Attachment_2_-_Specifications_-_QJVF_16-6032_Revised.pdf
PDF 1 MB Posted
- Attached to
- Install Rural Water Federal contract opportunity
- Solicitation number
- FA4528-17-R-0009
About this file
Specification 6032 revised
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_8_-_Past_Performance_Information_Form.docx | DOCX document | |
| Attachment_6_-_Drawings_-_QJVF_16-6033.pdf | ||
| Attachment_3_-_Specifications_-_QJVF_16-6033_Revised.pdf | ||
| Attachment_5_-_Drawings_-_QJVF_16-6032.pdf | ||
| Attachment_7_-_Wage_Rates.docx | DOCX document | |
| Attachment_9_-_Financial_Responsibility.docx | DOCX document | |
| FA4528-17-R-0009.pdf | ||
| Attachment_4_-_Drawings_-_QJVF_15-6004.pdf | ||
| Attachment_1_-_Specifications_-_QJVF_15-6004_Revised.pdf | ||
| Synopsis_Notice.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S P E C I F I C A T I O N
FOR PROJECT
QVJF 16-6032
U
U
INSTALL RURAL WATER, MAF E-1
AT
MINOT AIR FORCE BASE, NORTH DAKOTA
PREPARED BY:
5 CES, MISSILE ENGINEERING FLIGHT
MINOT AIR FORCE BASE, NORTH DAKOTA
UFEBRUARY 2017
Connect Echo 1 Missile Alert Facility to Rural Water
QJVF 16-6032
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 01 14 00
01 32 16.00 20 01 33 00 01 35 26 01 78 00
SUMMARY OF WORK
WORK RESTRICTIONS
ENVIRONMENTAL PROTECTION
CONSTRUCTION PROGRESS DOCUMENTATION
SUBMITTAL PROCEDURES
GOVERNMENTAL SAFETY REQUIREMENTS
CLOSEOUT SUBMITTALS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 31 - EARTHWORK
31 23 00.00 20 EXCAVATION AND FILL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 11 00 WATER DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
01 14 31
Connect Echo 1 Mi ssi l e Al er t Faci l i t y t o Rur al Wat er
QJVF 16- 6032
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 11 00
SUMMARY OF WORK
12/16
PART 1 GENERAL
1. 1 SUBMI TTALS
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
1. 2. 2 Pr oj ect Locat i on
1. 2. 3 Pr oj ect Per i od of Per f or mance:
1. 2. 4 Wi nt er Excl usi onar y Per i od
1. 3 CONTRACT DRAWI NGS
1. 4 ADMI NI STRATI VE REQUI REMENTS
1. 4. 1 Pr e- Const r uct i on Meet i ng
1. 4. 2 Wor k Schedul e
1. 5 OCCUPANCY OF PREMI SES
1. 6 ON SI TE PERMI TS
1. 7 LOCATI ON OF UNDERGROUND UTI LI TI ES
PART 2 PRODUCTS
PART 3 EXECUTI ON
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 11 00 Page 1
SECTI ON 01 11 00
SUMMARY OF WORK
12/16
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES
SD- 01 Pr econst r uct i on Submi t t al s
Excavat i on Per mi t s; G
Wel di ng Per mi t s; G
Ut i l i t y Out age Request s; G
Ut i l i t y Connect i on Request s; G
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
a. Connect Mi ssi l e Al er t Faci l i t y ( MAF) at Echo 1 t o al r eady exi st i ng r ur al wat er ser vi ce l i ne usi ng hor i zont al dr i l l i ng ( t r enchl ess ut i l i t i es) .
b. I nst al l 1 i nch pol yet hyl ene ( PE) wat er l i ne, f i t t i ngs, coupl i ngs, t r acer wi r e, and wat er ser vi ce l i ne appur t enances as shown on pr oj ect dr awi ngs and speci f i ed i n sect i on 33 11 00, Wat er Di st r i but i on. Di s i nf ect and t est ser vi ce l i ne as r equi r ed i n 33 11 00.
c. Abandon i n pl ace t he exi st i ng 175 f oot i n ser vi ce wat er wel l per st at e of Nor t h Dakot a r egul at i ons. Remove wat er l i nes, cur b st ops and el ect r i cal l i nes per t ai ni ng t o wel l oper at i on.
d. Remove sel ect i ve expansi on t ank, sel ect i ve el ect r i cal component s, and pi pe i n wat er r oom. Reconf i gur e pl umbi ng i n t he Sour ce Gr oup 104 such t hat t he dept h f i l t er s ( WDF 104A and WDF 104B) become par t of t he Tr eat ment Gr oup 102. Change t he f i l t er s f r om dept h f i l t er s t o car bon f i l t er s, r e usi ng t he f i l t er housi ngs. Fl ush, dr ai n, t est and di s i nf ect t he modi f i ed pl umbi ng l i nes as r equi r ed i n 22 00 00
The wor k i ncl udes al l of t he above and i nci dent al wor k r equi r ed t o pr ovi de a compl et e and useabl e wat er ut i l i t y l i ne connect i on f r om r ur al wat er cur b st op t o MAF Echo 1
1. 2. 2 Pr oj ect Locat i on
Pr oj ect l ocat i on i s at Echo 1 Mi ssi l e Al er t Faci l i t y ; McLean Count y Nor t h Dakota.
1. 2. 3 Pr oj ect Per i od of Per f or mance:
Once awar ded, t he per i od of per f or mance i s 150 wor ki ng days ( t hi s t i me
SECTI ON 01 11 00 Page 2 i ncor por at es t he days l i s t ed i n sect i on 1. 4 WORK SCHEDULE, of t hi s specification).
1. 2. 4 Wi nt er Excl usi onar y Per i od
A wi nt er excl usi onar y per i od wi l l be per mi t t ed f r om 15 Nov- 17- 15 Apr i l 18.
1. 3 CONTRACT DRAWI NGS
The f ol l owi ng cont r act dr awi ngs accompany t hi s speci f i cat i on and ar e a par t thereof:
Dr awi ng No. QJVF 16- 6032 Sheet T1, C1- C2 & P1
One El ect r oni c ver si on of t hese speci f i cat i ons and dr awi ngs al ong wi t h one pr i nt ed set of f ul l s i ze cont r act dr awi ngs and speci f i cat i ons wi l l be f ur ni shed t o t he Cont r act or wi t hout char ge. Ref er ence publ i cat i ons wi l l not be f ur ni shed. I mmedi at el y check f ur ni shed dr awi ngs and not i f y t he Gover nment of any di scr epanci es.
1. 4 ADMI NI STRATI VE REQUI REMENTS
1. 4. 1 Pr e- Const r uct i on Meet i ng
Once awar ded, t he Cont r act or , al ong wi t h member s f r om Mi ssi l e Engi neer i ng ( CEM) shal l at t end a pr e- const r uct i on meet i ng headed by t he Cont r act i ng Of f i cer . The pur pose of t hi s meet i ng i s t o:
a. Cont r act or pr ovi des Cont r act i ng Of f i cer wi t h vehi c l e l i s t and cont r act or per sonnel i dent i f i cat i on, i nf or mat i on r equi r ed f or Mi ssi l e Engi neer i ng Fl i ght per sonnel t o pr ocess Ent r y Aut hor i zat i on Let t er
b. Est abl i sh st or age l ocat i on of Cont r act or owned mat er i al and equi pment
c. Est abl i sh per t i nent mi l est one dat es such as Pr e- War r ant y conf er ence
d. Pr ovi de Cont r act or f or mal appr oval t o st ar t wor k ( Not i ce t o Pr oceed)
e. Pr ovi de Gover nment f ur ni shed sour ce dr awi ngs & submi t t al r egi st er t o Cont r act or f or f ut ur e as bui l t s
1. 4. 2 Wor k Schedul e
Wor ki ng hour s f or t he Cont r act or wi l l nor mal l y be bet ween t he hour s of 7: 30 A. M. and 6: 00 P. M. , Monday t hr u Thur sday, excl udi ng Fr i days. Sat ur days, Sundays and f eder al hol i days. I f t he Cont r act or desi r es t o wor k dur i ng per i ods ot her t han above, addi t i onal gover nment i nspect i on f or ces may be r equi r ed. Cont r act or must not i f y t he Cont r act i ng Of f i cer seven ( 7) days i n advance of hi s i nt ent i on t o wor k dur i ng ot her per i ods t o al l ow assi gnment of addi t i onal i nspect i on f or ces when t he Cont r act i ng Of f i cer det er mi nes t hat t hey ar e r easonabl y avai l abl e. I f such f or ce i s r easonabl y avai l abl e, t he Cont r act i ng Of f i cer may aut hor i ze t he Cont r act or t o per f or m wor k dur i ng per i ods ot her t han nor mal dut y hour s/ days sol el y f or t he benef i t of t he Cont r act or , and wi l l be deduct ed f r om t he f i nal payment of t he cont r act amount.
SECTI ON 01 11 00 Page 3
1. 5 OCCUPANCY OF PREMI SES
Bui l di ng( s) wi l l be occupi ed dur i ng per f or mance of wor k under t hi s Cont r act . Occupancy not i f i cat i ons wi l l be post ed i n a pr omi nent l ocat i on i n t he wor k ar ea.
1. 6 ON SI TE PERMI TS
The f ol l owi ng per mi t i s r equi r ed pr i or t o t he st ar t of any wor k:
a. AF For m 103; Excavat i on per mi t s or Wor k Cl ear ance Request : A mi ni mum of 10 wor ki ng days pr i or t o wor k st ar t i ng, t he Cont r act or shal l coor di nat e appr oval of AF For m 103 wi t h t he assi gned Gover nment I nspect or f r om Mi ssi l e Engi neer i ng ( CEM) . Base Ci v i l Engi neer i ng per sonnel wi l l pr ovi de t he Cont r act or wi t h al l necessar y r ecor d dr awi ngs l ocat i ng under gr ound ut i l i t i es and st r uct ur es. Base Ci v i l Engi neer i ng per sonnel wi l l physi cal l y l ocat e ut i l i t y l i nes and under gr ound st r uct ur es i n t he wor k ar ea. Once t he AF For m 103 i s appr oved, not i f y t he CEM Gover nment i nspect or 48 hour s pr i or t o excavat i on. Cont r act or i s r esponsi bl e f or ver i f y i ng ut i l i t y l ocat i ons as wel l as mai nt ai ni ng l ocat es. Cont r act or i s r esponsi bl e f or f ol l owi ng t he saf et y r equi r ement s i n 01 35 26 par agr aph 3. 4.
The f ol l owi ng per mi t i s onl y r equi r ed pr i or t o wel di ng, cut t i ng, or br azi ng:
a. AF For m 92, wel di ng per mi t s: When any wel di ng, cut t i ng, br azi ng, or use of any open f l ame devi ce i s used, t he Cont r act or shal l obt ai n a wel di ng per mi t f r om Mi not AFB Fi r e Depar t ment , 896 Fl i ght l i ne Dr i ve, pr i or t o such wor k. Cont r act or i s r esponsi bl e f or f ol l owi ng saf et y r equi r ement s i n 01 35 26, par agr aph 1. 8.
The f ol l owi ng r equest s ar e r equi r ed f or t hi s pr oj ect :
a. Ut i l i t y out age r equest s & ut i l i t y connect i on r equest s: Schedul e wor k t o mi ni mi ze out ages. Due t o t he oper at i onal r equi r ement s at MAF, ut i l i t y out ages must be kept t o f our hour bl ocks of t i mes and onl y dur i ng t he t i mes of 0700- 1100 and 1400- 1800. St r i c t schedul i ng i s necessar y f or ut i l i t y out ages and connect i ons r equi r ed dur i ng t he execut i on of wor k t hat af f ect exi st i ng syst ems. Schedul e out s i de t he r egul ar wor ki ng hour s or on weekends, as appr oved by t he Cont r act i ng Of f i cer . Schedul e ut i l i t y out ages and connect i ons t o mi ni mi ze di sr upt i ons t o t he Gover nment . No addi t i onal payment wi l l be pr ovi ded f or ut i l i t y out ages and connect i ons r equi r ed t o be per f or med out s i de t he r egul ar wor k hour s.
Submi t r equest s f or ut i l i t y out ages and connect i ons i n wr i t i ng t o t he Cont r act i ng Of f i cer f or appr oval at l east 10 wor ki ng days i n advance of t he t i me r equi r ed. I n each r equest , st at e t he syst em i nvol ved, ar ea i nvol ved, appr oxi mat e dur at i on of out age, and t he nat ur e of wor k involved.
1. 7 LOCATI ON OF UNDERGROUND UTI LI TI ES
Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h Mi not AFB' s r equi r ement s f or mai nt ai ni ng mar ked under gr ound ut i l i t i es and structures.
The Cont r act or shal l be r esponsi bl e f or mai nt ai ni ng t he l ocat es pr ovi ded by Base Ci v i l Engi neer i ng. Addi t i onal l y, t he Cont r act or shal l be r esponsi bl e f or r epai r of under gr ound i t ems, at no cost t o t he Gover nment , i f damaged
SECTI ON 01 11 00 Page 4 wi t hi n 10 f eet of t he l ocat i on shown on t he dr awi ngs
When di ggi ng wi t hi n 10 f eet of communi cat i on cabl es, excavat i on shal l be per f or med by hand unt i l t he cabl e i s exposed. A r epr esent at i ve f r om t he Base Communi cat i ons Squadr on must be pr esent . The cabl e r out e must be mar ked by Ai r For ce per sonnel pr i or t o excavat i on i n t he ar ea. The Cont r act or shal l be hel d r esponsi bl e f or any damage t o t he cabl e by excavat i on pr ocedur es. Once t he cabl e i s exposed, mechani cal excavat i on may be used i f t her e i s not a chance of damage occur r i ng t o t he cabl e
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -
SECTI ON 01 11 00 Page 5
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 14 00
WORK RESTRI CTI ONS
12/16
PART 1 GENERAL
1. 1 SUBMI TTALS
1. 2 CONTRACTOR ACCESS AND USE OF PREMI SES
1. 2. 1 Ent r y Aut hor i t y Li st ( EAL)
1. 2. 2 Per sonnel Ent r y Appr oval
1. 2. 3 Mi ssi l e Al er t Faci l i t y Regul at i ons
1. 2. 3. 1 Rest r i ct ed Ar ea
1. 2. 3. 2 Del ays
1. 2. 3. 3 Gover nment Pr oper t y
1. 2. 3. 4 Fi r e Regul at i ons
1. 2. 3. 5 Requi r ed Per mi t s
1. 2. 3. 6 Smoki ng
PART 2 PRODUCTS
PART 3 EXECUTI ON
SECTI ON 01 14 00 Page 1
SECTI ON 01 14 00
WORK RESTRI CTI ONS
12/16
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES
SD- 01 Pr econst r uct i on Submi t t al s Per sonnel Li st ; G Vehi c l e Li st ; G
1. 2 CONTRACTOR ACCESS AND USE OF PREMI SES
1. 2. 1 Ent r y Aut hor i t y Li st ( EAL)
I n or der t o gai n ent r y ont o a Mi ssi l e Al er t Faci l i t y , Cont r act or per sonnel and mi ssi on essent i al Cont r act or owned/ l eased vehi c l es must be l i s t ed on an Ent r y Aut hor i t y Li st ( EAL) , i dent i f i ed by Gover nment i nspect or / escor t per sonnel , and physi cal l y escor t ed on s i t e by aut hor i zed Gover nment i nspect or / per sonnel . No pr i vat el y owned vehi c l es ( POVs) wi l l be per mi t t ed on MAFs.
30 wor ki ng days pr i or t o t he i ni t i al commencement of wor k, t he Cont r act or must submi t t o t he Cont r act i ng Of f i cer a summar i zed l i s t of empl oyees al ong wi t h t wo f or ms of I D f or each empl oyee. One f or m of I D must be a l egi bl e phot ocopy of each empl oyee' s gover nment i ssued cr edent i al ed phot o I D, and t he ot her must be a Soci al Secur i t y Car d. The l i s t s and t wo f or ms of i dent i f i cat i on wi l l be used t o pr epar e t he Cont r act or ' s EAL r ef er enced above. For emen, Super vi sor s and Super i nt endent s must be i dent i f i ed as such on t he Cont r act or ' s l i s t of empl oyee i nf or mat i on.
The Cont r act or ' s summar i zed l i s t of empl oyee i nf or mat i on must show t he following:
a. Empl oyee' s f ul l name, exact l y as i t appear s on t he cr edent i al ed phot o I D submitted
b. Empl oyee' s dat e of bi r t h ( DOB)
c. Empl oyee' s f ul l Soci al Secur i t y Account Number ( SSAN)
d. Ci t i zenshi p
e. The Gover nment i ssui ng agency name and cont r ol number exact l y as i t appear s on t he cr edent i al ed I D
U. S. Gover nment i ssued cr edent i al I Ds must have a pi ct ur e of t he i ndi v i dual , i ndi v i dual ' s DOB and a cont r ol number . Accept abl e gover nment i ssued I Ds ar e U. S. Feder al passpor t or passpor t car d, st at e, commonweal t h, t er r i t or y, Di st r i c t of Col umbi a dr i ver ' s l i cense, U. S. Sover ei gn i nsul ar ar ea or t r i bal or gani zat i on r ecogni zed by t he U. S. Depar t ment of t he
SECTI ON 01 14 00 Page 2
I nt er i or car ds.
I n addi t i on t o t he Empl oyee Li st , t he Cont r act or shal l concur r ent l y f ur ni sh a l i s t of al l Cont r act or owned/ l eased/ r ent ed vehi c l es and equi pment whi ch wi l l be dr i ven on s i t e ( vs bei ng haul ed on a t r ai l er ) as r equi r ed t o compl et e an EAL. Vehi c l e i nf or mat i on r equi r ed i s as f ol l ows:
a. Vehi c l e Make
b. Vehi c l e Model
c. Vehi c l e Pr i mar y Col or
d. Li cense Pl at e Number and St at e of I ssuance
Al l equi pment ( i . e. ski t - st eer s, Bobcat s, f or k l i f t s , l oader s/ backhoes/ l i f t s , t r encher s, ai r compr essor s, wel der s, et c. ) , mat er i al s, and hand- car r i ed i t ems ( i . e. power t ool s and hand t ool s) br ought out t o t he s i t e on a t r ai l er ar e not r equi r ed t o be l i s t ed on t he EAL.
MI SSI LE ENGI NEERI NG FLI GHT PERSONNEL RECOMMENDS THE CONTRACTOR PROVI DES
PERSONNEL LI ST AND VEHI CLE LI ST EAL REQUI RED I NFORMATI ON AT THE TI ME OF THE
PRE CONSTRUCTI ON MEETI NG AS I T I S THE BI GGEST TI ME RESTRI CTED SCHEDULI NG
FACTOR.
1. 2. 2 Per sonnel Ent r y Appr oval
Upon ar r i val at t he MAF, Cont r act or per sonnel wi l l cont act t he Fl i ght Secur i t y Cont r ol l er ( FSC) usi ng t he gat e i nt er com t el ephone and i nf or m t he FSC of t hei r pr esence at t he secur i t y gat e. Cont r act or per sonnel must r emai n out s i de of t he secur i t y f ence and i n or near t hei r vehi c l es unt i l t he ar r i val of t he Gover nment i nspect or / escor t .
The Gover nment i nspect or / escor t wi l l i dent i f y and sear ch al l Cont r act or per sonnel and vehi c l es. Al l Cont r act or per sonnel wi l l pr ovi de t he Gover nment i nspect or / escor t wi t h a cr edent i al ed I D ( as l i s t ed above) The I D must be t he same i dent i f i cat i on whi ch was used t o gener at e t he EAL. The Cont r act or ' s vehi c l es wi l l be checked and possi bl y sear ched pr i or t o s i t e ent r y. Cont r act or vehi c l es shal l be c l ear l y mar ked i dent i f y i ng each cont r act i ng f i r m.
Fai l ur e t o obt ai n ent r y appr oval wi l l not af f ect t he cont r act pr i ce, r egar dl ess of Gover nment , Cont r act or , or weat her r el at ed del ays, and pr oj ect t i me of compl et i on shal l not change.
I f Cont r act or per sonnel ar e not l i s t ed on t he EAL, or t hose who ar e l i s t ed cannot pr ovi de pr oper i dent i f i cat i on, t hey wi l l not be per mi t t ed on t he s i t e. Del ays caused by l ack of pr oper EAL dat a or pr oper i dent i f i cat i on shal l be at no cost t o t he Gover nment .
1. 2. 3 Mi ssi l e Al er t Faci l i t y Regul at i ons
1. 2. 3. 1 Rest r i ct ed Ar ea
The wor k t o be per f or med i s i n a r est r i c t ed ar ea. Ther ef or e, t he Cont r act or shal l conf or m t o al l r equi r ement s. Wor ker s wi l l be r equi r ed t o have an escor t wi t h t hem at al l t i mes. The Gover nment wi l l pr ovi de an i nspect or / escor t f or t he Cont r act or . The Gover nment escor t wi l l be r esponsi bl e f or on- si t e secur i t y. Dur i ng al l on- s i t e wor k, t he Cont r act or
SECTI ON 01 14 00 Page 3 per sonnel wi l l be accompani ed and cont i nuousl y moni t or ed by one Gover nment escor t . Fai l ur e t o r emai n wi t hi n t he ar ea bei ng moni t or ed i s a ser i ous br each of secur i t y and saf et y r egul at i ons. The Cont r act or wi l l t ake al l necessar y act i on t o ensur e compl i ance. The Cont r act i ng Of f i cer r eser ves t he r i ght t o deny ent r y t o/ or t ake act i on wi t h any Cont r act or per sonnel who r ef use t o conf or m t o secur i t y and/ or saf et y r egul at i ons. Del ays r esul t i ng f r om such ent r y deni al shal l not r esul t i n any cost t o t he Gover nment or schedul e del ay.
For ei t her t he s i t e v i s i t , del i ver y of commodi t i es, or submi ssi on of pr oposal s, al l per sonnel r equest i ng access t o Mi not Ai r For ce Base must possess a val i d St at e or Gover nment pi ct ur e i dent i f i cat i on car d.
Fur t her mor e, i ndi v i dual s pr esent i ng i dent i f i cat i on car ds f r om a st at e t hat i s non- compl i ant wi t h t he REAL I D Act wi l l r equi r e addi t i onal document at i on t o gai n unescor t ed base access. Addi t i onal document at i on i ncl udes a val i d U. S. or f or ei gn gover nment i ssued passpor t , an empl oyment aut hor i zat i on document t hat cont ai ns a phot ogr aph, or i dent i f i cat i on car ds i ssued by f eder al st at e or l ocal gover nment agenci es t hat i ncl ude a phot o and bi ogr aphi c i nf or mat i on. Addi t i onal i nf or mat i on t o i ncl ude a f ul l l i s t of REAL I D Act compl i ant and non- compl ai nt st at es can be f ound at ht t ps: / / www. dhs. gov/ cur r ent - st at us- st at es- t er r i t or i es. Per sonnel r equest i ng vehi c l e access t o Mi not Ai r For ce Base must pr ovi de a val i d dr i ver ' s l i cense ( compl i ant wi t h REAL I D Act ) , cur r ent vehi c l e r egi st r at i on, and i nsur ance. "
1. 2. 3. 2 Del ays
The Cont r act or shal l al l ow 60 mi nut es each day f or per sonnel t o pr ocess on and of f t he wor k s i t e t hat wi l l not be consi der ed del ay t i me.
Al l s i t e access del ays must be r epor t ed by t he Cont r act or , i n wr i t i ng, t o t he Cont r act i ng Of f i cer wi t hi n 24 hour s of occur r ence. Al l Gover nment - caused wor k st oppages must be document ed by Gover nment per sonnel at t he t i me of occur r ence and r epor t ed by t he Cont r act or , i n wr i t i ng, t o t he Cont r act i ng Of f i cer wi t hi n 48 hour s of occur r ence.
1. 2. 3. 3 Gover nment Pr oper t y
The Cont r act or shal l pr ot ect al l Gover nment pr oper t y and compl y wi t h base physi cal secur i t y r egul at i ons and pr ocedur es.
1. 2. 3. 4 Fi r e Regul at i ons
Cont r act or shal l compl y wi t h Mi not AFB Regul at i on 92- 1, Fi r e Pr event i on and Protection.
1. 2. 3. 5 Requi r ed Per mi t s
As out l i ned i n Sect i on 01 11 00, Summar y of Wor k, t he Cont r act or must have an appr oved AF For m 103 pr i or t o st ar t i ng wor k at t he Mi ssi l e Al er t Faci l i t y . The Cont r act or must al so have an appr oved AF For m 92, i f wel di ng, br azi ng, or cut t i ng wi t h an open f l ame. The Gover nment i nspect or / escor t has t he aut hor i t y t o st op wor k i f t hese per mi t s ar e not pr oper l y obt ai ned by Cont r act or .
1. 2. 3. 6 Smoki ng
Smoki ng i s per mi t t ed i n desi gnat ed smoki ng ar eas onl y at Mi ssi l e Al er t Faci l i t i es. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed
SECTI ON 01 14 00 Page 4 t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer wi l l i dent i f y desi gnat ed smoki ng ar eas.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
SECTI ON 01 14 00 Page 5
SECTION 01 14 31 Page 1
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 01 14 31
ENVIRONMENTAL PROTECTION
PART 1 GENERAL
1.1 The Contractor shall perform all work in such manner as to minimize the polluting of air, water, or land, and shall, within reasonable limits, control noise and the disposal of solid waste materials, as well as other pollutants.
Recycling of construction and demolition debris is required when economically advantageous.
1.2 IMPLEMENTATION
Within 20 calendar days after Notice to Proceed and prior to commencement of the work at the site, the Contractor shall:
a. Detail their proposal for implementing the requirements for environmental pollution control specified herein. Submit in accordance with the submittal table.
1.3 SUBMITTALS
In accordance with Section 01300: Submittals, the Contractor shall submit the following.
1.3.1 Environmental Pollution Control Proposal, see paragraph 1.2.a
1.3.2 Preconstruction Survey, see paragraph 2.2
1.3.3 Hazardous Materials Authorization Information, see paragraph 2.9
1.3.4 Hazardous Material Usage Data (Monthly), see paragraph 2.9
1.3.5 Hazardous Materials Usage Data (Completion), see paragraph 2.9
1.3.6 C&D Report, see paragraph 2.11.3
1.3.7 Disposal Documents and Weight Tickets, see paragraph 2.13.4.5
1.3.8 Solid Waste Diversion Report, see paragraph 2.13.5
1.3.9 Waste Disposal Plan, see paragraph 2.13.6
2. EXECUTION:
2.1 REFERENCES
SECTION 01 14 31 Page 2
The publications listed below form a part of this specification to the extent referenced. All references listed in these specifications are intended to be the current version or edition, unless specifically identified otherwise. The Contractor shall conform to the Occupational Safety & Health Act, Environmental Protection Agency, North Dakota Department of Health, U.S. Air Force and all other Federal, State and Local environmental regulatory requirements.
29 CFR Occupational Safety and Health
Administration Code of Federal Regulations
40 CFR Environmental Protection Agency
Code of Federal Regulations
49 CFR Department of Transportation Code of Federal Regulations
EO 13423 Executive Order, Strengthening
Federal Environmental, Energy, and Transportation Management
EO 13514 Executive Order, Federal
Leadership in Environmental, Energy, and Economic Performance
EM 385-1-1 U.S. Army Corps of Engineers
Safety and Health Requirements Manual(1996)
WETLANDS U.S. Army Corps of Engineers
Wetlands Delineation Manual
AFI 32-7042 Air Force Instruction, Waste Management
AFI 32-7080 Air Force Instruction Pollution
Prevention
AFI 32-7086 Air Force Instruction, Hazardous Materials Management
Federal Acquisition Regulation (FAR)
2.2 PRECONSTRUCTION SURVEY
Prior to start of any on-site construction activities, the Contractor shall make a condition survey after which the Contractor shall record on a layout plan the condition of trees, shrubs and grassed areas immediately adjacent to the site of the work and adjacent to his assigned storage area
SECTION 01 14 31 Page 3 and access route as applicable. Submit in accordance with the submittal table.
2.3 PERMITS AND FEES
No separate payment will be made for work covered under this section. The Contractor shall be responsible for payment of fees associated with environmental permits, application, and/or notices obtained by the Contractor. All costs associated with this section shall be included in the contract price. The Contractor shall be responsible for payment of all fines/fees for violation or non-compliance with Federal, State, Regional and local laws and regulations.
2.3.1 Environmental Permits
The Contractor shall be responsible for obtaining and complying with all environmental permits and commitments required by Federal, State, regional, and local environmental laws and regulations.
2.4 PROTECTION OF LAND AREAS
Except for work areas, storage areas, or access routes specifically assigned for the use of the Contractor under this contract, the land areas outside the limits of permanent work performed under this contract shall be preserved in their present condition. The Contractor shall confine his construction activities to areas defined for work on the plans or specifically assigned for his use. Storage and related areas and access routes required temporarily by the Contractor in the performance of the work will be assigned by the Contracting Officer.
2.5 PROTECTION OF TREES AND SHRUBS
Except for trees or shrubs marked on the plans to be removed, the Contractor shall not deface, injure or destroy trees or shrubs, nor remove or cut them without special authority. No ropes, cables, or guys shall be fastened to or attached to any existing nearby trees for anchorage.
2.5.1 Tree Protective Structures
Where, in the opinion of the Contracting Officer, trees may possibly be defaced, bruised, injured, or otherwise damaged by the Contractor's equipment or by his other operations, he may direct the Contractor to provide temporary protection of such trees by placing boards, planks, or poles around them.
2.5.2 Restoration of Damaged Trees
Any tree scarred or damaged by the Contractor's equipment or operations shall be restored as nearly as possible to its original condition at the Contractor's expense. All scars made on trees not designated on the plans to be removed by construction operations shall be coated as soon as
SECTION 01 14 31 Page 4 possible with an approved tree wound dressing. Trees that are to remain, either within or outside established clearing limits, that are damaged by the Contractor so as to be beyond saving in the opinion of the Contracting Officer shall be immediately removed, if so directed, and replaced with a nursery-grown tree of the same species and size.
2.5.3 Herbicide
Herbicide use will be restricted to those areas directed to be sprayed by the Contracting Representative. Herbicide shall not be sprayed when wind speeds are greater than 10 mph or when there is likelihood of runoff due to rain. Herbicide shall contain a visible dye for tracking application area. Any application of herbicide at the Launch Facilities or Missile Alert Facilities must be applied by an applicator holding a ND Commercial Pesticide Applicators license. This license must include the category for Right-of-Way. Information on the Applicators license may be found at the NDSU Extension Service pesticide program website. Contractor shall submit proof of certification, catalog data and MSDS for any herbicide proposed prior to use on the site.
2.6 WATER RESOURCES AND STORM WATER DISCHARGE
The Contractor shall monitor construction activities to prevent pollution of surface and ground waters. Toxic or hazardous chemicals shall not be applied to soil or vegetation unless otherwise indicated. The Contractor shall monitor all water areas affected by construction activities.
2.6.1 NPDES Storm Water Program General Construction Permit
2.6.1.1 Construction Activity Less Than One Acre
For construction activity that disturbs less than 1 acre of land the Contractor shall implement Best Management Practices (BMPs) outlined in Section D, Erosion and Sediment Controls.
2.6.1.2 Wetlands, Erosion And Sediment Controls
2.6.1.2.1 Wetlands
The Contractor shall not enter, disturb, destroy, place fill into, or allow discharge of contaminants into any wetlands except as specifically authorized herein. The Contractor shall be responsible for the protection of wetlands on Minot AFB. Authorization to enter specific wetlands identified shall not relieve the Contractor from any obligation to protect other wetlands within, adjacent to, or in the vicinity of the construction site and associated boundaries. Maps showing locations of wetlands within Minot AFB can be obtained from 5 CES/CEIE.
2.6.1.2.2 Erosion and Sediment Controls
SECTION 01 14 31 Page 5
The Contractor shall be responsible for providing erosion and sediment control measures in accordance with Federal, State and local laws. This applies in all cases, even for construction activity that disturbs less than an acre of soil. The erosion and sediment controls selected and maintained by the Contractor shall be such that water quality standards are not violated as a result of the Contractor’s construction activities.
The area of bare soil exposed at any one time by construction operations should be kept to a minimum. The Contractor shall construct or install temporary and permanent erosion and sediment control best management practices (BMPs). BMPs may include, but not be limited to, vegetation cover, stream bank stabilization, slope stabilization, silt fences, construction of terraces, interceptor channels, sediment traps, inlet and outfall protection, diversion channels, and sedimentation basins. The Contractor’s best management practices shall also be in accordance with the Base National Pollutant Discharge Elimination System (NPDES) Storm Water Pollution Prevention Plan (SWPPP) which may be reviewed at the Minot AFB Environmental Management Office. Any temporary measures shall be removed after the area has been stabilized.
2.6.2 Discharging of Ground Water
For discharge of ground water, the Contractor shall obtain a State permit specific for pumping and discharging ground water prior to surface discharging in accordance with the requirements of the State Storm Water Discharges From Construction Sites permit. Refer to the NDDH web site.
2.6.3 Protection Of Water Resources
The Contractor shall control the disposal of fuels, oils, bitumen, calcium chloride, acids or harmful materials, both on and off the Government premises and shall comply with applicable federal, state, county and municipal laws concerning pollution of rivers, streams, and wetlands while performing work under this contract. Special measures shall be taken to prevent chemicals, fuels, oils, greases, bituminous materials, herbicides, and insecticides from entering public waters. Water used in on-site material processing, concrete curing, foundation and concrete cleanup, and other waste waters shall not be allowed to reenter a stream if an increase in the turbidity of the stream could result therefrom.
2.6.3.1 Dewatering Of Groundwater
For temporary dewatering of groundwater encountered during construction, the Contractor shall land apply all water generated at the locations indicated on drawings in accordance with Paragraph: LAND APPLICATION.
2.6.3.1.1 Land Application
Land application shall follow state requirements; however, no permit will be necessary. "Land application" implies that the Contractor shall discharge water at a rate which allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, SECTION 01 14 31 Page 6 defined drainage areas, or discharge into the "waters of the State" shall occur. The Contractor shall contact the State of North Dakota, Division of Water Quality and Permit Program, to discuss the water quality parameters for chemical contaminants (such as chlorine), oil, grease, and total suspended solids and shall ensure that all water intended for land application will meet the state requirements.
2.6.4 Erosion And Sediment Control
The Contractor shall be responsible for providing erosion and sediment control measures in accordance with local, state, and federal regulations.
The erosion and sediment controls selected and maintained by the Contractor shall be such that local, state, and federal water quality standards are not violated as a result of the Contractor's construction activities. The area of bare soil exposed at any one time by construction operations should be held to a minimum. For areas subject to erosion including, but not limited to, steep slopes, soils spreading areas, and stockpile areas, the Contractor shall disturb as little vegetation as possible, minimize the period of time that the soil is exposed, prevent surface water runoff from flowing across disturbed areas, stabilize disturbed soils as soon as possible, and provide adequate drainage for the increased runoff. Sedimentation/erosion control features may include, but not be limited to, vegetation cover, stream bank stabilization, slope stabilization construction of terraces, interceptor channels, sediment traps, inlet and outfall protection, diversion channels, and sedimentation basins. Runoff management practices should be employed in areas where the potential for storm water contamination exists that cannot be addressed by a prevention or source reduction measure. Runoff management procedures may include vegetative swales, reuse of collected storm water, infiltration devices, and detention/sedimentation basins. Any erosion and sediment control measures which are damaged or found to be ineffective shall be remedied by the Contractor at no additional cost to the Government. Any areas damaged by erosion shall be repaired by the Contractor at no additional cost to the Government.
2.6.5 Spill Prevention And Response Plan
The Contractor shall include a Spill Prevention and Response Plan in the Implementation Proposal. The plan shall describe the Contractor's procedures for preventing and responding to spills of hazardous materials.
2.7 AIR QUALITY
Equipment operation, activities, or processes performed by the Contractor shall be in accordance with all Federal and State air emission and performance laws and standards.
2.7.1 Burning of material is not allowed on site by the Contractor.
2.7.2 Particulates
SECTION 01 14 31 Page 7
The contractor shall not operate a construction site or demolition project unless reasonable precautions are taken to control emissions of particulate matter. Such emissions of airborne particulate matter shall not exceed 20% opacity as defined in 40 CFR 60 Appendix A.
2.7.3 Sound Intrusions
The Contractor shall keep construction activities under surveillance and control to minimize environment damage by noise. The Contractor shall comply with the provisions of the State of North Dakota rules.
2.7.4 Ozone Depleting Chemicals (ODCs)
The contractor shall ensure activities performed under this contract are in compliance with the Air Force Policy on ODCs. The contractor shall not purchase, use, or specify the use of any Class I ODC in the production, design, or maintenance of the end item. Class II ODCs may be used or specified only with the written approval of the Contracting Officer.
2.7.5 Dust Control
The Contractor shall maintain all excavations, embankments, stockpiles, access roads, plant sites, waste areas, borrow areas, and all other work areas free from excess dust to such reasonable degree as to avoid causing a hazard or nuisance. Temporary methods consisting of sprinkling, chemical treatment, light bituminous treatment or similar methods will be permitted to control dust. Dust control shall be performed as the work proceeds and whenever a dust nuisance or hazard occurs.
2.8 TOXICS
The Contractor is responsible for ensuring that no employee is exposed to toxic materials like airborne asbestos, lead from lead base paint or polychlorinated biphenyls (PCB’s).
2.9 HAZARDOUS MATERIALS (HAZMAT)
Contractors must obtain an authorization prior to bringing any hazardous materials (Federal Standard 313) on Air Force installations. Contractors must submit all required documentation including appropriate Hazardous Materials Authorization Information Form, Material Safety Data Sheet (MSDS) and projected usage information to 5 CES/CEIE through the Contracting Officer at least 15 days before the HAZMAT is brought onto Minot AFB and facilities within the Missile Field. This review is to ensure that no Air Force restricted hazardous materials are being proposed for use. The contractor will comply with Federal Acquisition Regulation (FAR) 52.223-5. Following contract award, the contractor shall provide the name and an initial volume of each hazardous material being used on Minot AFB and its storage location. Contractors shall provide 5 CES/CEIE with specific usage data on a monthly basis and a finalized usage report at project completion, as determined by the Installation Hazardous Materials
SECTION 01 14 31 Page 8
Management Process (IHMMP) Team. Reports must include: name of material, manufacturer, NSN/Part #, container size, volume start balance, volume of material used in reporting period, storage location if it’s changed since initial reporting and the name and phone number of the reporting official.
Reports shall be on letterhead paper, dated, and signed by the reporting official. Prime contractors shall be responsible for reporting hazardous material used by subcontractors. FAR 52.223-3 provides guidance on Hazardous Material Identification and Material Safety Data.
2.9.1 Emergency Planning And Community Right-To-Know ACT (EPRCRA)
Contractors shall comply with the reporting provisions of EPCRA Sections 311, 312 and 313 during the life of the contract. Contractors shall provide a list of all hazardous materials procured, used and stored along with a current MSDS for each item, an initial inventory and a monthly or quarterly inventory. Contractors shall provide the information to 5 CES/CEIE through the Contracting Officer. The inventory reporting period shall be determined by the installation Hazardous Materials Management Process Team.
2.9.2 Material Safety Data Sheets (MSDSs)
The contractor shall maintain MSDSs for all hazardous materials used on base and the MSDSs shall be on file on site at the construction site office at all times. The contractor shall send 5 CES/CEIE via the Contracting Officer a MSDS for any new material not initially identified, the volume being brought on base, and its storage location. The MSDS shall be submitted to 5 CES/CEIE in accordance with Section 01300: Submittals.
2.9.3 HAZMAT Quantities
Prior to completion of the contract, the contractor shall provide a finalized report of the actual quantities used during the contract, and remove all excess materials. Contractors may use excess materials on other projects and shall be responsible for proper disposal of any materials removed from Minot AFB.
2.9.4 HAZMAT Storage
All hazardous materials used by the contractor on Minot AFB property shall be stored properly in segregated areas in accordance with all regulatory and MAFB Fire Department requirements. Storage requirements shall include, but not be limited to:
a. Containers must be securely closed when not in use.
b. Containers must be labeled with appropriate warning labels.
c. Storage area must be posted with hazardous signs as required.
d. Storage must have secondary containment.
SECTION 01 14 31 Page 9
e. Contractor shall check at least weekly for leaks and spills and maintain a log of the inspections.
f. Materials shall be stored in one central location.
g. Flammable items must be stored in an approved flammable storage locker and grounded as needed.
h. All fuel storage tanks and containers must have secondary containment.
2.9.5 Fuel and Lubricants
Storage, fueling and lubrication of equipment and motor vehicles shall be conducted in a manner that affords the maximum protection against spill and evaporation. Fuel, lubricants and oil shall be managed and stored in accordance with all Federal, State, and local laws and regulations. Used lubricants and used oil to be discarded shall be stored in marked corrosion-resistant containers and recycled or disposed in accordance with 40 CFR 279, State, and local laws and regulations. There shall be no storage of fuel on the project site. Fuel must be brought to the project site each day that work is performed.
2.10 GREEN PROCUREMENT
In compliance with the Affirmative Procurement requirements of Section 6002 of RCRA, Executive Orders 13423 and 13514, and the Federal Acquisition Regulations (FAR), the Government requires the use of recycled and recovered materials, and products identified in the Environmental Protection Agency’s Comprehensive Procurement Guidelines as much as practical.
a. These materials and products must meet the requirements of the specifications, must not delay the progress of the work, and must not be cost prohibitive.
b. EPA guideline items are seen as the minimum that should be considered when evaluating recycled/reuse materials. Other materials and products not listed, but commonly used in industry outside of the government, should also be considered. FAR 52.211-5 provides guidance on recycled material usage versus virgin material usage.
c. Material and product submittals for all recycled-content items required will clearly show the recycled/recovered content for each material used, type of material, and total weight of material used.
d. Any decision not to acquire guideline items as required in the contract must be submitted in writing and approved by the Contracting Officer and 5 CES/CEIE. All purchases of guideline items must be verified by the Contracting Officer before contract closure.
SECTION 01 14 31 Page 10
e. Paper products such as government documents, agreements, contracts, etc. shall be printed on paper containing at least 30% post consumer materials per FAR 52.204-4. The use of recycled or bio-based containing products is strongly encouraged.
f. All contractually required documents and reports produced by or for the Air Force longer than two pages shall be double-sided per FAR 52.204-4.
2.11 QUALIFIED RECYCLING PROGRAM (QRP)
In compliance with 10 U.S.C. §2577 and DoD Instruction 4715.4, Pollution Prevention, 6 Jul 1998, it is the intention of the Air Force to recycle at its installations.
2.11.1 Recycling/Reuse of Excess Materials and Construction and Demolition (C&D) Debris
The contractor shall reuse/recycle excess materials and C&D debris to the maximum extent possible. C&D debris are those excess/residue materials resulting from construction or demolition activity that would normally be discarded to a landfill. C&D debris includes, but is not limited to soil, rock, vegetation, and concrete, if determined to be economical. All C&D debris resulting from demolition shall become the property of the contractor unless specified otherwise or as determined by the contracting officer.
2.11.2 Reporting Tonnage of C&D Debris
Contractor shall track by month and report the tonnage of C&D debris in two categories:
a. Tons of C&D debris that is or will be recycled or reused
b. Tons of C&D that is disposed in a landfill.
2.11.3 The C&D Debris Recycled/Disposed Tonnage Report
Report shall consist of a written memo with the tonnage of each category (recycled and disposed tonnage) submitted to 5 CES/CEIE through the contracting officer. Submit C&D debris recycled and disposed tonnage report monthly until the project is completed.
2.11.4 Contractor Generated Rubbish
Materials not to be returned to the Government and all contractor generated rubbish, if not recycled, shall be disposed of by the contractor off-base at his own expense, and in compliance with applicable environmental codes and regulations of governing authorities.
2.12 HAZARDOUS WASTE PROCEDURES
SECTION 01 14 31 Page 11
All hazardous waste must be managed, handled, and disposed of in accordance with 40 Code of Federal Regulations (40 CFR) Parts 260-299 and the Minot AFB Hazardous Waste Management Plan.
2.12.1 Waste Characterization, Containerization and Disposal
The contractor is responsible for the proper characterization, containerization, and disposal of all wastes generated from his operations, including RCRA hazardous, state-regulated, and spill cleanup wastes.
2.12.2 Waste Disposal Updates
Contractors shall coordinate with 5 CES/CEIE for the disposal of generated wastes at least 14 days before the project begins, and provide updates at least once per month throughout the entire project. Updates shall include the volume and type of waste generated, and storage location.
2.12.3 Solid Waste
The contractor shall dispose of/recycle solid wastes (i.e. non-hazardous) through local disposal or recycling facilities. No liquid wastes of any kind may be put into installation garbage collection containers, or poured into drains, sinks, toilets, or on the ground. Revenue received by the contractor from recycled solid wastes shall offset contract costs. The contractor shall coordinate disposal of RCRA hazardous, state-regulated and liquid wastes from government materials through 5 CES/CEIE via the Contracting Officer. The contractor shall be responsible for disposal of RCRA hazardous, state-regulated, liquid wastes and spill-cleanup wastes generated by contractor processes and from contractor-purchased materials.
The contractor shall characterize, containerize, handle, manage and dispose of wastes in accordance with 40 CFR 260-299 and the installation Hazardous Waste Management Plan. The contractor is responsible for provided appropriate waste collection containers.
2.12.4 Hazardous Waste Storage
Contractors storing hazardous waste on site for more than 24 hours must follow the Minot AFB Hazardous Waste Management Plan. At a minimum, the contractor must establish a secure accumulation point, and appoint and train Hazardous Waste (HW) Managers. If more than 55 gallons of hazardous waste or more than 1 quart of acutely hazardous waste is generated then the contractor must obtain approval for and establish a 90 day accumulation site. The contractor shall coordinate accumulation storage areas with 5 CES/CEIE via the Contracting Officer at least 2 weeks prior to establishing the storage area.
2.12.5 Fines and Penalties
SECTION 01 14 31 Page 12
The contractor is responsible for all fines and penalties, which may stem from an EPA or State of North Dakota Department of Health hazardous waste inspection of his operation.
2.13 SOLID WASTES
The contractor is responsible for handling and disposal of all solid waste generated at the job site including laboratory testing and any documentation submittals required by the landfill owner.
2.13.1 Solid Waste Handling
Solid wastes (excluding clearing debris) shall be placed in containers that are emptied on a regular schedule. Handling, storage, and disposal shall be conducted to prevent contamination. Segregation measures shall be employed so that no hazardous or toxic waste will become co-mingled with solid waste. The Contractor shall transport solid waste off Government property and dispose of it in compliance with Federal, State, and local requirements for solid waste disposal. A Subtitle D RCRA permitted landfill shall be the minimum acceptable off-site solid waste disposal option. The Contractor shall verify that the selected transporters and disposal facilities have the necessary permits and licenses to operate.
2.13.2 Solid Waste Recycling
Contractors are required to recycle solid waste generated from their work, including aluminum and other scrap metals, concrete, cardboard, newspaper and office paper. Documentation of recycled solid waste shall be submitted to 5 CES/CEIE via the Contracting Officer on a regular basis as determined by the installation Waste Program Manager. Recycling information shall include the volume and types of recycled materials, and name, phone number, and address of the recycling center. The information shall be written on the contractor’s letterhead paper and be signed by the project manager or other legal representative of the contractor.
2.13.3 Special Handling Requirements
The Contractor shall make all arrangements for disposal of any wastes including wastes requiring special handling such as asbestos and lead containing materials, rubble, sludge or non-hazardous chemical wastes.
2.13.4 Solid Waste Disposal Facilities
All non-hazardous wastes shall be properly disposed of through a licensed landfill or recycling center. North Dakota Department of Health written approval is required for any non-inert materials such as asphalt containing materials, asphalt roofing materials, steel containing materials, etc that are to be disposed of in a Class III landfill site. No written approval is required if a Class II or Class IV landfill site is used for disposal of these non-inert materials.
SECTION 01 14 31 Page 13
2.13.4.1 Landfills
Class IV landfills accept Group VI wastes which include construction and demolition waste such as waste building materials, packaging, and rubble resulting from construction, remodeling, repair, and demolition operations on pavements (including asphalt waste), houses, commercial buildings, and other structures.
2.13.4.2 Landfill Exclusions
Regulated hazardous wastes are excluded from all Class II, III and IV landfill sites. Class II landfill sites can receive any wastes acceptable at Class III and Class IV landfill sites in addition to municipal and household solid wastes such as garbage and putrescible organic materials.
2.13.4.3 Minot AFB Landfill Site
No landfill site is available on site or on Minot AFB. Demolition rubble shall not be buried or placed upon the land anywhere on base or at the work site.
2.13.4.4 Improperly Disposed of Waste
The cost for cleanup of improperly disposed wastes and/or the costs for removals of improperly placed hazardous waste materials shall be the responsibility of the contractor.
2.13.4.5 Disposal Documents
Copies of all disposal documents and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .