Brand_Name_justification_CO_Signed.pdf
PDF 4 MB Posted
- Attached to
- NetApp Warranty Federal contract opportunity
- Solicitation number
- FA4855-18-Q-0034
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
FOR OFFICIAL USE ONLY
25 May 2018 FOR OFFICIAL USE ONLY Page 1 of 7
NOTE: If a Justification was approved for the preceding acquisition, a copy of the approved Justification for the predecessor action must be included in the staff package for approval of the instant Justification. This applies to Justification staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor Justification will be used as a reference document by the approving official.
Is this a new or amended J&A Document? New Amended ( Prior to Award Only! )
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No
Funding level for this acquisition: >SAT and < $700K > $700K and < $13.5M
Contracting Activity: 27 SOCONS
Purchase Request / Local ID Number: F1L1RC8194AW01
Program / Project (and PE, if applicable): NetApp Inc.
Program Type (PEO or Other Contracting): Other Contracting
Authority: AFFARS 5313.501 - 10 U.S.C. 2302b, Implementation of Simplified Acquisition Procedures (41 U.S.C. 1901)
AFFARS 5313.501 - 10 U.S.C. 2304a, Special Emergency Procurement Authority (41 U.S.C. 1903)
Estimated Contract Cost (including options): $679,900.32 Justification Type: Class Individual
COORDINATION (AFFARS 5306.304(a) ) Sign and Save Procedure
** The text in the signature blocks below is editable, including the title.
** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.
Date
08 Aug 2018
Project Lead / Program Mgr / Requiring Activity Capt Marcus K. Anthony
27 SOG/ROC, DSN 681-6981
Signature
X
Date
14 Aug 2018
Contracting Officer Thomas, April L. MSgt, USAF
27 SOCONS/784-2442
Signature
X
Date
22 Aug 2018
Local Legal Reviewer Hirohata, Derek K. GS-13, USAF
27 SOW/JA 575-784-2211
Signature
X
APPROVAL (AFFARS 5306.304(a) )
Date
30 Aug 2018
Chief of the Contracting Office (COCO) Purcell, John A. Maj, USAF
27 SOCONS/CC 784-2321
Signature
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
25 May 2018 FOR OFFICIAL USE ONLY Page 2 of 7
(See "Specific Guidance for Completing this Template" below.)
I. Contracting Activity.
Purchase Request Number: F1L1RC8194AW01 Department of the Air Force, 27th Special Operations Contracting Squadron (27 SOCONS), Cannon AFB, NM. This document serves as a Justification for Other Than Full and Open Competition. The Contracting Officer for this requirement is MSgt Jesse Schwarztrauber.
II. Nature and/or description of the action being processed.
This action is be pursued as a brand name purchase of NetApp Warranty. For a more specific breakdown of the description of the supplies and services that are being acquired please refer to Section III Description of supplies/ services. This requirement will be awarded to distributors certified and approved by the manufacturer to provide the brand requested. This action will be awarded as a new firm-fixed-price contract.
III. Description of supplies/services required to meet agency needs.
This requirement is for the purchase of the NetApp Warranty for a period of performance of one year.
Product list breakdown:
- 28 each Non Returnable Disk Renewal
- 28 each SE Secure On-site Next Business Day Support agreement The total estimated value for this requirement is $679,900.32.
The desired delivery date is 30 Days ADC.
The period of performance will be a base year of 30 Sept 2018 - 29 Sept 2019 with a 3 month option period of 30 Sept 2019 - 31 Dec 2019.
IV. Statutory authority permitting other than full and open competition.
Procurement under the contract will be conducted on a brand name basis in accordance with the statutory authority AFFARS 5313.501 - 10 U.S.C. 2302b, Implementation of Simplified Acquisition Procedures (41 U.S.C. 1901).
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).
NetApp brand warranty and support is essential to the Government's requirements. We currently employ NetApp brand systems in the RPA Operations Center and only the NetApp brand warranty extension and technical support can be utilized to support the continued network storage of client and server systems. This service is only available through NetApp to their authorized distributors. Other vendor software solutions would require complete system redesign, resulting in mission stoppage due to the different software that needs to be applied to the already existing NetApp products. The RPA community cannot risk a single pause in their productivity/mission. Purchasing any other software warranty and support agreement would render the NetApp products unusable. A complete new purchase of similar products would cause substantial duplication of costs to the Government that cannot be recovered by competing this requirement outside the NetApp brand. A complete new system would cost approximately $2.4M. By purchasing a yearly warranty and support agreement, the Government saves an estimated $1.9M. Purchasing the NetApp brand warranties and support agreements is in the best interest of the Government and is essential to the Government's requirements.
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
This requirement will be pursued as a brand name requirement. The manufacturer, NetApp Inc, has confirmed that they authorize other companies to provide warranty and extended support agreement. Additionally, sources from Section X were contacted and confirmed that they could provide NetApp brand warranty and support agreements. A
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
25 May 2018 FOR OFFICIAL USE ONLY Page 3 of 7 combined synopsis/solicitation will be posted to the GPE to allow for maximum competition to sources that can provide the NetApp brand items required.
VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
This requirement will be competed as a brand name requirement. According to market research, three or more quotes are expected. Prices will be determined fair and reasonable in accordance with FAR 13.106-3 based on competitive quotes. The 3 month option period of (30 Sept 2019 - 30 Dec 2019) will also be evaluated at time of award.
VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.
The NetApp, Inc. DoD Account Manager confirmed that only NetApp warranties and support agreements can be used to support NetApp products. NetApp does authorize distributors to purchase NetApp warranties and support agreements from NetApp and resell them. Warranties and support agreements are sold exclusively through distributors and cannot be purchased from NetApp, Inc. directly. A review of EDA confirms that no contracts have been issued to NetApp, Inc. from the DoD. Warranties and extended support agreements are commercial items. Any commercial customer can purchase NetApp brand software and warranties. These warranties are offered commercially through NetApp approved distributors. NetApp, Inc. provided a list of common distributors of NetApp products. These distributors, found in Section X, were contacted and confirmed that they could provide the NetApp brand products required by the Government. An Internet search of the part numbers listed in Section III shows that several other companies resell the NetApp warranties and support agreements.
Additional research was performed by 27 SOCONS through EDA and Federal Business Opportunities. The research found the contracts below for NetApp Warranty.
FA4855-17-P-0070 was awarded by the 27th Special Operations Contracting Squadron for the amount of $650,462.24 for the NetApp Warranty on 28 September 2017, solicited as a brand name justification.
FA4890-18-P-0020 was awarded by Joint Base Andrews for the amount of $237,235.40 for the NetApp Storage on 13 June 2018, solicited as a brand name justification.
N00421-18-F-0946 was awarded by Naval Air Command for the amount of $229,998.72 on 10 Aug 2018, solicited as a brand name justification.
IX. Any other facts supporting the use of Other Than Full and Open Competition.
N/A
X. List of any sources that expressed, in writing, an interest in the acquisition.
NetApp, Inc.; AVNET; Clearshark, L.L.C.; and Force 3 have expressed interest in the acquisition. As stated above, NetApp, Inc. does not directly provide the items.
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.
Future acquisitions will be evaluated before any additional purchases are processed. According to NetApp, Inc., the items that will be covered under this warranty will reach the end of life-cycle in December 2019. The Government
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
25 May 2018 FOR OFFICIAL USE ONLY Page 4 of 7 would potentially need to re-procure the items at that point. Any new requirements for the NetApp or similar items will be evaluated for full and open competition, to include the evaluation of complete life-cycle costs.
XII. Certification by the Contracting Officer.
As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.
XIII. Certification by the technical/requirements personnel.
As evidenced by my (our) signature(s) above, I (we) certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete.
Remove the Guidance pages below.
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
25 May 2018 FOR OFFICIAL USE ONLY Page 5 of 7
Specific Guidance for Completing this Template
I. Contracting Activity. (FAR 6.303-2(b)(1))
Fully identify the contracting agency and organizational activity responsible for the proposed contracting action.
II. Nature and/or description of the action being processed. (FAR 6.303-2(b)(2))
State whether the action will be awarded as a new contract or by modification to an existing contract (identify contract number) and identify the type contract planned (FAR 12.207 and DFARS 212.207).
An individual Justification cannot be used to support more than one contract irrespective of the quantities or the dollar value stated therein. If a proposed contract will contain unpriced options (including NTE prices), those options must be supported by a separate Justification prior to option exercise or the Justification supporting the basic contract must be a Class Justification. For Class Justification situations (covers more than one contract) where the number of contracts in the class can be identified: (1) Provide a brief general description of actions; (2) identify the supplies and services that are being acquired; and (3) for each contract in the class identify the contractor, estimated value, type of contract and rationale for contract length, and estimated award date. Where the same information applies to more than one contract within the class, it need only be stated one time.
III. Description of the supplies/services required to meet agency needs. (FAR 6.303-2(b)(3))
Specifically describe the supplies and/or services to be acquired, the total estimated value of the acquisition - including options (provide cost estimate by year and, for class Justifications, by contract action), and the estimated delivery dates/periods of performance If commodities are being procured, provide quantities. All contract line items (CLIN) -- e.g., technical data, support equipment, support services, etc. -- should be listed. If all of the ancillary requirements associated with a particular item are not specifically described in the Justifications, those ancillary requirements cannot be included in the resulting contract and would require a second Justification. Also, state the type of appropriation (e.g., 3010, 3400) that will be used to fund each requirement listed.
If approval for more than one fiscal year requirement is needed, give the rationale for this request. Generally, the scope of these actions is limited to current requirements only, so that actions may be taken to facilitate competition for out-year requirements.
In some cases, there are no feasible actions that could develop future competition, and it is reasonable to seek approval for more than one fiscal year's requirements.
For ID/IQ or requirements contracts, use the maximum dollar value of the total estimated orders as the estimated Justification dollar value.
IV. Statutory authority permitting other than full and open competition. (FAR 6.303-2(b)(4))
AFFARS 5313.501 - 10 U.S.C. 2302b, Implementation of Simplified Acquisition Procedures (41 U.S.C. 1901)
AFFARS 5313.501 - 10 U.S.C. 2304a, Special Emergency Procurement Authority (41 U.S.C. 1903)
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority). (FAR 6.303-2(b)(5))
Provide, in narrative form, a detailed explanation supporting and clearly relating to the conditions described by the FAR for using the particular authority cited. This section is normally the most detailed part of the justification as the essence of the justification is presented here. For acquisitions that include both supplies and services, separately justify the use of the authority for the services and supplies.
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
25 May 2018 FOR OFFICIAL USE ONLY Page 6 of 7
Contracting without providing for full and open competition shall not be justified on the basis of lack of advance planning by the requiring activity or concerns related to the amount of funds available (e.g., funds will expire) (10 U.S.C. 2304(f)(4)).
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
(FAR 6.303-2(b)(6))
Describe all efforts taken (or to be to be taken) to ensure that offers are solicited from as many potential sources as practicable under the circumstances. Although Market Research is covered in Section VIII, the information in Section VI should correlate with the Market Research described in Section VI. The following issues should be addressed in this paragraph:
Sources Sought Synopsis (used as part of market research). If a sources sought synopsis was issued, state the date the synopsis was issued and a brief description of its content. If any responses were received, describe in detail the results of the screening process and the rationale for determining the unacceptability of any synopsis respondents. Reference FAR 13.105, Synopsis and Posting Requirements.
Other Actions. In this paragraph, discuss any other actions taken or planned to facilitate competition for this acquisition. The discussion should include actions tried or considered even if the actions were unsuccessful. If the efforts were unsuccessful, so state and describe why.
Qualifying Country Sources. If qualifying country sources have expressed interest, but are to be excluded, provide supporting rationale.
VII. Determination by the Contracting Officer that the anticipated cost to the government will be fair and reasonable. (FAR 6.303-2(b)(7))
Include a statement by the contracting officer that the anticipated cost will be considered fair and reasonable and provide the basis for this determination. The steps that will be taken to ensure the final contract price will be fair and reasonable are also described here. Describe the extent of cost or price analysis anticipated including the requirements for certified cost or pricing data, technical evaluations, and audits.
VIII. Description of the market research conducted and the results, or explain why market research was not conducted. (FAR 6.303-2(b)(8))
Generally, some form of market research should be conducted. Discuss any market research conducted pursuant to FAR Part 10 and describe results of that research. Market research is any effort undertaken to determine if sources capable of satisfying the agency's requirements exist and to determine if commercial items or non-developmental items are either available or can be modified so that they will satisfy the agency's needs. Market research should be focused not only on identifying alternate sources, but also on alternate equipment or substitutes that might fulfill the Government needs with only minor modification.
Regardless of the approach used, the results should provide a high level of confidence that no other qualified sources exist.
When other exceptions from the requirement to obtain full and open competition are relied upon, the market research might be limited to an examination of the acquisition history and experience with the marketplace under previous acquisitions for the same or similar items.
If no market research was conducted, so state and provide the rationale.
IX. Any other facts supporting the use of Other Than Full and Open Competition. (FAR 6.303-2(b)(9)(i))
Provide any other facts supporting the use of other than full and open competition, including an explanation of why technical data packages, specifications, engineering descriptions, statements of work, statements of objectives, or purchase descriptions suitable for full and open competition have not been developed, are not being developed, are not being used, or are not available.
X. List of sources, if any, that expressed interest in the acquisition. (FAR 6.303-2(b)(10))
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
25 May 2018 FOR OFFICIAL USE ONLY Page 7 of 7
If a sources sought synopsis was done and all interested sources are included in Section VI, it is acceptable to state, “See Section VI above.”
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required. (FAR 6.303-2(b)(11))
Describe any actions taken or to be taken to foster competition for future acquisitions of the supplies or services being acquired.
Describe potential actions that could be taken to remove the barriers to competition that have been identified in the justification and include a milestone schedule, where available, for accomplishing these actions. For example, if a follow-on competitive acquisition is planned, so state and provide the planned award date, or state that the Government will attempt to acquire rights in technical data and computer software sufficient to compete follow-on acquisitions as a priced option in the contract action that is the subject of this Justification, or (if applicable) state how the Government intends to challenge nonconforming markings on technical data and computer software delivered to it under previous contracts so those markings can be removed in order that the technical data and computer software may be used in support of a follow-on competitive acquisition, or describe plans to qualify additional sources.
Address efforts to ensure competition for future spare parts and maintenance in support of systems or equipment covered by the justification, even when these acquisitions will be accomplished by other organizations. Include a discussion on available breakout data.
If no actions are planned, so state and provide reasons. If approval is sought for more than one year, explain why a sole source effort is required for the planned time duration.
For a non-competitive follow-on acquisition to a previous award for the same supply or service supported by a Justification citing the same authority, include a discussion of the actions planned to overcome barriers to competition established in the previous justification, the status of those actions, and the results of those actions. The approval authority shall determine whether the planned actions were completed. If the planned actions were not completed, the justification for the follow-on acquisition shall be approved by the approval authority one-level above the approval authority for the previous justification (see FAR 13.501(a)(2)). If the previous justification was approved by the Senior Procurement Executive (SPE), the approval remains at the SPE level.
[DFARS 213.501(a) and DFARS PGI 206.304(a)(S-70)(ii)]
XII. Certification by the Contracting Officer. (FAR 6.303-2(b)(12))
As evidenced by his/her signature, the contracting officer has determined this document to be both accurate and complete to the best of his/her knowledge and belief.
XIII. Certification by the technical/requirements personnel. (FAR 6.303-2(c))
As evidenced by their signatures, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete.
Do You Need to "REDACT" Text?
This template is interactive and has special features. In its current state, it cannot be redacted. In order to redact any portion of this template, you must first convert it to a normal PDF file. Click here for instructions.
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items 25 May 2018 Page of International Agreement Competitive Restrictions (IACR) March 2018 Page of NOTE: If a Justification was approved for the preceding acquisition, a copy of the approved Justification for the predecessor action must be included in the staff package for approval of the instant Justification. This applies to Justification staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor Justification will be used as a reference document by the approving official.
Is this a new or amended J&A Document?
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?
Funding level for this acquisition:
Authority:
Justification Type:
COORDINATION (AFFARS 5306.304(a)) ** The text in the signature blocks below is editable, including the title.
** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.
APPROVAL (AFFARS 5306.304(a)) NOTE: A signature block will appear here based on the funding level selected above.
(See "Specific Guidance for Completing this Template" below.)
I. Contracting Activity.
II. Nature and/or description of the action being processed.
III. Description of supplies/services required to meet agency needs.
IV. Statutory authority permitting other than full and open competition.
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.
IX. Any other facts supporting the use of Other Than Full and Open Competition.
X. List of any sources that expressed, in writing, an interest in the acquisition.
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.
XII. Certification by the Contracting Officer.
XIII. Certification by the technical/requirements personnel.
Specific Guidance for Completing this Template
I. Contracting Activity. (FAR 6.303-2(b)(1))
Fully identify the contracting agency and organizational activity responsible for the proposed contracting action.
II. Nature and/or description of the action being processed. (FAR 6.303-2(b)(2))
State whether the action will be awarded as a new contract or by modification to an existing contract (identify contract number) and identify the type contract planned (FAR 12.207 and DFARS 212.207).
An individual Justification cannot be used to support more than one contract irrespective of the quantities or the dollar value stated therein. If a proposed contract will contain unpriced options (including NTE prices), those options must be supported by a separate Justification prior to option exercise or the Justification supporting the basic contract must be a Class Justification. For Class Justification situations (covers more than one contract) where the number of contracts in the class can be identified: (1) Provide a brief general description of actions; (2) identify the supplies and services that are being acquired; and (3) for each contract in the class identify the contractor, estimated value, type of contract and rationale for contract length, and estimated award date. Where the same information applies to more than one contract within the class, it need only be stated one time.
III. Description of the supplies/services required to meet agency needs. (FAR 6.303-2(b)(3))
Specifically describe the supplies and/or services to be acquired, the total estimated value of the acquisition - including options (provide cost estimate by year and, for class Justifications, by contract action), and the estimated delivery dates/periods of performance If commodities are being procured, provide quantities. All contract line items (CLIN) -- e.g., technical data, support equipment, support services, etc. -- should be listed. If all of the ancillary requirements associated with a particular item are not specifically described in the Justifications, those ancillary requirements cannot be included in the resulting contract and would require a second Justification. Also, state the type of appropriation (e.g., 3010, 3400) that will be used to fund each requirement listed.
If approval for more than one fiscal year requirement is needed, give the rationale for this request. Generally, the scope of these actions is limited to current requirements only, so that actions may be taken to facilitate competition for out-year requirements.
In some cases, there are no feasible actions that could develop future competition, and it is reasonable to seek approval for more than one fiscal year's requirements.
For ID/IQ or requirements contracts, use the maximum dollar value of the total estimated orders as the estimated Justification dollar value.
IV. Statutory authority permitting other than full and open competition. (FAR 6.303-2(b)(4)) V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority). (FAR 6.303-2(b)(5))
Provide, in narrative form, a detailed explanation supporting and clearly relating to the conditions described by the FAR for using the particular authority cited. This section is normally the most detailed part of the justification as the essence of the justification is presented here. For acquisitions that include both supplies and services, separately justify the use of the authority for the services and supplies.
Contracting without providing for full and open competition shall not be justified on the basis of lack of advance planning by the requiring activity or concerns related to the amount of funds available (e.g., funds will expire) (10 U.S.C. 2304(f)(4)).
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
(FAR 6.303-2(b)(6))
Describe all efforts taken (or to be to be taken) to ensure that offers are solicited from as many potential sources as practicable under the circumstances. Although Market Research is covered in Section VIII, the information in Section VI should correlate with the Market Research described in Section VI. The following issues should be addressed in this paragraph:
Sources Sought Synopsis (used as part of market research). If a sources sought synopsis was issued, state the date the synopsis was issued and a brief description of its content. If any responses were received, describe in detail the results of the screening process and the rationale for determining the unacceptability of any synopsis respondents. Reference FAR 13.105, Synopsis and Posting Requirements.
Other Actions. In this paragraph, discuss any other actions taken or planned to facilitate competition for this acquisition. The discussion should include actions tried or considered even if the actions were unsuccessful. If the efforts were unsuccessful, so state and describe why.
Qualifying Country Sources. If qualifying country sources have expressed interest, but are to be excluded, provide supporting rationale.
VII. Determination by the Contracting Officer that the anticipated cost to the government will be fair and reasonable. (FAR 6.303-2(b)(7))
Include a statement by the contracting officer that the anticipated cost will be considered fair and reasonable and provide the basis for this determination. The steps that will be taken to ensure the final contract price will be fair and reasonable are also described here. Describe the extent of cost or price analysis anticipated including the requirements for certified cost or pricing data, technical evaluations, and audits.
VIII. Description of the market research conducted and the results, or explain why market research was not conducted. (FAR 6.303-2(b)(8))
Generally, some form of market research should be conducted. Discuss any market research conducted pursuant to FAR Part 10 and describe results of that research. Market research is any effort undertaken to determine if sources capable of satisfying the agency's requirements exist and to determine if commercial items or non-developmental items are either available or can be modified so that they will satisfy the agency's needs. Market research should be focused not only on identifying alternate sources, but also on alternate equipment or substitutes that might fulfill the Government needs with only minor modification. Regardless of the approach used, the results should provide a high level of confidence that no other qualified sources exist.
When other exceptions from the requirement to obtain full and open competition are relied upon, the market research might be limited to an examination of the acquisition history and experience with the marketplace under previous acquisitions for the same or similar items.
