SOW.pdf

PDF 12 KB Posted

Attached to
Mobile Tactical Operations Center Federal contract opportunity
Solicitation number
FA4830-15-Q-Z023
Issued by
Department of the Air Force Air Combat Command

About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Mobile Tactical Operations Center, newest first.
File Type Posted
Specification_Redacted.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mobile Tactical Operations Center (trailer)

DESCRIPTION

General: A Mobile Tactical Operations Center which is made from a 45-50’ trailer that is specifically designed as a workspace for flying operations. The unit must be able to be travel over the road without any additional driving requirements and be pulled by a Ford F-350 (6.2L) with a gooseneck.

The unit must be self-sufficient providing power, heating and air conditioning, and storage of the required flight equipment for 16 aircrew. The unit will have at least three expandable slides, providing the most workspace as possible. It must have at least 4 mission planning work stations, providing power and network capabilities, and a location for a printer. It must have a location for a stand-alone computer for administrative work and an additional printer. It needs to have location for a small safe. It must have a white board and projector for mission briefings.

SUBMITTALS

A. Product Data: Include data substantiating that the finished product will meet the requirements of the contract documents.

B. Shop Drawings: Engineering drawings of the final product, include all HVAC, electrical and structural elements. Include notations and descriptions of all items.

C. Warranty: Submit a draft copy of proposed warranty for review by end user.

D. Include CAGE code in quote

FINISHES

Colors: Trailer will be white.

INSTALLATION:

1. MTOC will be delivered to 41 RQS.

2. Delivered unit will be ready for operation at time of arrival.

File details come from the government source that posted it. Updated .