Statement_of_Work-_Penetrant_line.pdf
PDF 37 KB Posted
- Attached to
- Flourescent Penetrant Inspection Line Federal contract opportunity
- Solicitation number
- FA465918Q0053
About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_1.pdf | ||
| MIL_PRF_32531_(FPI_Unit).pdf | ||
| Combo.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FLOURESCENT PENETRANT INSPECTION UNIT TYPE II, PT-48
69 MX S GLOBAL HAWK
GRAND FORKS AIR FORCE BASE
GENERAL: The 69th Maintenance squadron is requesting a fluorescent penetrant inspection (FPI) line. This unit must comply with Technical Order (TO) 33B-1-2, Allowance Standard 455 (AS455), and MIL-PRF-32531. Classification is Type II (Post-emulsified with aqueous developer), Size 5 (PT-48), and Standard Form (L-to-R processing). This line is used to detect fatigue cracks and other defects open to the surface in metallic aircraft structures. Delivery of the unit must be within 120 days ARO.
1. DELIVERY/INSTALLATION:
69th MXS requires the requested item, FPI Unit, be delivered and installed at the following address within 60 calendar days after purchase: 701 Eielson Street (Bldg 605), Grand Forks AFB, ND, 58207. The POCs for this delivery are TSgt Gonzalez and SSgt Schultz, who can be reached at 701-747-5721.
2. REQUIREMENTS AND DETAILS:
69 MXS requires a Type II pt-48 Fluorescent Penetrant Inspection unit, NSN , to be delivered and installed at 701 Eielson Street (Bldg 605), Grand Forks AFB, ND, 58207. The unit must comply with all characteristics required by Technical Order (TO) 33B-1-2, Allowance Standard 455 (AS455), and MIL-PRF-32531. Dilvery and installation must both be completed within 120 Days ARO.
3. NOTES:
One hard copy of the operating manual is required to be provided with the FPI Unit. Operating Manual must be provided at the same time and the FPI Unit’s installation.
Attachments:
1) MIL-PRF-32531
| STATEMENT OF WORK |
| FLOURESCENT PENETRANT INSPECTION UNIT TYPE II, PT-48 |