Amendment 0005.doc

DOC document 41 KB Posted

Attached to
Repair Electrical Lines - Flight Line South Federal contract opportunity
Solicitation number
FA4659-10-R-0034
Issued by
Department of the Air Force Air Mobility Command

About this file

Amendment 0005

View the file

Other files for this federal contract opportunity

Other files attached to Repair Electrical Lines - Flight Line South, newest first.
File Type Posted
Sheet 01-G-001 Cover Sheet.pdf PDF
Sheet 02-C-ER01 Erosion Control Plan and Details.pdf PDF
Sheet 05-ED-101 Flight Line South Area C Electrical Work-Demo Plan.pdf PDF
Sheet 08-EJ-103 Electrical One-Line Diagram.pdf PDF
Sheet 04-E-001 Electrical Symbol Legend and General Notes.pdf PDF
Sheet 09-EJ-104 Schedules.pdf PDF
Sheet 10-EK101 Electrical Details.pdf PDF
FA4659-10-R-0034-0004.pdf PDF
FA4659-10-R-0034-0003.pdf PDF
FA4659-10-R-0034-0002.doc DOC document
Site Visit Attendance.pdf PDF
Amendment 1.doc DOC document
SolicitationCoverLetter.docx DOCX document
JFSD970328 Material Submittal Schedule.pdf PDF
Attachment 4 - Climatological Data.pdf PDF
Solicitation.doc DOC document
JFSD970328 100 Specifications.pdf PDF
JFSD970328 100 Drawings.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

The following items are applicable to this modification:

AMENDMENT 0004

The purpose of this amendment is to make the following changes:

A. Remove and replace drawing C-ERO1 with revised drawing dated 16 July 2010; revised drawing removed Area 1, removed the silt fence detail and removed the silt fence requirement along the trench.

B. Delete drawings: ED-102, ES-102, and EJ-102 in their entirety.

C. Remove and replace drawing E-001 Electrical Symbols with revised drawing dated 16 July 2010; revised drawing added Communication Utility Notes #7 spelling out how pole mounted communication lines would be handled.

D. Remove and replace drawing ED-101 with revised drawing dated 16 July 2010; revised drawing changed General Note 7.

E. Remove and replace drawing EJ-103 with revised drawing dated 16 July 2010; revised drawing reflects deletion of Area 1 work and the addition of “Switch A” detail.

F. Remove and replace drawing EJ-104 with revised drawing dated 16 July 2010; revised drawing deletes Voltage Drop Calculation for Area 1.

G. Remove and replace drawing EK-101 with revised drawing dated 16 July 2010; revised drawing added notes to Street Light Detail #3.

H. Remove and replace drawing G-001 with revised drawing dated 16 July 2010; revised drawing reflects changed Index of Drawings.

All other terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .