Attach_2_Submittal_Schedule.xls

XLS spreadsheet 62 KB Posted

Attached to
Repair Roads inside WSA Federal contract opportunity
Solicitation number
FA4626-16-R-0029
Issued by
Department of the Air Force Global Strike Command

About this file

Attachment 2 Material Submittal

View the file

Other files for this federal contract opportunity

Other files attached to Repair Roads inside WSA, newest first.
File Type Posted
Amended_Detail_4_C3.0.jpg JPG image
Questions_and_Answers_2.docx DOCX document
Drawing_Plate_C2.2_Clarification.docx DOCX document
Photos.zip ZIP file
Geo-Grid_Specification_Clarification.pdf PDF
Site_Visit_Sign_In.pdf PDF
WSA_Roads_questions_V1.docx DOCX document
Amendment_0001.docx DOCX document
Attch_9_Subcontractor_Consent.doc DOC document
Attach_4_Drawings.zip ZIP file
Attach_1_Specifications.zip ZIP file
Attach_5_Wage_Determination.docx DOCX document
Solicitation.docx DOCX document
Attach_7_Special_Contract_Requirements.docx DOCX document
Attch_8_Past_Performance_Questionaire.docx DOCX document
Attach_6_Installation_Perimeter_Access.pdf PDF
Attach_3_Schedule_of_Drawings.docx DOCX document
SYNOP_FOR_SOL_-_16R0029.doc DOC document
SYNOP_FOR_SOL_-_16R0029.doc DOC document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 11-1027REPAIR ROADS INSIDE WSAFA4626-16-R-0029
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSNOTIFICATIONOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
1As Built Field Data 01 00 00 - 3.5.243 PTFA
2Preparation As-Built Contract Drawing 01 00 00 - 3.5.31AFA
3Operating and Maintenance Instructions 01 00 00 - 3.743 PTFA
4Contractor Furnished Equipment List 01 00 00 - 3.8.143 PTFA
5Guarantees 01 00 00 - 3.8.2410 PTFA
6Shop Drawings 01 00 00 - 3.10 as Required by Technical Specifications410 PTSA
7Start of Work Notification 01 00 00 - 3.121PTSW
8Notice of Final Inspection 01 00 00 3.12114 PTFI
9Construction Near Utility Systems 01 00 00 - 3.13 (AF Form 103)1PTSW
10Utility Outage Notices 01 00 00 - 3.14114 PTO
11Quality Control Plan 01 00 00 - 3.18.24PTSW
12Quality Control Records 01 00 00 - 3.18.41EWD
131354 Checklist (Property Inventory Checklist) 01 00 00 3.30 (AF Form 1354)410 Days PTFI
14Nuclear Densometers 01 00 00 - 3.22430 days PTSW
15Construction Dewatering Permit - 01 36 00 - 2.3 & 4.1.14PTSW
16Construction Storm Water Notice of Intent 01 36 00 - 2.3 & 4.3.1.A4PTSW
17Construction Storm Water Polution Prevention Plan 01 36 00 - 2.3 & 4.3.1.B4PTSW
18Construction Storm Water Notice of Termination 01 36 00 - 2.3 & 4.3.1.14PTSW
19Demolition Activities Notification 01 36 00 - 2.44PTSW
20Hazardous Materials Report EESOH-MIS 3952 - 01 36 00 - 8.1.24PTSW
21Monthly Report of Solid Waste Disposal and Diversion - 01 36 00 - 11.34Monthly
22Waste Management Plan - 01 36 00 - 11.64PTSW
23Recovered Materials Written Determination Form - 01 36 00 - 12.44PTSW
24Recycled Material Use Report - 01 36 00 - 12.54PTSW
25Crack Seal Manufacturer's Literature and Installation Instructions 31 01 17 - 1.14PTSW
26Subrade Proctor 31 22 00 1.2.11PTSW
27Subgrade Compaction Results 31 22 00 1.2.21SRO
28Fill Material Proctor 31 22 00 1.2.31PTSW
29Fill Material Compaction Results 31 22 00 1.2.41SRO
30Geotextile 32 01 17 1.1.14PTSW
31Crushed Gravel Materials Properties 32 10 00 1.1.11PTSW
32Plant Mix Gravel 32 10 00 1.1.21PTSW
33Asphalt Cement 32 10 00 1.1.31PTSW
34Tack Coat 32 10 00 1.1.41PTSW
35Asphalt Mix Design 32 10 00 1.1.51PTSW
36Quality Control Test Result 32 10 00 1.1.61SRO
37Not Used
38Base Course Aggregate Test Reports 32 11 33 1.11PTSW
39Not Used
40Not Used1SRO
41Not Used
42Not Used
43Reflective Glass Beads 32 17 23 3.21PTSW
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
44Product Data for Grounding, 26 06 00, 1.3.A3PTSW
45Grounding Test Reports, 26 06 00, 1.3.B33 AWC
46Sidewalk Boxes, 26 11 00, 1.3.A3PTSW
47Conduits and Supports, 26 11 00, 1.3.B3PTSW
48Conductors Under 600-V, 26 12 00, 1.3.A.1PTSW
49Insulation Resistance Test Results, 26 12 00, 1.3.B3 AWC
50Panelboard Shop Drawings, 26 24 16, 1.3.B3PTSW
51Panelboard Product Data, 26 24 16, 1.3.C3PTSW
52Transformer Info, 26 27 10, 1.3.A33PTSW
53Transformer O & M Info, 26 27 10, 1.3.B33 AFI
54Transformer PCB Test and Ser. No. 26 27 10, 1.3.C3PTFA
55Surge Arrestors and Cut-Outs, 26 27 10, 1.3.D3PTSW
Schedule of Abbreviations:
AWC= After Work CompletedBMF=Before Material Delivery
PTSW= Prior to Starting WorkSN=Advance Notification
AFA= After Final AcceptanceSRO=After Each Occurrence
PTO= Prior to OutagePTFI=Prior to Final Inspection
PTNT= Prior to Notice to ProceedPTFP=Prior to Final Payment
ANTP= After Notice to ProceedPTCW=Prior to Completing Work
EWD= Each work day AF Form 3000 not requiredAFI=After Final Inspection
PTFA= Prior to Final AcceptancePTSA=Prior To Start of Action
ACA= After Contract AwardPSS=Per Submittal Schedule

&L&"Times New Roman,Regular"&12Attachment 2&CTitle: Repair Roads Inside WSA&R&"Times New Roman,Regular"&12FA4626-16-R-0029 &L&"Times New Roman,Regular"&12AF Form 66 &F-&D&C&"Times New Roman,Regular"&12 01330a-&P

REQUIRED TECHNICAL SUBMITTALS

File details come from the government source that posted it. Updated .