Attach_1_Statement_of_Work.pdf

PDF 83 KB Posted

Attached to
Fire Truck Repairs - FA481419FT056 Amendment 1 Federal contract opportunity
Solicitation number
FA481419FT056
Issued by
Department of the Air Force Air Mobility Command

About this file

Attach 1 Statement of Work dated 28 Jan 19

View the file

Other files for this federal contract opportunity

Other files attached to Fire Truck Repairs - FA481419FT056 Amendment 1, newest first.
File Type Posted
Attach_1_Statement_of_Work_19_Mar_19.pdf PDF
RFQ_FA481419FT056_Amendment_3.pdf PDF
Attach_5_Photos_and_Serial_Numbers.pdf PDF
RFQ_FA481419FT056_Amendment_2.pdf PDF
RFQ_FA481419FT056_Amendment_1.pdf PDF
Attach_4_Exhibit_A_-_Sample_Parts_List.xlsx XLSX spreadsheet
Attach_3_Wage_Determination.pdf PDF
Attach_2_Provisions_and_Clauses.pdf PDF
RFQ_FA481419FT056.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

REPAIR OF KME FIRETRUCK

YEAR 2014 MODEL Panther II MFD

VIN 1K9AF4480FN058834

AT MACDILL AIR FORCE BASE

SECTION 1.0 DESCRIPTION OF SERVICES/GENERAL INFORMATION

1.1 SCOPE OF WORK

The contractor must provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to assess and facilitate the tasks required to complete the repair or rebuild the damaged fire apparatus.

The contractor must supply all parts and supplies required in the repair or rebuilding to include but not limited to front bumper, body, drivetrain, suspension powertrain and firefighting component’s required to return vehicle to NFPA 1901/1911 condition and return to MacDill Air Force Base. Additionally, vehicle will not be accepted back until a certified EVT technician inspects, tests and certifies vehicle and systems for NFPA compliance.

1.2 SPECIFIC TASKS:

1.2.1 The contractor shall load and haul the damaged truck to the repair shop with a vehicle and trailer supplied by contractor. Safely secure the truck to the transport vehicle and deliver the truck to the contractors repair shop without any further damage to the truck.

1.2.2 The contractor shall be responsible for supplying all equipment and manpower to inspect all vehicle systems to include but not limited to frame, body, cab, engine, transmission, driveline, suspension, steering, firefighting, air, electric, HVAC, exhaust, brake as well as paint.

1.2.3 The contractor shall develop a detail quote to remove and replace all worn and damaged vehicle parts and components. The contractor shall base the quote on information gained from inspection of the vehicle. The contractor shall use OEM or equivalent parts.

1.2.4 The contractor shall replace all parts and components that during the inspection are found to be damaged beyond repair or specification.

Additionally, any parts or components that are found in need of repair during the inspection are to be repaired back to manufacture specification.

1.2.5 The contractor shall accomplish the vehicle repair/rebuild without damaging any other part of the truck. If damage to the truck occurs during the repair process the repairs will be made at the contractor’s expense.

1.2.6 Load and transport the repaired truck to the point of origin. Safely secure the truck to the transport vehicle and deliver the truck to the government point of origin without any further damage to the truck.

1.2.7 As soon as practicable, and not later than 7 calendar days after completion of the work, the Contractor shall be required to submit one (1) copy of operational tests performed and a description of the replacement parts. The description shall include the part numbers of any new parts.

1.2.8 The Contractor shall provide a one-year service warranty from the date of final acceptance against defects in workmanship. The parts manufacturer or supplier shall provide their standard warranty for defects in parts and materials beginning on the date of completion.

1.2.9 The Government requires repairs to the fire truck to be completed within

180 calendar days after date of award.

1.2.10 Upon vehicles return to point of origin, Release of the vehicle from the contractor to the government will be contingent upon testing and approval of the MacDill Air Force Fire Department.

1.2.11 The contractor shall maintain a repair report of the parts and man hours used to complete the repair.