL INFORMATION | 19 |
| 4.1 General Security Responsibilities | 19 |
| 4.2 Data Security | 19 |
| 4.3 Information Systems Security | 20 |
| 4.4 Personnel Security | 20 |
| 4.5 Contractor Appearance | 21 |
| 4.6 Physical Security | 21 |
| 4.7 Safety Requirements | 21 |
| 4.8 Reserved | 21 |
| 4.9 General Information Publications and Forms | 25 |
APPENDIX
A-1. Technical Definitions Peculiar to this PWS 26
SECTION 1
DESCRIPTION OF SERVICES
1.0 Introduction.
1.1 Scope of Work. FMS tactics employment manual production will constitute the bulk of this contract. The Contractor will provide all personnel, supervision, equipment, tools, materials, and services necessary to develop and produce as needed Foreign Military Sales (FMS) Tactics Employment Manuals and select Air Force Tactics, Techniques, and Procedures (AFTTP) manuals for the United States Air Force, as defined in this Performance Work Statement (PWS), except as specified as “government furnished.”
1.1.1 AFTTP manuals are divided into two series: predominately classified Tactical Employment, known as the AFTTP 3-1 series; and predominately unclassified Combat Fundamentals, known as the AFTTP 3-3 series. The 561st Joint Tactics Squadron (JTS) at Nellis AFB, NV, produces the AFTTP 3-1 & 3-3 tactics manual series and is the agency responsible for executing this CSAF directive. The AFTTP 3-1 & 3-3 series volumes are produced using Adobe Acrobat, Adobe FrameMaker, Adobe Photoshop, Adobe Illustrator, and other support software.
1.1.2 CSAF Directive. The Chief of Staff of the AF directed that USAF tactical employment doctrine be released to our allied nations (ref. Guidelines for Disclosure of USAF Tactics and Capabilities, 21 Aug 2009). The primary means to accomplish this tasking is to edit existing USAF tactical doctrine, known as AFTTP manuals, into a product suitable for foreign release.
1.1.3 Current 561 JTS tasking, workload and schedule preclude government production of foreign employment doctrine and selected out-of-cycle USAF tactics manuals. It is in the best interest of the United States Air Force to outsource these additional production requirements to a qualified contractor.
1.2 Contractor Qualifications.
1.2.1 Subject Matter Expert (SME) with experience and expert knowledge as a rated aviator(s), preferably USAFWS graduate(s), specializing in Joint/Combined aerial operations and the application of aerial tactics.
1.2.1.1 Current work experience (last 5 years) working with Joint/Combined military airpower doctrine, aerial weapons capabilities, and aerial weapon systems capabilities.
1.2.1.2 Possess and maintain a current DoD Security Clearance at the SECRET level or higher (verifiable through the Joint Personnel Adjudication System [JPAS]).
1.2.1.3 Obtain a common access card (CAC) within 10 days of the contract award to permit use of the Nellis AFB SIPRNET and NIPRNET.
1.2.1.4 Possess current, verifiable USAF Information Assurance training within 15 days of contract award.
1.2.1.5 Possess expert proficiency (knowledge and ability) to use Adobe FrameMaker, Adobe Photoshop, Adobe Illustrator, and Adobe Acrobat Professional for desktop publishing on any computer operating system.
1.2.6 Demonstrated, verifiable performance in editing and producing classified and unclassified technical-military documents.
1.2.7 Provide systematic process for final tactics manual review and acceptance by the designated government officials.
1.3 FMS Manual Production
1.3.2 FMS tactics manual - background. The goal is to provide allied nation(s) with current tactics in phase with the USAF’s tactics manuals two-year revision cycle. The USAF tactics manuals are weapons system-specific, while FMS manuals are mission- specific. The primary FMS missions are: Air-to Surface (A/S), Air-to-Air (A/A), Multi-Role, Command and Control (C2), Airlift, Combat Search and Rescue (CSAR), Special Operations, Air Refueling (A/R), Tactical Air Control, Joint Terminal Air Controller (JTAC), Intelligence, Surveillance, and Reconnaissance (ISR), Information Operations (IO), and Maintenance (MX). FMS manuals are not limited to these missions only.
1.3.2.1 The Secretary of the Air Force, International Affairs division (SAF/IA) establishes foreign disclosure policy, which in turn impacts the Contractor’s editing/production process. Each allied nation’s FMS tactics manual is subject to a unique editing signature based on SAF/IA disclosure guidelines (provided to the Contractor) and the unique equipment, avionics, and weapons system suite purchased by that allied nation. In addition to SAF/IA-provided disclosure guidance and a country-specific equipment list, the Contractor will produce tactics manuals based on their independent research of the purchasing nation’s current and unique tactics, weapons and systems capabilities.
1.3.3 Four documents will be generated per country in each revision cycle: a Basic Employment Manual (BEM), an Advanced Employment Manual (AEM), a Mission Planning Manual (MPM), and an FMS Summary Document. The BEM will mirror the unclassified mission tactics of AFTTP 3-3, Combat Fundamentals Manual. The AEM will mirror the classified mission tactics of AFTTP 3-1, Tactical Employment Manual. The MPM will mirror the classified AFTTP 3-1.General Planning and Employment Considerations manual and AFTTP 3-1.Shot/Kill manual. The FMS Summary Document will be created by producing a first draft manual for a specific country using the baseline manual and will only be created for the startup category, as delineated in section 1.4.
