Question_and_Answers_0031.docx

DOCX document 23 KB Posted

Attached to
XUMU 09-1664B; Rpr Fire Alarm Panel B7525 Federal contract opportunity
Solicitation number
FA461015R0031
Issued by
Department of the Air Force Space Command

About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to XUMU 09-1664B; Rpr Fire Alarm Panel B7525, newest first.
File Type Posted
15-R-0031-0002.pdf PDF
FA4610-15-R-0031_Conformed_Through_Amendment_0002.doc DOC document
XUMU_09-1664B_Repair_Fire_Alarm_Panel _Bldg_7525.zip ZIP file
2nd_Floor.pdf PDF
15-R-0031-0001.pdf PDF
site_visit_sign_in_sheet.pdf PDF
1st_Floor_(2).pdf PDF
7525fac.pdf PDF
Attachment_II_-_RMDF.pdf PDF
Attachment_III_-_Wage_Determination.pdf PDF
Attachment_IV_-_Floor_Plan_7525.pdf PDF
Attachment_I_-_SOW_XUMU091664B_Repair_Fire_Alarm_Panel _Bldg_7525.pdf PDF
15-R-0031_Solicitation.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4610-15-R-0031; Repair Fire Alarm Panel, Bldg 7525 Question and Answers

1. Do existing buildings have fire protection systems installed?

Answer: Yes

2. Do existing buildings have fire detection systems installed?

Answer: Yes

3. Are existing systems, if installed, to remain in service until after acceptance testing of new system(s)?

Answer: Yes

4. Do existing buildings have any form of fire suppression ( ie dry chemical, clean agent) system(s)?

Answer: Yes.

5. Do existing buildings have Mass Notification Systems?

Answer: Yes.

6. Provide ceiling type for all areas of work for this project(s).

Answer: Ceiling type varies and was available for viewing at the site walk. Can be determined during design.

7. Provide wall type for all areas of work for this project(s).

Answer: Ceiling type varies and was available for viewing at the site walk. Can be determined during design.

8. Provide location of any existing alarm panels, power panels, duct type smoke detectors and fire protection risers.

Answer: This is investigative design work to be performed by the awardee.

9. If existing buildings do have any fire detection/protection systems, please advise if they will be partially re-used (wiring, conduit, devices), and if not reused will they be condemned in place or will they need to be removed.

Answer: Intact conduit may be reused. Copper wiring to be replaced. All devices are to be replaced.

10. Does the existing system have to remain functional as the new system is installed?

Answer: Yes.

11. Who is responsible for any fire watch if required?

Answer: If required, Govt will provide.

12. Who is responsible for any escorts if required?

Answer: Contractor

13. What areas will require escorts?

Answer: This can be determined during design.

14. Can you provide the Mechanical equipment schedule so as to identify any equipment that needs to be part of the new FA system?

Answer: This is investigative design work to be performed by the awardee.

15. Can you provide the electrical plan sheets for the mechanical equipment so we can identify where to interrupt the power for the new FA system?

Answer: This is investigative design work to be performed by the awardee.

16. Will Plenum wiring be allowed so long as it meets or exceeds base standards for low voltage cable management systems?

Answer: No, all wire must be in conduit.

17. Can you provide a copy of the fire alarm device layout wall plaque that is located above each existing annunciator or at the main FACP, which shows all the existing locations?

Answer: This is not available. Contractor may take a picture of this.

18. Who is responsible for cosmetic repairs to existing wall paper that is no longer available?

Answer: Contractor shall match existing or as close as possible

19. Does all exposed conduit have to be painted to match existing surfaces?

Answer: Yes

20. Is red conduit required?

Answer: Contractor’s design shall meet all applicable codes.

21. Please provide mechanical "As builts" and or number of HVAC units that will be require duct detectors and shut down per code.

Answer: This is investigative design work to be performed by the awardee.

22. Will wall paper or special finish surfaces require to be repaired to match the exisitng ?

Answer: See answer to Question 18

23. Can blank plates be used in place of matching existing finishes and wall paper?

Answer: No.

24. There are 2 high bays at 60’ with a lot of lower rooms obstructing the way. This turns out be sprinkled so it’s a gut of all old devices which we need the device layout for demo since we didn’t walk the whole site and count everyone? Q8 needed!

Answer: Drawings will be poste don FBO.gov

File details come from the government source that posted it. Updated .