About this file
Justification and Approval for Sole Source
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA481419TF104_Request_for_Quote_with_Attachments.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Justification and Approval (J&A) for Other Than Full and Open Competition
FOR OFFICIAL USE ONLY
March 2018 FOR OFFICIAL USE ONLY Page 1 of 3
NOTE: If a Justification and Approval was approved for the preceding acquisition, a copy of the approved J&A for the predecessor action must be included in the staff package for approval of the instant J&A. This applies to all J&A staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor J&A will be used as a reference document by the approving official.
Is this a new or amended J&A Document? New Amended ( Prior to Award Only! )
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No
Funding level for this acquisition: < $700K > $700K and < $13.5M > $13.5M and < $93M > $93M
Contracting Activity: 6 CONS/PKB
Purchase Request / Local ID Number: F2VVHC9080AW01
Program / Project (and PE, if applicable): Building 567 (Central Utility Plant) Generator Control System Upgrade
Program Type (PEO or Other Contracting): Other Contracting
Authority: 6.302-1 – 10 USC 2304(c)(1), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements
Estimated Contract Cost (including options): $690,000.00 J&A Type: Class Individual
COORDINATION (AFFARS 5306.304(a) )
Date Project Lead / Program Mgr / Requiring Activity Adam J. Schroeder
HQ USCENTCOM/CCHC-F (813) 529-0438
Signature
Date
15 Apr 2019
CORY L. WILLIAMS, TSgt, USAF, Contracting Officer
6 CONS/PKB 813-828-1671
Cory.williams.5@us.af.mil
Signature
Date
30 Apr 2019
Andrew H. Woodbury, Capt, USAF, Local Legal Reviewer
6 AMW/JA 986-8798 (SEE LEGAL REVIEW SHEET)
andrew.woodbury.1@us.af.mil
Signature
APPROVAL (AFFARS 5306.304(a) )
Date
22 Apr 2019
MARC A. DUVAL, NH-IV
Installation Competition Advocate
Signature
WILLIAMS.CORY.LEE.13
67095896
Digitally signed by
WILLIAMS.CORY.LEE.1367095896
Date: 2019.04.15 06:09:12 -04'00'
SCHROEDER.ADAM.JO
HN.1151959640
Digitally signed by
SCHROEDER.ADAM.JOHN.1151959640
Date: 2019.04.19 09:46:47 -04'00'
WOODBURY.ANDRE
W.HART.1459823960
Digitally signed by
WOODBURY.ANDREW.HART.145
9823960 Date: 2019.04.30 18:16:03 -04'00'
DUVAL.MARC.A.100523
Digitally signed by
DUVAL.MARC.A.1005236637
Date: 2019.04.22 08:49:43 -04'00'
March 2018 FOR OFFICIAL USE ONLY Page 2 of 3
I. Contracting Activity.
6th Contracting Squadron 2610 Pink Flamingo Ave., Suite 300 MacDill AFB, FL 33621
II. Nature and/or description of the action being processed.
This is a J&A for an estimated $690,000.00 in upgrades, repairs, and maintenance to the Central Utility Plant's Caterpillar brand generators, generator controllers, and peripherals. An exact amount cannot be established until the vendor has throughly inspected the system. A new sole source purchase order will be awarded to Ring Power Corporation for this requirement.
III. Description of supplies/services required to meet agency needs.
The Central Utility Plant (CUP) at building 567 houses 2 sets of 3 generators with each set being controlled by a generator controller. The current controllers are becoming obsolete. This contract will upgrade the 2 controllers.
The total estimated value of the acquisition is $690,000.00. It will be funded with 3400 funds. There will be a 16-18 week lead time followed by a 12 day installation period. The CLIN structure will be:
CLIN 0001 - approximately Upgrade CUP's generator controllers including switchgears, program logic controllers and remote monitoring devices.
CLIN 0002 -
Repair or replace critical parts of the CUP system
The POP will start at contract award. The 12 day installation period will be coordinated with the contractor and CENTCOM to avoid any potential interference with CENTCOM's operations.
IV. Statutory authority permitting other than full and open competition.
FAR 6.302-1- 10 USC 2304(c)(1), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).
CENTCOM's Central Utility Plant (CUP) provides essential power to HQ USCENTCOM AND MARCENT. The CUP has Caterpillar brand generators that are run by Caterpillar brand controllers. These controllers are in need of upgrades due to obsolescence. The upgrades require OEM proprietary software and components that only Caterpillar's authorized distributors and trained/certified engineers and technicians can acquire, program, and install. No other brand of controller components would be compatible with the controllers and generators and no other sources are authorized to purchase and install Caterpillar parts. According to Caterpillar's corporate office, their distribution network is set up so that Ring Power Corporation is the only Caterpillar authorized provider that services the territory that includes MacDill AFB. For these reasons, Ring Power Corporation is uniquely qualified for this requirement.
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
Ring Power Corporation is the only qualified source for this requirement. To allow for additional sources, either Caterpillar would have to allow their partners to compete within the territory or the entire system of 6 generators and 2 controllers would have to be replaced. The first option is not up to the government and the second option is cost
March 2018 FOR OFFICIAL USE ONLY Page 3 of 3 prohibitive (estimated replacement cost is $8M-$10M). Whenever the system does need to be replaced, the requirement will be competed to the fullest extent practicable.
VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
It is anticipated that the cost to the Government will be fair and reasonable. The basis for this will be IAW FAR 13.106-3(a)(2) and/or 15.404-1(b)(2). The majority of the total cost is for parts. The part prices should be included in a current price list from the OEM. Additionally, market research, comparison to previous purchases, and other reasonable means will be used to determine if the total price is fair and reasonable. 6 CES will also be consulted to provide expert knowledge of this system and others on MacDill AFB.
VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.
To find other sources, internet searches and phone calls were used. Several Caterpillar authorized dealers were located via internet search. Caterpillar's corporate office was contacted to determine if sources other than Caterpillar-authorized sources could perform the work or if any other Caterpillar authorized company could compete against Ring Power. Both of these searches lead to the conclusion that Ring Power is the only qualified source for the requirement.
IX. Any other facts supporting the use of Other Than Full and Open Competition.
N/A
X. List of any sources that expressed, in writing, an interest in the acquisition.
There were no other sources that expressed interest in this acquisition.
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.
Before future repairs or upgrades are made to this Caterpillar-brand system, an analysis will be conducted to compare the cost of repair to the cost of replacement. If replacement is more cost effective, the barriers to competition will be removed.
XII. Certification by the Contracting Officer.
As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.
XIII. Certification by the technical/requirements personnel.
As evidenced by my (our) signature(s) above, I (we) certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete.
File details come from the government source that posted it.