1.3.3.1 The Air Force will provide the Contractor the most current published FrameMaker formatted version of the respective AFTTP volume for FMS conversion. Editable files provided will include: all text, layered graphics and animation files. Provided files will be configured in production ready format (complete and template-based FrameMaker book files (*.book) with working embedded intra-chapter and inner-chapter links, tables, figures, animation, videos, and external links) as well as all support files comprised in the composition of the final booked volume. AFTTP volumes provided will be thoroughly vetted and rendered free of common spelling and grammatical errors prior to release to the Contractor.
1.3.4 The Contractor will deliver to the 561 JTS upon conversion completion: all FMS source files, to include illustrations, lists, graphics and animations for all manuals they produce.
1.3.5 The Contractor will develop and implement a Quality Assurance Surveillance Plan (QASP) to ensure quality and timely performance of PWS taskings. The final QASP will be submitted to the Contracting Officer for acceptance within 30 days after contract award.
1.3.6 Production timelines for this contract will be measured from the date of official notification (DON), which begins when the Contractor is notified by the Contracting Officer that a line item delineated in the contract is to be executed. If a production deadline falls on a weekend or official government holiday, the deadline will be moved to the next government workday. FMS manuals will be grouped into two categories, Start-Up Volumes and Follow-On Volumes.
1.4 FMS Start-Up Volumes.
1.4.1 Definition. Start-up volumes are defined as the first time the Contractor has to edit a tactics document for a given mission or country grouping. A Contractor’s task will fall under Start-Up category when:
· Using a newly updated tactics manual such as the AFTTP 3-1/3-3 manual (which typically occurs every two years), or
· Developing the series for the first time for a specific mission type as determined by 561 JTS, or
· Developing the series for the first country of a given country grouping, as determined by SAF/IA.
1.4.2 Start-Up Volumes, Preparation: The 561 JTS will assemble paper and electronic copies of the current AFTTP 3-1, General Planning and Employment Considerations, AFTTP 3-1, Tactical Employment, and/or AFTTP 3-3, Combat Fundamentals manuals; assemble country-grouping disclosure guidance from SAF/IAPD, and provide an updated country equipment list to the Contractor. In conjunction with 561 JTS-provided materials, the Contractor is responsible for conducting independent research to include: contacting the equipment manufacturer; reviewing and incorporating current information sources; and assembling and reading all Original Equipment Manufacturer (OEM) manuals and user handbooks on country-specific equipment, avionics systems, and weapons system capabilities, if necessary.
1.4.3 Start-Up Volumes, Production: Basic Employment Manual (Draft). The Contractor will produce the manual by editing all text, figures, tables, and videos and apply country-unique equipment, avionics/weapons configurations, and SAF/IAPD foreign disclosure guidance. The Contractor will also review all figures and tables and remark/redraw if needed. The Contractor will then produce a draft BEM in Adobe FrameMaker convert to a portable document file (.pdf), and deliver a draft CD/DVD-ROM to the 561 JTS for review by DON + 35 business days.
1.4.4 Start-Up Volumes, Production: Advanced Employment Manual (Draft). The Contractor will produce the manual by editing all text, figures, tables, and videos and apply country-unique equipment, avionics/weapons configurations, and SAF/IAPD foreign disclosure guidance. The Contractor will also review all figures and tables and remark/redraw if needed. The Contractor will then produce a draft AEM in Adobe Frame Maker, convert to a (.pdf) file, and deliver a draft CD/DVD-ROM to the 561 JTS for review by DON + 35 business days.
1.4.5 Start-Up Volumes, Production: Mission Planning Manual (Draft). The Contractor will produce the manual by editing all text, figures, tables, and videos and apply country-unique equipment, avionics/weapons configurations, and SAF/IAPD foreign disclosure guidance. The Contractor will also review all figures and tables and remark/redraw if needed. The Contractor will then produce a draft BEM in Adobe Frame Maker, convert to a (.pdf) file, and deliver a draft CD/DVD-ROM to the 561 JTS for review by DON + 35 business days.
1.4.6 Produce: FMS Summary Document (Draft). The 561 JTS reviews draft start-up copies of the BEM, AEM, and MPM and provides the Contractor with any necessary inputs. The Contractor will then incorporate 561 JTS inputs into the draft manuals. These master draft manuals in (.pdf) format will serve as the summary document. These files will be maintained by the 561 JTS and will not be delivered to the FMS customer. The Contractor will deliver a CD/DVD-ROM to the 561 JTS by DON + 40 days.
1.4.7 Produce Final Copies of Start-Up Volumes: Basic Employment Manual, Advanced Employment Manual, Mission Planning Manuals. The Contractor will consolidate all changes required by the government in the production of final copies. The Contractor will import final text drafts, graphics and tables into FrameMaker, and convert the documents into individual (.pdf) files. In addition, the Contractor will ensure the acronym and glossary lists are current, and that all CD/DVD-ROM multi-media functions (e.g., hotlinks, videos, and animations) are operational. The Contractor will produce 10 final copies of the BEM, AEM, and MPM into CD/DVD-ROM; produce one color two-sided hard (paper) copy of the BEM, AEM and MPM for mailing per SAF/IAPD direction; and deliver the products to the 561 JTS by DON+120 business days.
1.5 FMS Follow-On Volumes.
1.5.1 Definition of Follow-On Volumes. Follow-on volumes are defined as the second or subsequent revision of the BEM, AEM, and MPM. The Contractor will create a tactics manual series for an ally with the same mission and same country disclosure grouping as the start-up series. Follow-on tasks generate a similar editing/production signature, thus allowing the Contractor to use the start-up series already produced as a building block. For example, the first country requesting an A/S tactics manual would fall under a start-up task. If a second, or subsequent country, also requests to purchase an A/S tactics manual and falls within the same disclosure release category as the first country, the task will fall within the follow-on category. The ensuing description of the follow-on series is identical to the start-up series, except that the Contractor will be using the FMS start-up series as a baseline, rather than the 561 JTS AFTTP 3-1/3 manuals.
1.5.2 Follow-On Volumes, Preparation. The Contractor will assemble paper and electronic copies of the appropriate start-up country volumes. The 561 JTS will provide the Contractor an updated country equipment list and any additional country-specific disclosure guidance set forth by SAF/IAPD. In conjunction with 561 JTS-provided materials, the Contractor is responsible for conducting independent research to include: contacting the equipment manufacturer; reviewing and incorporating current information sources; and assembling and reading all Original Equipment Manufacturer (OEM) manuals and user handbooks on country-specific equipment, avionics systems, and weapons system capabilities, if necessary.
1.5.3 Follow-On Volumes, Production: Basic Employment Manual (Draft). The Contractor will edit all text, figures, and tables by applying country-unique equipment, avionics/weapons configurations, and SAF/IAPD foreign disclosure guidance. Review all figures and tables and remark/redraw if needed. Produce a draft of the BEM in Adobe FrameMaker, and convert to (.pdf). The Contractor will deliver a draft CD/DVD-ROM to the 561 JTS for review by DON + 25 business days.
1.5.4 Follow-On Volumes, Production: Advanced Employment Manual (Draft). The Contractor will edit all text, figures, and tables by applying country-unique equipment, avionics/weapons configurations, and SAF/IAPD foreign disclosure guidance. Review all figures and tables and remark/redraw if needed. Produce a draft of the AEM in Adobe FrameMaker, and convert to (.pdf). The Contractor will deliver a draft CD/DVD-ROM to the 561 JTS for review by DON + 25 business days.
1.5.5 Follow-On Volumes, Production: Mission Planning Manual (Draft). The Contractor will edit all text, figures, and tables by applying country-unique equipment, avionics/weapons configurations, and SAF/IAPD foreign disclosure guidance. Review all figures and tables and remark/redraw if needed. Produce a draft of the MPM in Adobe FrameMaker, and convert to (.pdf). The Contractor will deliver a draft CD/DVD-ROM to the 561 JTS for review by DON + 25 business days.
1.5.6 Produce Final Copies of Follow-On Volumes: Basic Employment Manual, Advanced Employment Manual, Mission Planning Manual. The Contractor will consolidate all changes required by the government in the production of final copies. The Contractor will import final text drafts, graphics, and tables into FrameMaker, and convert the documents into individual (.pdf) files. In addition, the Contractor will ensure the acronym and glossary lists are current, and that all CD/DVD-ROM multi-media functions (e.g., hotlinks, videos, and animations) are operational . The Contractor will produce 10 final copies of the BEM, AEM, and MPM on CD/DVD-ROM; produce one color two-sided hard (paper) copy of the BEM, AEM, and MPM for mailing per SAF/IAPD direction; and deliver the products to the 561 JTS by DON+60 business days.
1.6 AFTTP Manual Production.
1.6.1 Contractor Qualifications. In accordance with Paragraph 1.2 of this PWS.
1.6.2 Specific Tasks: The Government’s intent is to have the Contractor provide non-personal services to produce interactive multi-media AFTTP 3-1 and AFTTP 3-3 volumes, upon request, for out-of-cycle taskings, over a 5-year period. The Contractor may be required to provide preproduction services to include: pre-conference, conference, and post-conference administrative support. Required Contractor delivery date for the Initial Draft manuals to the 561 JTS is 30 calendar days after receipt of official tasking or acceptance of government-provided source files. Upon request, the Contractor will then provide on-site editing and graphics support during the conference, and produce an updated Intermediate Draft of the manuals for review NLT 10 calendar days from conference completion. Once the Intermediate Draft manuals are reviewed by MAJCOM SMEs and the Model Manager, the manuals will be returned to the Contractor for Final Draft production including video digitizing and animation creation. The Final Draft will be provided to the 561 JTS NLT 10 calendar days from receipt of final inputs. Late delivery dates must be coordinated and approved by the 561 JTS. The payment schedule will be based upon delivery of the intermediate draft manuals; however, the Contractor will be required to incorporate subsequent changes for the final product as directed by the Model Manager.
1.6.3 The Contractor will take 561 JTS-provided inputs and/or source files in electronic format, incorporate those inputs into Adobe FrameMaker files, and structure the final document in accordance with AFTTP 3-1.General Planning and the 561 JTS publication guide. 561 JTS will provide the Contractor with any modifications and/or guidance that deviates from guidance outlined in the aforementioned documents. The Contractor will provide comprehensive editing (text, grammar, punctuation, abbreviations, etc.) of the entire document prior to final delivery to the 561 JTS.
1.6.4 The Contractor will import/create and place graphics to illustrate various aerial employment considerations, as well as produce hot links to those graphics where appropriate within the document. The Contractor will also produce the required tables and figures, place them in the document, and create links, as appropriate.
