Attachment_5_Questions_and_Answers.pdf

PDF 110 KB Posted

Attached to
Offutt Fieldhouse Drainage Improvements B321 Federal contract opportunity
Solicitation number
FA4600-18-R-0016
Issued by
Department of the Air Force Air Combat Command

About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Offutt Fieldhouse Drainage Improvements B321, newest first.
File Type Posted
Attachment_4_City_of_Omaha_Specifications.pdf PDF
Attachment_2_Revised_SGBP_95-0106_Combined_Specs.pdf PDF
FA4600-18-R-0016-0001.pdf PDF
Attachment_1_Wage_Determination.pdf PDF
FA4600-18-R-0016.pdf PDF
Attachment_3_SGBP_95-0106_PDF_DWG.PDF PDF
Attachment_2_SGBP_95-0106_Combined_Specs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4600-18-R-0016 Questions and Answers

1. Question: Removal note #6, “Perform rubblization on P.C. concrete pavement”. Please provide clarification on this note. What size requirement will the contractor be required to break down the pavement?

Answer: See Spec section “BASE COURSE FROM RUBBLIZED CONCRETE PAVEMENTS” Para 3.6

RUBBLIZATION CRITERIA

2. Question: Will the government consider issuing a requirement for all contractors to demo, load and haul away the existing pavement and crush the pavement into recycled concrete and resuse it for the base stabilization?

Answer: All bids should be submitted in accordance with the attached specifications.

3. Questions: At the site visit steel columns were discovered in the pavement throughout, will the contractor be required to remove, and or cut the steel columns?

Answer: All columns and footings shall be treated like utilities per GENERAL NOTE 9 on sheet 3 and 4.