19RA026_Q&A.pdf

PDF 493 KB Posted

Attached to
Combined ITB & Fiber Optics Federal contract opportunity
Solicitation number
FA4528-19-R-A026
Issued by
Department of the Air Force Global Strike Command

About this file

This document contains a site visit question and answer session and a federal contract opportunity notice for fiber optic installation services. The question and answer session addresses technical queries about installing fiber optic cable and network equipment at various buildings on an Air Force base. The federal contract opportunity seeks proposals to install single mode fiber optic cable connecting Information Transfer Buildings 744, 870, and 475 to 23 other buildings on the base. The contract value is estimated between $1,000,000 to $5,000,000. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses. Offerors must register in the System for Award Management database and download the full solicitation from the FedBizOpps website. Proposals are due at least 15 days after this pre-solicitation notice publishes. The North American Industry Classification code is 237130 and the business size standard is $36.5 million in average annual receipts for the past three years.

Q&A

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Visit Questions 8/19/19

FA4528-19-R-A026 Combined ITB and Fiber Optics:

1.) Building 121 – Network Building Will additional rack be provided for fiber?

We are installing a new rack for Bldg 121 that will be completed before this project starts.

2.) Building 174 – JDC

1.) The map has the Comm room marked which is currently being used as the Directors Office

(room 103). The rack will take up about half the office. Is the facility aware of this?

The new plan is to locate the Cabinet on the opposite side of the wall to reduce eyesore.

3.) Backroom (room 108) The refridge unit is right in the way and we can’t go through it. It must be re-routed somewhere in the building.

4.) Can ducts be 2 inch be used instead of 4 inch? Yes

4.) Building 166 – CDC

Can ducts be 2 inch be used instead of 4 inch? Yes

4.) Building 146- Outdoor Rec

5.) Building 156- Bowling Alley Pictures provided to CONS

6.) Building 145- Honor Guard section of CCC

7.) Building 292 – JR Rockers 1.) The comm cabinet needs to be relocated- to the clock room

8.) Building 294 – Theater

9.) Building 284 – Papa Johns 1.) Box location noted is not available – appears to be taken by cable television.

Addition back board, cabling, etc. will be required.

10.) Building 284 – Vet Clinic 1.) Shared used cabinet- lock broken 2.) Must coordinate to access building

11.) Building 980 – 5 MUNS Inspection Building 1.) Wet land area – surrounding building (North and east) cut through or reroute?

SCXP has confirmed with Mr. Getty there is wetland in the area. The new plan is to continue east from newly installed HH-177-8A staying south of the wetlands to pre-existing HH 177-7 and proceed north with new 12 strand to splice at MH 177-10.