1.6.5 Upon MAJCOM approval to release the AFTTP 3-1 and AFTTP 3-3 manuals to the field, the Contractor will provide the 561 JTS, within 3 workdays, 12 total CD/DVD-ROMs consisting of the following: 4 final production disks, and 2 original source disks for each AFTTP volume. The 8 final production CD/DVD-ROMs will contain the respective AFTTP volume in book (.pdf) format with bookmarks, inter-chapter hot links, intra-chapter hot links, external links, glossary, table of contents, list of tables and figures, reports, videos, animations, and classification source listings/multi-source listings. The 4 CD/DVD-ROMs of original source materials will contain: figures in Adobe Illustrator (see Attachment 1 for graphics source file definition), text in FrameMaker, and classification source listings/multi-source listings. The Contractor will deliver to the 561 JTS all source files for all manuals they produce.
1.6.6 The Contractor will develop and implement a Quality Assurance Surveillance Plan (QASP) to ensure quality and timely performance of PWS taskings. The final QASP will be submitted to the Contracting Officer for acceptance within 30 days after contract award.
1.6.7 Unless otherwise noted, production timelines for this contract will be measured from the DON, which begins when the Contractor is notified by the Contracting Officer that a line item delineated in the contract is to be executed. If a production deadline falls on a weekend or official government holiday, the deadline will be moved to the next government workday. AFTTP manuals will be grouped into two categories, Start-Up Volumes and Follow-On Volumes.
1.7 AFTTP Start-Up Volumes.
1.7.1 Definition. Start-up volumes are defined as the first time an AFTTP is written for a given weapon system. A contractor’s task will fall under Start-Up category when:
· No previous version of the AFTTP exists.
1.7.2 Start-Up Volumes, Preparation: The 561 JTS will provide the Model Manager with an AFTTP document template in Microsoft Word (or similar) format, as well as electronic copies of any additional material the Model Manager deems useful, provided it is available. The Model Manager – with the assistance of his/her delegates – will populate the template with content. This, along with graphics and video production requests, will be submitted to the Contractor for production into the Initial Draft.
1.7.3 Start-Up Volumes, Production: Initial Draft. The Contractor will produce the manual by creating/editing all text, figures, tables, and videos. The Contractor will then produce an Initial Draft in Adobe FrameMaker,, convert to a portable document file (.pdf) and deliver a draft CD/DVD-ROM to the 561 JTS for review by DON + 30 calendar days.
1.7.4 Start-Up Volumes, Production: Conference Support. The Contractor will provide on-site conference support – 1 SME, 1 technical writer, and 1 graphic artist – for the review conference. If the SME is also proficient in technical writer and/or graphic artist responsibilities, he/she may simultaneously support the conference in multiple capacities.
1.7.4.1 The Contractor will, in an iterative process, receive changes from the Model Manager and incorporate those changes into the master document. The updated document will then be returned to the Model Manager and his/her delegates for additional review. This cycle will continue throughout the conference, with cycle times determined by the Model Manager.
1.7.5 Start-Up Volumes, Production: Intermediate Draft. The Contractor will produce the manual by editing all text, figures, tables, and videos, incorporating all Model Manager-approved inputs resulting from the review conference, or virtual review if no conference is held. The Contractor will also review all figures and tables and remark/redraw if needed. The Contractor will then produce an Intermediate Draft in Adobe FrameMaker, convert to a (.pdf) and deliver a draft CD/DVD-ROM to the 561 JTS for review NLT 10 calendar days from conference/virtual review completion.
1.7.6 Start-Up Volumes, Production: Final Draft. The government reviews the Intermediate Draft and provides the Contractor with any necessary changes/inputs. The Contractor will produce the manual by editing all text, figures, tables, and videos, incorporating all Model Manager-approved inputs resulting from the government review. The Contractor will also review all figures and tables and remark/redraw if needed. The Contractor will then produce a Final Draft in Adobe FrameMaker, convert to a (.pdf), and deliver a draft CD/DVD-ROM to the 561 JTS for approval by DON + 14 calendar days.
1.7.7 Start-Up Volumes, Production: Final Copies. Upon notification of MAJCOM approval, the 561 JTS will direct the Contractor to produce Final Copies of the volume. If approval was contingent upon any modifications, the Contractor will make the necessary edits before finalizing the document. The Contractor will deliver the document to the 561 JTS in accordance with Paragraph 1.6.5 of this PWS.
1.8 AFTTP Follow-On Volumes.
1.8.1 Definition of Follow-On Volumes. Follow-on volumes are defined as the second or subsequent revision of a specific AFTTP volume.
1.8.2 Follow-On Volumes, Preparation. The 561 JTS will provide the Model Manager with an editable (.pdf) of the current version of the AFTTP being reviewed and provide the Contractor with all source files from the current version. The Model Manager – with the assistance of his/her delegates – will typically provide inputs via electronic edits of the (.pdf), e.g., electronic post-it notes. This, along with graphics and video production/modification requests, will be submitted to the Contractor for production into the Initial Draft.
1.8.3 Follow-On Volumes, Production: Initial Draft. The Contractor will produce the manual by creating/editing all text, figures, tables, and videos. The Contractor will then produce an Initial Draft in Adobe FrameMaker, convert to a (.pdf), and deliver a draft CD/DVD-ROM to the 561 JTS for review by DON + 30 calendar days.