If no market research was conducted, so state and provide the rationale.
IX. Any other facts supporting the use of Other Than Full and Open Competition. (FAR 6.303-2(b)(9)(i))
Provide any other facts supporting the use of other than full and open competition, including an explanation of why technical data packages, specifications, engineering descriptions, statements of work, statements of objectives, or purchase descriptions suitable for full and open competition have not been developed, are not being developed, are not being used, or are not available.
X. List of sources, if any, that expressed interest in the acquisition. (FAR 6.303-2(b)(10))
If a sources sought synopsis was done and all interested sources are included in Section VI, it is acceptable to state, “See Section VI above.”
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required. (FAR 6.303-2(b)(11))
Describe any actions taken or to be taken to foster competition for future acquisitions of the supplies or services being acquired. Describe potential actions that could be taken to remove the barriers to competition that have been identified in the justification and include a milestone schedule, where available, for accomplishing these actions. For example, if a follow-on competitive acquisition is planned, so state and provide the planned award date, or state that the Government will attempt to acquire rights in technical data and computer software sufficient to compete follow-on acquisitions as a priced option in the contract action that is the subject of this Justification, or (if applicable) state how the Government intends to challenge nonconforming markings on technical data and computer software delivered to it under previous contracts so those markings can be removed in order that the technical data and computer software may be used in support of a follow-on competitive acquisition, or describe plans to qualify additional sources.
Address efforts to ensure competition for future spare parts and maintenance in support of systems or equipment covered by the justification, even when these acquisitions will be accomplished by other organizations. Include a discussion on available breakout data.
If no actions are planned, so state and provide reasons. If approval is sought for more than one year, explain why a sole source effort is required for the planned time duration.
For a non-competitive follow-on acquisition to a previous award for the same supply or service supported by a Justification citing the same authority, include a discussion of the actions planned to overcome barriers to competition established in the previous justification, the status of those actions, and the results of those actions. The approval authority shall determine whether the planned actions were completed. If the planned actions were not completed, the justification for the follow-on acquisition shall be approved by the approval authority one-level above the approval authority for the previous justification (see FAR 13.501(a)(2)). If the previous justification was approved by the Senior Procurement Executive (SPE), the approval remains at the SPE level.
[DFARS 213.501(a) and DFARS PGI 206.304(a)(S-70)(ii)] XII. Certification by the Contracting Officer. (FAR 6.303-2(b)(12))
As evidenced by his/her signature, the contracting officer has determined this document to be both accurate and complete to the best of his/her knowledge and belief.
XIII. Certification by the technical/requirements personnel. (FAR 6.303-2(c))
As evidenced by their signatures, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete.
Do You Need to "REDACT" Text?
This template is interactive and has special features. In its current state, it cannot be redacted. In order to redact any portion of this template, you must first convert it to a normal PDF file. Click here for instructions.
9.0.0.2.20120627.2.874785
| security_markings: FOR OFFICIAL USE ONLY |
| CurrentPage: |
| PageCount: |
| new: |
| amended-with-original: |
| Yes: |
| No: |
| range_under-700K: |
| range_700K-13.5M: |
| Contracting-Activity: 27 SOCONS |
| PR-ID-Number: F1L1RC8194AW01 |
| Program-Project: NetApp Inc. |
| Program-Type: Other Contracting |
| class: |
| individual: |
| Estimated_Cost: 679,900.32 |
| Sign_and_Save_1: |
| Date: 08 Aug 2018 |
| Date: 14 Aug 2018 |
| Date: 22 Aug 2018 |
| Date: 30 Aug 2018 |
| Name: |
| Signature: |
| Hide-PM-Coord: |
| Hide-CO-Coord: |
| Hide-CSO-Coord: |
| Hide-Legal-Coord: |
| Hide-COCO-Coord: |
| Hide-CA-Coord: |
| Hide-Blank-1-Coord: |
| Hide-Blank-2-Coord: |
| Section-I-Text: |
| Section-II-Text: |
| Section-III-Text: |
| Section-IV-Text: |
| Section-V-Text: |
| Section-VI-Text: |
| Section-VII-Text: |
| Section-VIII-Text: |
| Section-IX-Text: |
| Section-X-Text: |
| Section-XI-Text: |
| Section-XII-Text: |
| Section-XIII-Text: |
| Remove-Guidance-Pages: 0 |
File details come from the government source that posted it.