Question_and_Answers_0027.docx
DOCX document 18 KB Posted
- Attached to
- XUMU 09-1612B; Rpr Fire Alarm Panel, B11433 Federal contract opportunity
- Solicitation number
- FA461015R0027
About this file
Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW_XUMU091612B_Replace_Fire_Alarm_Control_Panel_Bldg_11433.docx | DOCX document | |
| 19991122_LBP_Survey_11433.pdf | ||
| 15-R-0027-0001.pdf | ||
| 11433_Floor_Plan.pdf | ||
| Site_Visit_Sign_in_Sheet.pdf | ||
| Attachment_IV_-_11432_FLRPLN.pdf | ||
| FA4610-15-R-0027_Solicitation.pdf | ||
| Attachment_III_-_Wage_Determination.pdf | ||
| Attachment_II_-_RMDF.pdf | ||
| Attachment_I_-_SOW_XUMU091612B_Replace_Fire_Alarm_Control_Panel_Bldg_11432.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4610-15-R-0027; Repair Fire Alarm Panel, Bldg 11433 Question and Answers
1. Do existing buildings have fire protection systems installed?
Answer: No the building (singular) does not.
2. Do existing buildings have fire detection systems installed?
Answer: The building has an outdated fire detection system that is unserviceable
3. Are existing systems, if installed, to remain in service until after acceptance testing of new system(s)?
Answer: To be determined during design
4. Do existing buildings have any form of fire suppression ( ie dry chemical, clean agent) system(s)?
Answer: See answers to question 1…
5. Do existing buildings have Mass Notification Systems?
Answer: No
6. Provide ceiling type for all areas of work for this project(s).
Answer: T bar drop ceiling
7. Provide wall type for all areas of work for this project(s).
Answer: cube dividers and drywall
8. Provide location of any existing alarm panels, power panels, duct type smoke detectors and fire protection risers.
Answer: Was available for viewing at the site visit. This can also be investigated during the design phase by the awardee.
9. If existing buildings do have any fire detection/protection systems, please advise if they will be partially re-used (wiring, conduit, devices), and if not reused will they be condemned in place or will they need to be removed.
Answer: See SOW
10. Does the existing system have to remain functional as the new system is installed?
Answer: This can be determined during the design phase.
11. Who is responsible for any fire watch if required?
Answer: This can be determined during the design phase.
12. Who is responsible for any escorts if required?
Answer: No escorts required
13. What areas will require escorts?
Answer: No escorts required
14. Can you provide the Mechanical equipment schedule so as to identify any equipment that needs to be part of the new FA system?
Answer: This can be determined during the design phase.
15. Can you provide the electrical plan sheets for the mechanical equipment so we can identify where to interrupt the power for the new FA system?
Answer: This can be determined during the design phase.
16. Will Plenum wiring be allowed so long as it meets or exceeds base standards for low voltage cable management systems?
Answer: Contractor shall follow all applicable codes with respect to low voltage conduit.
17. Can you provide a copy of the fire alarm device layout wall plaque that is located above each existing annunciator or at the main FACP, which shows all the existing locations?
Answer: This item does not exist. The floorplan however is available as an attachment to the solicitation.
18. Who is responsible for cosmetic repairs to existing wall paper that is no longer available?
Answer: The contractor will be responsible to match existing as close as possible
19. Does all exposed conduit have to be painted to match existing surfaces?
Answer: Yes
20. Is red conduit required?
Answer: If required by code