1.8.4 Follow-On Volumes, Production: Conference Support. The Contractor will provide on-site conference support – 1 SME, 1 technical writer and 1 graphic artist – for the review conference. If the SME is also proficient in technical writer and/or graphic artist responsibilities, he/she may simultaneously support the conference in multiple capacities.
1.8.5 Follow-On Volumes, Production: Intermediate Draft. The Contractor will produce the manual by editing all text, figures, tables, and videos, incorporating all Model Manager-approved inputs resulting from the review conference, or virtual review if no conference is held. The Contractor will also review all figures and tables and remark/redraw if needed. The Contractor will then produce an Intermediate Draft in Adobe FrameMaker, convert to a (.pdf), and deliver a draft CD/DVD-ROM to the 561 JTS for review NLT 10 calendar days from conference/virtual review completion.
1.8.6 Follow-On Volumes, Production: Final Draft. The government reviews the Intermediate Draft and provides the Contractor with any necessary changes/inputs. The Contractor will produce the manual by editing all text, figures, tables, and videos, incorporating all Model Manager-approved inputs resulting from the government review. The Contractor will also review all figures and tables and remark/redraw if needed. The Contractor will then produce a Final Draft in Adobe FrameMaker, convert to a (.pdf) and deliver a draft CD/DVD-ROM to the 561 JTS for approval by DON + 14 calendar days.
1.8.7 Follow-On Volumes, Production: Final Copies. Upon notification of MAJCOM approval, the 561 JTS will direct the Contractor to produce Final Copies of the volume. If approval was contingent upon any modifications, the Contractor will make the necessary edits before finalizing the document. The Contractor will deliver the document to the 561 JTS in accordance with Paragraph 1.6.5 of this PWS.
1.9 Contractor Travel (If Required). The Contractor may send a maximum of three individuals to various locations to support AFTTP development and is authorized two additional trips to support FMS. These trips could include attending the review conference, if held at a location other than Nellis AFB. The Contractor must receive trip authorization from the 561 JTS prior to departure, and produce a trip report within 5 workdays of completed travel. The report will be submitted to the 561 JTS for review. Travel and/or per diem will be based on the rates identified in the Joint Travel Regulation (JTR) and FAR Part 31.205-46.
1.10 Service Outcome Description. The Contractor is expected to perform AFTTP development services as tasked and IAW the service summary and government and local directives, while maintaining safe operations and customer-focused service.
SECTION 2
SERVICE SUMMARY
2.0 SERVICE SUMMARY
2.1 Service Summary reflects both FMS and AFTTP support and production delivery
2.1.2 The Contractor will implement and participate in a Quality Assurance Surveillance Plan (QASP) The purpose of the QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the Contractor is meeting the performance standards identified in the PWS.
2.1.2.1 The Contractor’s internal quality control system will set forth the staffing and procedures for self inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The Contractor will utilize its internal quality control system to assess and report their performance to the designated Government representative.
2.1.3 The following Government representatives shall have responsibility for the implementation and oversight of this QASP:
2.1.3.1 Contracting Officer (CO): The CO ensures performance of necessary actions for effective contracting, ensures compliance with the terms of the contract, and safeguards the interests of the United States in the contractual relationship. It is the CO that assures that nonconformances are identified, and establishes the significance of a nonconformance when considering the acceptability of supplies or services which do not meet contract requirements. The CO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
2.1.3.2 Contracting Officer Representative (COR): The COR is responsible for technical administration of the contract and Contractor performance. The COR may be responsible for requesting pertinent contractual documents. CORs designated to perform QAS are responsible for: 1. Performing quality assurance surveillance. 2. Identifying and documenting nonconformances. 3. Providing information to the CO and COR in the contract administration office.
2.1.3.2.1 The Government representative or will monitor performance and review performance reports furnished by the Contractor to determine how the Contractor is performing against communicated performance objectives. The Government will make decisions based on performance measurement metric data and notify the Contractor of those decisions. The Contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2.2 Errors Defined. An error in the draft and final document is defined as, but not limited to, the following: SAF/IA disclosure errors, spelling errors, grammatical errors, omission of content found in the source files, incorrect classification part-markings, broken hotlinks, and noncompliance with AFTTP 3-1/3-3 publication formatting standards and guidance found in AFTTP 3-1. General Planning, Atch 4. If more than five errors are found in the DRAFT document, (COR) review will cease and the document will be returned to the Contractor for rework. If one error is found in the FINAL document, COR review will cease; the fact that an error was found will be documented; and the document will be returned to the Contractor for rework. The Contractor will not be held accountable for errors found in the manual(s) after COR acceptance of the final product.
