Amendment_2_Veterans_Parking.pdf
PDF 791 KB Posted
- Attached to
- Construct Veteran's Park Parking Federal contract opportunity
- Solicitation number
- FA480318B0007
About this file
Amendment 3 Construct Veterans Park Parking
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_1_Veterans_Parking.pdf | ||
| Veterans_park_Concept_and_topo_Model_(1).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMEIIDMENT OF SOLICITATION/MODITICATION OF CONTRACT
I CONTRACTID CODE
J
PAGEOF PAGES
1 2
2 AMENDMENI/MODIFICANON NO,
3 E!'!'EC IIVE DAIE
31-Aug-20'18
4 REQUISITION/PURCHASE REQ, NO 5. PRO.IECTNO (lfappl icable)
6 ISSUED BY CODF FA4803
20TH CONTRACTING SqUADRON (FA.l€@)
321CULLEN STREET
SHAWAFB SC 291'
7. ADMINISTERED BY (lforh*thar item6)
See ltem 6
8. NAME AND ADDRESS OF CONTRACTOR (No., Street. County, Sate andZip Code) X 9A, AMENDMENT OF SOLICITATION NO FA4803'r 880007
X 98. D^TED (SEE ITEM I I )
13-Aug-2018
IOA. MOD, OF CONTRACT/ORDER NO
IOB, DATED (SEE ITEM 13)
COI)E I]A'II.I'I'Y CODF
I I, THIS ITI]M ONLY APPI,IF,S TO AMENDMENTSOF SOLICITATIONS
eabovenurbtred solicitationis @trded6 sel6nh in Itml4 The hour md date specited 6r reeipt ofo Er X
OGrms! eknowledgereceipt ofthis mndrnt priorio Ihehourad date speifed ifl lhe soliciiation oras mnded by one ofthe nllo*ing m(hods
(a) By onpleting Item 8 dd ! 5, md reruming 1 copies ofthe mndrnl; (b) By &knowledging Meipt ofthis mndrent on each copy ofrhe oEr subtriltedl or(c) By sepmte Ietreror telegmwhich includes a rcG'en@ to rhe solicitataon md alMdIMt nurbm FAILUREOF YOUR ACKNOWLEDGMENTTO BE
RECEIVED A'I'THE PLACE DESIGNA'IED FOR NIE RECEIPTOf OTFERS PRIOR TO THE HOURAND DATE SPECIFIED MAY RESUL]'IN
REIECTION OF YOU R OFFER l{by vinue ofthis aftrdlmt you desir. to chogean oGr al€ady subnilled,such chmgemybenEdeby t.l egmD or lettor
?rovided eeh telcgmo.lerts nukes re€rence to rhe solicitation and this IWnd'Dt, ed is received priorlo the opening hour md dale speifed.
12. ACCOUN'l1NG AND APPROPRIATION DATA (lfrequted)
I3, TIIIS ITEM APPLIESONLY TO MODIFICATIONSOF COM'RACTYORDERS
IT MODIFIES THE CONTRACUORDER NO, AS DESCRIBED IN ITEM 14.
A. THISCHANGE ORDER ISISSUED PURSIJANT TO: (Specify auhority) THE CHANCES SET FORTH IN ITEM 14 ARE MADE lN THE
CONTRACI ORDERNO, IN ITEM IOA.
B. THE ABO\€ NUMBERED CONTRACT/ORDIIR ISMODIFIED TO REFLECT THE ADMINISTRATI\€ CHANGES (such as changes in paying ofllce, appropriation date. etc.) SET rORTH IN ITEM 14, PURSUANT TO THE AUTHORIT Y OF IjAR 43.103(8).
C, TIIIS SI]PPLEMENTAL AC]REEMENT IS ENTERED INl'O PURSUANT TO AUTHORITY OF
D. OTHER (Specify type ofmodification andauthority)
E. IMPORTANT: Contractor ! isnot. ! is required to slgn this document and return copies to the issuing offic€.
14. DESCRIPTION OF AMENDMENTMODIFICATION (Organized by UCF s€ction headings, including solicitation/contract suqiect matter \a.here feasible.)
The purpose for this AnEndnEnt is to
Ercepr 6 ptuvided herein. sll lem md conditions oflhe docurmt re$rerccd iD Itm9A o. I0A, as hereto6.. cheged,.e@ins unch&sed &d in fill 6rce dd eG.t
15A. NAME AND TITLE OF SIG\UiR (Type or print) I6,^. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TEL EI\4AIL
I5B, CON'IRACIOR/OIFEROR
(Sgnatllle ofperson authorized to sign)
I5C. DATE SCNED 168. TJNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
I6C, DATE SIGNED
31-Aug-2018
STANDARD FORM 30 (Rev. 10-83) Prcscrihed by GS,A.
FAR (48 CFR) 53.243
EXCEPTION TO SF 30
APPROWD BY OIRM I1-84
30- 105,04
I
CODE
1. Change the requirenEnt from a South Carolina License to a general contractor's license-
2. All other terrB and conditions renEin the sanE.
I
FA480318B0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been modified
BIDDER NOTES
BIDDER SCHEDULE NOTES
B.I. CLAUSE AND PROVISIONS:
a. Claus€s and provision from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and full text. Those incorporated by reference have the same force and effect as ifthey were given in full text.
b. Clauses and provisions in this document will be numbered in sequence, but will not necessarily appear in consecutive order
B-2. MINIMUM INSURANCE REQUIREMENT: In accordance with the requirement of FAR 52.228-5 "lnsurance Work on a Government Installation", the specific t)?es and amounts ofinsurance contemplated under this contract are set forth in FAR 28.307-2.
B-3. Notice to Proceed (NTP): Will be issued and the dates/times will be determined after award has been made.
B-4. The offeror and all subcontractors shall have a General Contractor's license in all areas applicable to this contract.
B-5. The Labor wage Determination current at time of award will be incorporated.
8-6- Payment and Performance bonds are required for the amount ofeach task order awarded tro be submitted within l0 calendar days ofnotice ofaward.
B-7. No-Dig Period
a. Any period of time that the contractor and/or their subcontractor are not permitted to perform any modification to any existing grade or storm drainage profile by digging, cutting an existing grade, probing, drilling, installing tie down rods, driving grounding rods, trenching and back filling, and all other penetrations to subsurface areas.
b. A no-dig day may allow the contractor access to the site and does not necessarily preclude the contractor from performing other work. A non-access day, does not allow the contractor access to the site to perform any work.
B-8. Sub Contracting Plan is only required liom other Than Small Business (OTSB) and only the apparent low bidder will be required to submit a plan for review and acceptance by the Govemment.
(End of Summary ofChanges)
SECTION OO OO OO. PROCUREMENT AND CONTRACTING REQUIREMENTS
File details come from the government source that posted it.