Attachment_5_Questions_and_Answers.pdf
PDF 110 KB Posted
- Attached to
- Offutt Fieldhouse Drainage Improvements B321 Federal contract opportunity
- Solicitation number
- FA4600-18-R-0016
About this file
Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_4_City_of_Omaha_Specifications.pdf | ||
| Attachment_2_Revised_SGBP_95-0106_Combined_Specs.pdf | ||
| FA4600-18-R-0016-0001.pdf | ||
| Attachment_1_Wage_Determination.pdf | ||
| FA4600-18-R-0016.pdf | ||
| Attachment_3_SGBP_95-0106_PDF_DWG.PDF | ||
| Attachment_2_SGBP_95-0106_Combined_Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4600-18-R-0016 Questions and Answers
1. Question: Removal note #6, “Perform rubblization on P.C. concrete pavement”. Please provide clarification on this note. What size requirement will the contractor be required to break down the pavement?
Answer: See Spec section “BASE COURSE FROM RUBBLIZED CONCRETE PAVEMENTS” Para 3.6
RUBBLIZATION CRITERIA
2. Question: Will the government consider issuing a requirement for all contractors to demo, load and haul away the existing pavement and crush the pavement into recycled concrete and resuse it for the base stabilization?
Answer: All bids should be submitted in accordance with the attached specifications.
3. Questions: At the site visit steel columns were discovered in the pavement throughout, will the contractor be required to remove, and or cut the steel columns?
Answer: All columns and footings shall be treated like utilities per GENERAL NOTE 9 on sheet 3 and 4.