FMS PERFORMANCE
OBJECTIVE
PWS
PARAGRAPH
PERFORMANCE
THRESHOLD
| Start-Up Volumes, Preparation |
| 1.4.2 |
| 5 errors Per/Task |
| Produce, Start-Up Volumes: Basic Employment Manual (Draft) |
| 1.4.3 |
| 5 errors Per/Task |
| Produce, Start-Up Volumes: Advanced Employment Manual (Draft) |
| 1.4.4 |
| 5 errors Per/Task |
| Produce, Start-Up Volumes: Mission Planning Manual (Draft) |
| 1.4.5 |
| 5 errors Per/Task |
| Produce, Start-Up Volumes: FMS Summary Document (Draft) |
| 1.4.6 |
| 5 errors Per/Task |
| Produce, Final Copies of Start-Up Volumes: Basic, Advanced, and Mission Planning Manuals and FMS Summary Document |
| 1.4.7 |
| 0 errors Per/Task |
| Follow-On Volumes, Preparation |
| 1.5.2 |
| 5 errors Per/Task |
| Produce, Follow-On Volumes: Basic Employment Manual (Draft) |
| 1.5.3 |
| 5 errors Per/Task |
| Produce, Follow-On Volumes: Advanced Employment Manual (Draft) |
| 1.5.4 |
| 5 errors Per/Task |
| Produce, Follow-On Volumes: Mission Planning Manual (Draft) |
| 1.5.5 |
| 5 errors Per/Task |
| Produce, Final Copies of Follow-On Volumes: Basic, Advanced, and Mission Planning Manuals |
| 1.5.7 |
| 0 errors Per/Task |
AFTTP PERFORMANCE
OBJECTIVE
PWS
PARAGRAPH
PERFORMANCE
THRESHOLD
| Start-Up Volumes, Production: Initial Draft |
| 1.7.3 |
| 5 errors Per/Task |
| Start-Up Volumes, Production: Conference Support |
| 1.7.4 |
| - On-time attendance |
- Responsive support
| Start-Up Volumes, Production: Intermediate Draft |
| 1.7.5 |
| 5 errors Per/Task |
| Start-Up Volumes, Production: Final Draft |
| 1.7.6 |
| 0 errors Per/Task |
| Start-Up Volumes, Production: Final Copies |
| 1.7.7 |
| 0 errors Per/Task |
| Follow-On Volumes, Production: Initial Draft |
| 1.8.3 |
| 5 errors Per/Task |
| Follow-On Volumes, Production: Conference Support |
| 1.8.4 |
| 5 errors Per/Task |
| Follow-On Volumes: Intermediate Draft |
| 1.8.5 |
| 5 errors Per/Task |
| Follow-On Volumes: Final Draft |
| 1.8.6 |
| 0 errors Per/Task |
| Follow-On Volumes: Final Copies |
| 1.8.7 |
| 0 errors Per/Task |
SECTION 3
GOVERNMENT-FURNISHED PROPERTY AND SERVICES
3.1 General Information. The Government will provide, without cost, the property, facilities, and/or services listed below to support FMS manual(s) production from the start of the contract. During the period between contract award and assumption, the contractor will provide property, facilities, training and/or services at their own expense. At contract start, the government will provide the contractor with equipment, software and furnishings used during the previous contract effort. After contract assumption, the government shall provide all other computer equipment, software, and administrative supplies (paper, pens, etc.) necessary to perform services related to the contract. This includes, but is not limited to, computer stations, printers, scanners, shredders, unclassified fax, CD/DVD-ROM writer/printer, color copier, and current ACC-accepted versions of software necessary to maintain compatibility with the 561 JTS.
3.2 Government-Furnished Property/Facilities/Equipment. The government will furnish or make available property, facilities (approximately 1600 square feet of workspace), furniture, a Secure Terminal Equipment (STE) telephone, and NIPRNET/SIPRNET connectivity to the contractor to support this contract. Modifications to minimum requirements may be available based upon workload, as determined by the 561 JTS Program Manager (PM). Government facilities have been inspected for compliance with the Occupational Safety and Health Act (OSHA). No hazards have been identified for which work-around has been established. Compliance with the OSHA and other applicable laws and regulations for the protection of employees is exclusively the obligation of the contractor. Further, the government will assume no liability or responsibility for the contractor’s compliance or noncompliance with such requirement, with the exception of the aforementioned requirement to make corrections according to approved plans of abatement subject to base-wide priorities. No alterations to the facilities will be made without specific written permission from the contracting officer. In the case of alterations necessary for compliance with OSHA, such permission will not be unreasonably withheld. The contractor will return the facilities to the government in the same condition as received, fair wear and tear and approved modifications excepted. These facilities will only be used to perform US Government-related work in accordance with this PWS.
3.2.1 Property Inventory. An inventory of Government-Furnished Property (GFP) (furniture, STE telephone, computers and associated infrastructure) must be done no later than 5 calendar days after the start of the contract, 30 calendar days prior to the start of any option periods, and not later than 30 calendar days before completion of the contract period (including any option periods). The contractor and a government representative (identified by the contracting officer) will conduct a joint inventory of all GFP and the contractor will sign a receipt for all property provided by the government. The inventory list is maintained at the 561 JTS. Items of property missing or not in working order will be recorded and the contracting officer notified in writing. The contractor and the COR will jointly determine the working order and condition of all property and document their findings on the inventory. In the event of disagreement between the contractor and the COR on the working order and condition of property, the disagreement will be treated as a dispute under the disputes clause.
3.2.2 Property Accountability. By completion or extension of the contract, a joint inventory of equipment will be conducted by the contractor and a Government representative. The contractor will be liable for loss or damage to GFP beyond fair wear and tear in accordance with the clause of the contract, "Government-Furnished Property." Compensation will be effected either by reduced amount owed to the contractor or by direct payment by the contractor, the method to be determined by the Contracting Officer. All equipment in need of repairs/maintenance will be repaired/maintained by the contractor within 30 days of discovery (warranty items will be repaired/maintained by the warranty vendor), but before the joint inventory is made. All repairs/maintenance not performed by the contractor will be made at the Government's option and at the contractor’s expense. In the case of damaged property, the amount of compensation due the Government by the contractor will be the actual cost of repair, provided such amount does not exceed the economical repair value. In the case of items lost or damaged beyond economical repair, the amount of the contractor’s liability will be the depreciated replacement value of the item, to be determined by the Contracting Officer. Any failure of the contractor to agree with such determination will be treated as a dispute under the disputes clause.
3.2.3 Obtaining Replacement of Government-Furnished Property. The Government is required to replace such equipment in PWS 3.2 only when due to fair wear and tear, and it is no longer usable for its intended purpose. The contractor will submit such requests through the COR.
3.3 Government-Provided Services.
3.3.1 The government will furnish electricity, water, sewage, and heating/air conditioning for the work area.
3.3.2 The government will provide on-base mail distribution and USPS and UPS service, limited to official government mail matter, as required under terms of this contract.
3.3.3 The government will provide telephone service consisting of Class A and Class C phones and a STE telephone. Phone use is limited to matters related to the performance of this contract.
3.3.4 The Government will provide maintenance and repair of real property facilities.
3.3.5 The Government will provide IT and network support (NIPR and SIPR), as well as CAC cards to the contractor.
3.3.5.1 The Government will provide AF information system accreditation and connection approval, IAW AFI 33-210.
3.3.6 The Government will provide fire prevention protection, inspection and maintenance of government-furnished fire extinguishers and systems, pest control, and grounds maintenance.
3.3.7 The Government will provide emergency medical treatment and emergency patient transportation service for contractor personnel. The contractor will reimburse the government for the cost of medical treatment and patient transportation service at the current inpatient or outpatient treatment rate as appropriate.
3.3.8 The 99 ABW Security Forces Squadron will provide general on-base DoD security.
3.3.9 SAF/IA and/or the 561 JTS will provide foreign disclosure guidance and training in accordance with Guidelines for Disclosure of USAF Tactics and Capabilities, dated 21 Aug 2009.
SECTION 4
GENERAL INFORMATION
4.1 General Security Responsibilities During Performance. The Contractor shall ensure that its employees follow the general procedures governing physical, environmental, and information security described in the various DoD and Air Force Instructions pertaining thereto, good business practices, and the specifications, directives, and manuals for conducting work to generate the products as required by this contract. Personnel will be responsible for the physical security of their area and government furnished equipment (GFE) issued to them under the provisions of the contract.
4.1.1 Non-Disclosure Agreements. Contractors who require access to classified information must receive the appropriate security briefings from the designated Air Force security office and acknowledge and sign the SF 312. The contract employees shall complete DoD Information Assurance Awareness Training and pass mandatory computer security tests, as required, prior to being granted access to the Air Force network.
4.1.2 Access to Classified Information. All Contractor personnel employed by the Contractor or responsible to the Contractor for the performance of work shall have a Final Secret clearance and acknowledge and sign the SF 312, Non disclosure Agreement (NDA) prior to being granted access to classified information.
4.1.3 The Air Force retains the right to request removal of the Contractor’s employees, regardless of clearance or adjudication status, whose actions clearly conflict with the interests of the Government. A senior employee of the Contractor must escort the employee of the Contractor, within two hours of notification, where removal is required from Air Force. The escort shall ensure that all security and exit procedures are followed and that no government property is removed from the facility. Contractors removed from this contract for security reasons or violations of Standards of Conduct shall not be eligible for reinstatement to this contract or any other Air Force contract.
4.2 Data Security. Work performed at the Air Force facility may entail accessing, processing, analyzing, or storing data on individuals and organizations that are or will be covered by the Privacy Act. All contractors are required to maintain security, processing, storage, and disposal systems and safeguards sufficient to ensure that it and the Air Force meets the requirements of all privacy laws, regulations and agreements. Contractor and its professional staff shall take steps to ensure that the intent of this section is enforced at all times through appropriate qualification standards for all contractor personnel and through adequate training and quality assurance procedures.
4.2.1 Data Disposition. Contractor must release all required deliverables and data or other works developed under this contract solely in accordance with the contract terms. All data collected and remaining in the custody of the Contractor at the close of any contract that permits identification of an individual or entity describe in the data, or an individual supplying it, must be delivered to the designated government representative or destroyed in accordance with the terms of the contract. No copies or parts of data, derivative files (encrypted and/or individually identifiable) may be kept by the Contractor.
4.3 Information Systems Security/Information Security. Where Air Force Information System (IS) access will be provided to the Contractor as part of the Government-Furnished Property and Equipment, the Contractor shall abide by the Air Force IS security policy and procedures, particularly in the area of obtaining access and systems usage. Contractor employees that fail to adhere to the Air Force information security policy and procedures can result in the denial of IS access, removal from the network and system access, and removal from the contract.
4.3.1 The Air Force security representative will document violations of local IS security policy, such as, password sharing, performing personal work, file access violations or browsing files outside the scope of the contract. (The unit security officer shall give each documented letter of noncompliance to the Contract Officer Representative.) After two letters of noncompliance, the Contractor shall remove the documented Contractor employee(s) from the contract. Egregious violations will result in immediate removal.
4.3.2 The Air Force’s host unit information systems security officer will maintain information systems and information security oversight. All systems used for this contract will be certified, accredited and secured in accordance with Air Force information systems security, instructions, directives, policies, Federal Information Processing Standards (FIPS), and guidance (OMB A-130, NIST 800-18), and AFI 33-210.
4.3.3 If required, Air Force security officials will be allowed unrestricted access to Contractor facilities to conduct security site surveys and to perform duties associated with IS security and information security oversight.
4.3.4 At the Government’s request, the Contractor must return all information provided by the Government or developed for the Government by the Contractor. Sensitive information (working papers, copies, etc.) must be disposed of by shredding with a Government-approved shredder (pulp or extremely fine shred).
4.3.4.1 The Contractor shall ensure compliance with the Federal Information Security Management Act of 2002 (FISMA), Office of Management and Budget (OMB) Circular A-130, appendix III, National Institute of Standards and Technology guidelines, and all Air Force instructions, directives and policies (AFI 33 Series).
4.4 Personnel Security.
4.4.1 The Contractor will not employ any person who is an employee of the United States government if the employment of that person would create a conflict of interest, nor will the Contractor employ any person who is an employee of the Department of Defense, either military or civilian, unless such person seeks and receives approval in accordance with DOD 5500-7. In addition, the Contractor will not employ any person who is an employee of the Department of Defense, if such employment would be contrary to the policies contained in AFI 64-106. Any and all Foreign Nationals hired by the Contractor must be cleared through the Foreign Disclosure Office IAW AFI 31-209.
4.4.2 The Contractor must possess a facility clearance at the classification level of SECRET, with a National Agency Check (current personnel clearances are desired). The Contractor will apply for personnel security clearances within 15 days after receipt of the facility clearance or upon contract award notification. The Contractor will sign an agreement stipulating the security requirements of this contract as provided for in AFI 31-601. The Contractor will comply with DOD 5220.22-M, Industrial Security Manual.
4.4.3 Prior to the start of the first operational performance period, the Contractor will ensure that sufficient personnel have appropriate security clearances to meet and maintain requirements specified. The Contractor will provide sufficient information to their local Defense Security Service office to obtain favorable National Agency Check investigations for its employees for entrance to restricted areas.
4.4.4 The Contractor is required to comply with all security regulations and directives identified herein, and other security requirements as are shown elsewhere in this contract. Contractor will comply with DD Form 254, DOD Contract Security Classification Specification, attached to this contract. Only those persons who have a "need to know" in accordance with the performance of work under this contract will be given access to classified information or material.
4.5 Contractor Appearance. The Contractor and all employees will wear distinctive logo shirts or badges clearly designating them as contract employees and not Government Service employees.
4.6 Physical Security. The Contractor will be responsible for safeguarding all Government property provided for contract use. At the close of each work period, facilities, equipment, and materials will be secured. Since the Contractor will be working within a secure facility and storing classified material within that facility, the Contractor will conform to the provisions of AFI 31-209 for safeguarding the government-furnished facility and material contained therein.
4.7 Safety Requirements. The Contractor will conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work and take such additional immediate precautions as the contracting officer may reasonably require for safety and mishap prevention purposes. Provide protection to Government property to prevent damage during the period of time the property is under the control or in possession of the Contractor.
4.8 Reserved
4.9 General Information Regarding Publications and Forms. Publications that apply to the PWS are listed below. The publications have been coded as mandatory or advisory. The Contractor is obligated to follow those publications and use those forms coded as mandatory to the extent specified in other sections of this PWS. The Contractor will be guided by those publications or use those forms coded advisory to the extent necessary to accomplish requirements in this PWS. The 561 JTS at the start of the contract will provide all publications, forms, applicable changes and updates as listed.
4.9.1 Publications.
| Number |
| Title |
| Date |
| Advisory |
| DOD 5200.1 |
| Information Security Program |
| 13 Dec 96 |
| M |
| DOD 5220.22 |
| National Industrial Security Program |
| 27 Sep 04 |
| M |
| DOD 5500.7-R |
| Standards of Conduct |
| 29 Nov 07 |
| M |
| AFI 33-210 |
| Air Force Certification And Accreditation |
(C&A) Program (AFCAP)
| 23 Dec 08 |
| M |
| AFI 31-401 |
| Information Security Program Management |
| 01 Nov 07 |
| M |
| AFI 64-106 |
| AF Industrial Labor Relations Activities |
| 25 Mar 94 |
| M |
| AFI 11-260 |
| Tactics Development Program |
| 12 Dec 03 |
| M |
| AFI 31-101 |
| Air Force Installation Security Program |
| 03 Mar 03 |
| M |
| AFI 31-601 |
| Industrial Security Program Management |
| 29 Jun 05 |
| M |
AFI 63-124
DD Form 254 Performance-Based Services Acquistion
DoD Contract Security Classification 1 Aug 05
Dec 99
M
M
| AFTTP/NTTP Editing Guide |
| 30 Nov 04 |
| M |
| 561 JTS Graphics Division Handbook |
| 10 Jul 07 |
| M |
ATTACHMENT 1—TECHNICAL DEFINITIONS
561st Joint Tactics Squadron, United States Air Force Warfare Center. Stationed at Nellis AFB, NV, the 561 JTS is responsible for the documentation, production, and distribution of USAF tactical-level doctrine.
AFTTP – Air Force Tactics, Techniques, and Procedures. The USAF’s comprehensive series of tactics manuals, published by the 561 JTS. Manuals are produced for every major weapon system in the USAF inventory, and are updated by a conference of subject matter experts, hosted by the 561 JTS. Generally, two series of manuals exist for each aircraft/mission area: a “3-1,” or predominately classified Tactical Employment manual, and a“3-3,” or predominately unclassified Combat Fundamentals manual.
ACC – Air Combat Command AFI – Air Force Instruction…
This is the start of the file's text. The full file is on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .