Mini_SABER_Amendement_01_short_form_of_changes.pdf
PDF 179 KB Posted
- Attached to
- Mini SABER Solicitation Federal contract opportunity
- Solicitation number
- FA4610-12-R-0001
About this file
Amendement 01 short version detailing changes made.
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose for this amendment is to remove "non standard hours".
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jan-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4610-12-R-0001
X 9B. DATED (SEE ITEM 11)
04-Jan-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jan-2013
CODE
FA4610 - 30TH CONS
1515 ICELAND AVE. (BLDG 8500), RM 150
VANDENBERG AFB CA 93437-5212
FA4610 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4610-12-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from The contractor shall perform maintenance, repair, and minor construction IAW Attachment 1, Specifications for Simplified Acquisition of Base Engineering Requirement
(SABER) and as identified by other specific specifications/work statements in each task order issued against the contract. COEFFICIENTS - to be completed by Offeror: 0001 Standard Hours
____________0002 Non-Standard Hours ____________ to The contractor shall perform maintenance, repair, and minor construction IAW Attachment 1, Specifications for Simplified Acquisition of Base Engineering Requirement (SABER) and as identified by other specific specifications/work statements in each task order issued against the contract. COEFFICIENTS - to be completed by Offeror: 0001 Standard Hours
CLIN 1001
The CLIN extended description has changed from The contractor shall perform maintenance, repair, and minor construction IAW Attachment 1, Specifications for Simplified Acquisition of Base Engineering Requirement
(SABER) and as identified by other specific specifications/work statements in each task order issued against the contract. COEFFICIENTS - to be completed by Offeror: 0001 Standard Hours
____________0002 Non-Standard Hours ____________ to The contractor shall perform maintenance, repair, and minor construction IAW Attachment 1, Specifications for Simplified Acquisition of Base Engineering Requirement (SABER) and as identified by other specific specifications/work statements in each task order issued against the contract. COEFFICIENTS - to be completed by Offeror: 0001 Standard Hours
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTIONS FOR PROPOSALS
PROPOSAL PREPARATION
A. GENERAL INSTRUCTIONS: This section provides general guidance for preparing proposals, as well as specific instructions on the format and content of the proposal. Throughout this section, the term “offeror” includes subcontractors, teammates and/or joint venture partners, and key personnel. The offeror’s proposal must include all data and information requested and must be submitted in accordance with these instructions.
Any offeror who submits an incomplete package may be considered non-responsive. The offer shall be compliant with the requirements as stated in the Request for Proposal (RFP). A proposal that is sufficiently documented to support cost/price and technical requirements in a complete, orderly, and specific detailed manner will enable the Government to perform a thorough and fair evaluation. Non-compliance with the instructions and RFP may result in an unfavorable proposal evaluation and may be grounds to eliminate the proposal from consideration for contract award.
B. TYPE OF ACQUISITION: This acquisition is a competitive 8(a) limited to contractors with a California
State licenses Class A (General Engineering Contractor) or Class B (General Building Contractor). For this acquisition, selection of the best value offeror(s) will be made using Lowest-Price Technically Acceptable
(LPTA) with the technical factors being evaluated on a pass/fail basis.
C. DISCREPANCIES AND AMBIGUITIES: If an offeror believes that the requirements in these instructions contain an error, omission, ambiguities, or are otherwise unsound, the offeror shall immediately notify the CO in writing with supporting rationale no later than 10 calendar days after the RFP release.
D. MISTAKES: Mistakes in offeror’s proposal shall be handled in accordance with FAR 14.407-4 as referenced in FAR 15.508.
E. POSTPONEMENT OF PROPOSAL CLOSING DATE: If a determination is made to postpone a proposal closing date, an announcement of the determination shall be posted to the Electronic Posting System (EPS) and, if practicable, before issuance of a formal RFP amendment otherwise communicated to prospective offerors.
F. POST-AWARD/PRE-PERFORMANCE CONFERENCE: A post-award/pre-performance conference will be scheduled by and held prior to the commencement of any work at that installation under the awarded contract. The offeror or his duly authorized representative is required to attend the post-award/pre-performance conference.
G. DISCUSSIONS: When discussions or requests for revised offers are not conducted or requested by the
Government, the coefficient prices identified in Schedule B shall be valid through the proposal acceptance period (SF 1442 Block 13 D), whereby the Contracting Officer will incorporate the most current Department of
Labor wage decisions identified in Section J at the time of contract award.
H. CONTRACT DOCUMENT: Sections K, L and M apply to the solicitation phase only; therefore, they will not be a physical part of the resulting contract.
I. POINT OF CONTACT (POC): The POC for this acquisition is the Procuring Contracting Officer (CO), William Davis and the Contract Specialist, Jessica Nelson. Written requests for clarification may be sent to the
CO/CS. Address any questions or concerns to them using the following contact information:
William Davis Jessica Nelson
(William.Davis.18@us.af.mil) (Jessica.Nelson.6@us.af.mil)
30 CONS/LGCA 30 CONS/LGCA
1515 Iceland Ave Bldg 8500 1515 Iceland Ave Bldg 8500
Vandenberg AFB, CA 93437 Vandenberg AFB, CA 93437
Phone: (805) 605-0496 Phone: (805) 605-3916
L-1 PROPOSAL PREPARATION INSTRUCTIONS
The proposal package must be completed and returned to the address in Block 7 of the SF 1442, prior to the time set for closing of proposals, see Block 13 A of the SF 1442.
A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.
Proposals must be complete, self-sufficient, and respond directly to the requirements of this solicitation;
alternate proposals will not be accepted. The response shall consist of two (2) separate volumes; Volume I -
Price and Executed Contract Documentation and Volume II Technical Proposal.
B. The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the Contracting Officer will review this determination and if in the contracting officer's opinion adequate price competition exists, no additional cost information will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists; offerors may be required to submit information to the extent necessary for the contracting officer to determine the reasonableness of the price.
mailto:William.Davis.18@us.af.mil mailto:Jessica.Nelson.6@us.af.mil
C. Format for proposal Volumes I and II shall be as follows:
(1) USE OF COMMERCIAL SYSTEMS TO TRANSMIT SOURCE SELECTION SENSITIVE INFORMATION:
To facilitate review and evaluation for this source selection the Government proposes to transmit data via commercial systems. Distributed material will be identified as source selection sensitive and distribution will be strictly limited to appropriate personnel, and shall be encrypted per AFSPC 5315.308-91. Should any contractor object to their proprietary information being shared between source selection evaluators and advisors via commercial email as described above, please advise the Contract Specialist Jessica Nelson at
(805) 605-3916 or the Contracting Officer William Davis at (805) 605-0496.
(2) HAND-CARRIED PROPOSALS NOTICE: Offerors are cautioned that Vandenberg AFB has stringent visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass and be cleared by the Government point of contact prior to entrance. It is possible that the point of contact may not be available to clear offerors for entrance, which may prohibit submission of hand-carried proposals; consequently, offerors electing to hand-carry their proposals for submittal just prior to closing time do so at their own risk.
(3) The proposals will be on 8 1/2” x 11” paper, white or ivory stock. Charts, tables or diagrams may not exceed 11” x 17”.
(4) A page is defined as one face of a sheet of paper containing information. This includes all appendices, charts, graphs, diagrams, tables, photographs, etc, unless placed on 11” x 17” sheets, in which case they will be counted as two pages. Covers for volumes, tables of contents, indices, title pages, cross reference indices, and section dividers/tables will not be included in the page count if they are inserted solely to provide ease to the reader in locating volumes/sections of the proposal. They will be counted if they contain any other information, (e.g. diagrams, extraneous data, etc). Pages marked “This page intentionally left blank” will not be counted.
(5) Typeface shall not be less than 12 font, with 1” margins on all sides. Smaller, legible font size, no smaller than 6 point, may be used for charts and tables.
(6) Elaborate formats, bindings or color presentations are not desired or required. Company Name and solicitation number shall be included in the header of each page. Each binder will be labeled with the following format: FA4610-12-R-0001, COMPANY NAME, Volume I Price or Volume II Technical. See
Table Below for specific number of copies and pages, etc.
TITLE
OF COPIES
MAXIMUM #
OF PAGES
Volume I Price with Executed
Contract Documentation
Original and 3 copies
50 pages
Volume II
Technical Proposal
Original and 3 copies
50 pages, excluding the Past
Performance
(7) Proposal revisions shall conform to the requirements of this section and must be clearly marked to show the changes, on different color stock as directed by the Contracting Officer.
(8) Documents submitted in response to this solicitation must be fully responsive to and consistent with the following:
(i) Requirements of the solicitation, and government standards and regulations pertaining to the specification.
(ii) Evaluation Factors for Award in Section M of this solicitation.
(iii) Any limitation on the number of proposal pages. Pages exceeding the page limitations set forth in this Section L will be removed from the proposal and not read or evaluated.
D. SPECIFIC INSTRUCTIONS, SUBMIT THE FOLLOWING:
VOLUME I – PRICE AND EXECUTED CONTRACT DOCUMENTATION
(1) Chapter 1 – SF 1442. Complete fields 20A, 20B, and 20C. In doing so, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through J. These sections constitute the model contract.
(2) Chapter 2 – Section B. Insert the proposed Coefficient in Section B for each Coefficient including the option period. Limit coefficient to four (4) decimal places. Also, provide the coefficient sheet demonstrating the calculation of the proposed coefficient
(3) Chapter 3 – Section C through J. Complete applicable blanks, the offeror shall submit only those pages that require a fill-in.
(4) Chapter 4 – Section K. Complete the representations, certifications, and acknowledgments. Section K shall be returned in its entirety
(5) Acknowledge all amendments issued to the solicitation.
(6) Provide a letter from the SBA showing proof of section 8(a) status, or in the case of a teaming arrangement or joint venture, provide evidence of SBA sanction of the teaming effort.
(7) The offeror will provide a description of work that they intend to perform within their own organization to meet the requirements of FAR clause 52.219-14.
(8) Complete Attachment 6 the coefficient worksheet. Each offeror is to fill in each expense with either a zero or the amount they estimate the expense will cost. Also, the overhead and profit shall be filled in by each offeror. The $4,000,000 revenue from this contract will remain fixed for all offeror’s. This method will provide the fairest competition for each offeror and the best value to the government.
VOLUME II -TECHNICAL PROPOSAL
Offerors must meet a minimum standard of acceptability in all sub-factors of the Technical Factor to be determined technically “acceptable”. The Minimum Standard of Acceptability is defined in Section “M” for each sub-factor.
(1) Sub-Factor 1- Organizational Structure
(2) Sub-Factor 2- Contractor’s License (California “A” or “B” License)
(3) Sub-Factor 3- Bonding Capacity ($3M Single Award minimum /$10M Aggregate minimum)
(4) Sub-Factor 4- Quality and Safety Overview
(5) Sub-Factor 5- Past Performance
SECTION M - EVALUATION FACTORS FOR AWARD
The following have been modified:
EVALUATIONS OF PROPOSALS
M-1 SOURCE SELECTION
A. Basis for Contract Award: This is a competitive Lowest Price Technically Acceptable (LPTA) source selection in which technically acceptable competing offerors' will be evaluated on Technical acceptability and low price. Offerors must pass the technical evaluation for further consideration of their proposal. Only those proposals determined to be technically acceptable, either initially or as a result of discussions, will be considered for award. Where applicable, the techniques and procedures described under FAR 15.404-1 will be the primary means of assessing proposal reasonableness. The Government intends to award a contract(s) without discussions with respective offerors; therefore, offerors should submit proposals, which represent their best efforts. The Government, however, reserves the right to conduct discussions if deemed in its best interest.
The Government proposes to award contracts to up to two offerors whose technically acceptable proposals represent the best overall value to the government based on the total evaluated coefficient and the technical acceptability. Failure to propose for any item in the Coefficient Schedule B, including any option year, or failure to comply with any terms and conditions of this solicitation may cause the offeror’s proposal to be rejected as non-responsive. The two lowest averaged coefficients, which are also realistic and technically acceptable, will each be awarded a contract.
B. Evaluation Process: Cost/Price will be evaluated based on contractor coefficients where an average of the contractor’s coefficients for each CLIN will be taken (Refer to Section M-2 Factor 1). Technical Proposals will be evaluated for technical acceptability on a pass/fail basis (Refer to Section M-2 Factor 2). Recent and relevant past performance will be evaluated as a sub-factor of the technical evaluation.
C. Number of Contracts to Be Awarded: The Government may award up to two contracts for this acquisition.
M-2 EVALUATION FACTORS AND SUBFACTORS
A. Evaluation of Proposals: The Government will select the proposal(s) that gives the best value to the
Government. To arrive at a decision, the Source Selection Evaluation Team will assess each offer in accordance with the following evaluation factors:
Factor 1: Price/Cost Factor
Factor 2: Technical Capability Factor
Sub-factor 1: Organizational Chart
Sub-factor 2: Contractor’s License (California “A” or “B” License)
Sub-factor 3: Bonding Capacity ($3M Single Award minimum /$10M Aggregate minimum)
Sub-factor 4: Quality and Safety Overview
Sub-factor 5: Past Performance
Recent and Relevant Performance within 3 years from release of RFP
Maximum of 3 contracts for prime contractor
Multi disciplined renovation efforts for non-residential projects
B. Relative Importance or Weighting of the Factors: The relative importance or weighting of each factor is as follows: The technical proposal must meet minimum standards on a pass/fail basis. Factor 1 (Price/Cost) will be listed lowest to highest.
Factor 1- Price/Cost: The Government will evaluate all items identified in Section L Volume I (1-8). The
Government will ensure all fill-ins are complete; all Small Business documentation is in order. Each Offeror will submit a coefficient for each CLIN. All coefficients from Section B will be added and averaged to arrive at one number for evaluation purposes only. The contractor shall provide a completed Attachment 6 coefficient worksheet, which will be evaluated for realism and reasonableness. Generally, adequate price competition will satisfy the criteria for price reasonableness. All coefficients will then be ranked in order from lowest to highest.
Evaluation Process
Step 1: Perform price evaluations on all proposals and rank them from lowest to highest;
Step 2: Conduct technical evaluations beginning with the lowest priced offeror. Technical evaluations will cease when the government has identified the two lowest priced proposals which are technically acceptable. If the lowest priced Offeror is determined to be technically unacceptable, then the next lowest priced Offeror will be evaluated. This process will be repeated until the government has identified the two lowest priced technically acceptable offerors. In the event that an insufficient number of offerors are found to be technically acceptable the government reserves the right to open discussions. Only those offerors determined to be technically acceptable, either initially or as a result of discussions, will be considered for award;
Factor 2- Technical Capability: The Government Technical Evaluation Team shall evaluate, on a pass/fail basis the following sub-factors:
Technical proposals will be evaluated for acceptability in accordance with the Criteria and Minimum Standard of Acceptability set forth in this section. (Sub-Factors 1 through 5, inclusive).
Offerors must fulfill the MINIMUM STANDARD OF ACCEPTABILITY for each technical Sub-Factor in order to achieve a “passing” evaluation.
(1) Sub-Factor 1- Organizational Structure A. CRITERIA: Offeror must provide an organizational chart identifying all key personnel with a description of their work experience relating to projects similar in scope to those expected under SABER. Additionally, attach a document describing the organization’s program management policies, procedures, and processes.
B. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard is met when the offeror provides:
(i) A block diagram identifying the individuals (management and supervisors) associated with the project to include:
1. Each individual’s name, title, duty, years of experience and experience level relating to projects similar in scope to those expected under SABER IAW the General
Specifications, Section 01 31 01.
(ii) A description of the organization’s program management policies and procedures to include the project planning approach, the process for information flow, reporting, and the policies and procedures for maintaining and selecting qualified staffing throughout the contract period for prime and subcontractor employees.
(2) Sub-Factor 2- Contractor’s License A. CRITERIA: Offeror must possess a current California State Contractor’s License Type “A” or “B”.
B. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard is met when the offeror submits a copy of its current California State Contractor’s License Type “A” or “B”.
(3) Sub-Factor 3- Bonding Capacity ($3M Single Award minimum /$10M Aggregate minimum)
A. CRITERIA: Offeror must provide evidence that it is able to obtain a minimum single project bonding capacity of $3M and a minimum aggregate bonding capacity of $10M.
B. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the offeror submits bonding capability documents that meet the aggregate and project amounts, backed by a bonding surety with an A.M. Best company rating of ‘A’. The document must also include the surety company’s name, address, phone number, and points of contact.
(4) Sub-Factor 4- Quality and Safety Overview
A. CRITERIA: Offeror must demonstrate its ability to design and implement a Quality Control
Plan in accordance with General Specifications Section 01 45 01.
B. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard is met when the offeror provides a detailed narrative describing Project Management’s Quality Control and
Safety Plan in accordance with General Specifications Section 01 45 01. The narrative must include but not necessarily be limited to a description of the company’s methodology for writing and disseminating daily reports; a description of the company’s methodology in handling interim inspections, pre and final inspections and the tests required for Task Order level identified projects; a description of the company’s procedures for handling punch list items and warranty issues; and a description of the company’s procedures for review and approval of material submissions. In addition, the offeror must describe the approach for safety training, quality control, and ability to maintain qualified staffing throughout the contract period.
(5) Sub-Factor 5- Past Performance
A. CRITERIA: Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown (see below).
Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”
B. MINIMUM STANDARD OF ACCEPTABILITY: Offeror must provide satisfactory past performance no older than three years from the date of the solicitation where the offeror was the prime contractor and which involved work similar in scope and complexity to the work contemplated by this SABER contract. For purposes of this sub-factor, the expression
“…work similar in scope and complexity to the work contemplated by this SABER contract” means:
(i) Multi disciplined renovation efforts for non-residential projects ranging in dollar value greater than $100,000. Projects must consist of any performance on a broad range of maintenance, repair, alteration or new construction of real property, but not limited to renovation, additions, upgrades, abatement, utility work, carpentry, asbestos abatement and disposal, demolition, site work, cast-in-place structural steel, millwork, mechanical
(including HVAC), electrical, plumbing, concrete masonry, painting, and other specialty and general contracting work. Offeror must submit the following information for up to three contracts performed in the past three years where offeror was the prime contractor and which evidence the requisite past performance:
a. Contract Number
b. Date of Award
c. Period of Performance
d. Description of Work
e. Name, address, and telephone number of PCO, ACO, Program Manager
Note: The Government may also use past performance information obtained from sources other than those identified by the offeror.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .