Questions_and_Answers_Final.pdf
PDF 3 MB Posted
- Attached to
- AFMAO B116 Kitchen and Bathroom Renovation Federal contract opportunity
- Solicitation number
- FA449719RA031
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW_-_B116_Rpr_Kitch__ADA_Bathrooms_28_May_2019_V3.pdf | ||
| SOW_-_B116_Rpr_Kitch__ADA_Bathrooms_15_April_19_Updated_V2.pdf | ||
| Solicitation_-_FA449719RA031.pdf | ||
| Wage_Determination_Building.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Solicitation Questions & Answers 18 April 2019 Page of Summary of Site Visit (if applicable) Question Answer 9.0.0.2.20120627.2.874785
| Security_Markings: |
| CurrentPage: |
| PageCount: |
| Program-Title: Project Name AFMAO B116 Bathroom and Kitchen Renovation |
| Contracting-Office: 436 CONS/PKA |
| Contracting-Office: FA449719RA031 |
| Basic_Quantity: Project No. 1080033 |
| TextField1: |
| Add: |
| Cell1: 1. Is there any requirements for dust barriers or adhesive walk off mats while working in occupied areas? |
| Cell1: 2. Is there any know existing asbestos or lead based paint construction materials? |
| Cell1: 3. A 90% Design submittal is listed in the table of deliverables but not the design requirements; will this be a required submission for the project? |
| Cell1: 4. Will the loading dock or warehouse space be available for a laydown area? |
| Cell1: 5. Will this project require a full time superintendent and quality control manager? |
| Cell1: 6. Can DAFB provide the existing as-built drawings, specifically the existing plumbing drawings? |
| Cell1: 7. Are drawings indicating existing conditions including plumbing available in PDF and/or AutoCAD format? |
| Cell1: 8. Confirm the finish grade of new plumbing fixtures are to meet UFGS, and not match existing. |
| Cell1: 9a. Range Hood: |
a. Existing hood is a residential grade. Confirm if a commercial grade hood is required with ANSUL or equal fire suppression system with exhaust and fan to exterior to comply with NFPA 96, to include monitoring by the fire alarm system.
Cell1: 9b. Range Hood:
b. Is grease duct required for kitchen hood system, including modification to the sprinkler per NFPA 13?
Cell1: 9c. Range Hood:
c. Is make-up air required for kitchen hood, or can the space be pulled negative to adjacent spaces during operation?
Cell1: 9d. Range Hood:
d. Are stamped and signed plans for review by CE required from a registered fire protection engineer?
| Cell1: 10. An existing water filtration system exists on the existing icemaker and sink. Confirm if these are to be retained or replaced. If replaced, provide specification for filtration system requested. |
| Cell1: 11. Are drawings indicating existing conditions including plumbing available in PDF and/or AutoCAD format? |
| Cell1: 12. Is the 15-day design duration negotiable? This is small window for the required design deliverables. |
| Cell1: 13. Can the basis of design be waived for this project? |
| Cell1: 14. What is the purpose, to specify stainless steel cabinets and an ADA compliant lavatory with new mirror? |
| Cell1: 15. Adding the design periods together, you get 90 days. This will only leave 15 days for work to be completed. We know the POP is negotiable, what should we bid based on for the POP? |
| Cell1: 16. What level of clean do we have to leave the kitchen area? Is a typical construction clean acceptable? |
| Cell1: 17. Are inspections by the Department of Health required for the kitchen area? |
| Cell3: Dust barriers and adhesive walk off mats are requested between work spaces and common areas. |
| Cell3: There are not any known asbestos or lead based construction materials. |
| Cell3: A 90% design submittal will not be a required submission for this project. |
| Cell3: 436 CES/CENMP will work with POCs from AFMAO to determine laydown area. |
| Cell3: The prime contractor should have a full time superintendent. The superintendent can also fill the QCM role on this project. |
| Cell3: Yes. 436 CES/CENMP can provide the existing as-built drawings requested. |
| Cell3: Yes. PDF drawings are existing and available. |
| Cell3: Finish grade should meet UFGS and not match existing. |
| Cell3: Commercial grade hood with ANSUL or equal fire suppression system with exhaust and fan to exterior to comply with NFPA 96, to include monitoring by the fire alarm system is not required. Range hood similar to existing residential grade hood will suffice. |
| Cell3: Grease duct for kitchen hood system, including modification to the sprinkler per NFPA 13 is not required. |
| Cell3: Make-up air is not required. Space can be pulled negative to adjacent spaces during operation. |
| Cell3: Stamped and signed plans from a registered fire protection engineer are not required. |
| Cell3: Existing filtration system on icemaker and sink should be retained and not replaced. |
| Cell3: Yes. PDF drawings are existing and available. |
| Cell3: The 15-day design duration is the standard for this deliverable. |
| Cell3: No. The user specifically requested the items for this project, therefore the basis of design should not be waived. |
| Cell3: Stainless steel cabinets were requested by the user. ADA compliant lavatory and new mirror were requested because bathrooms are not currently ADA accessible. |
| Cell3: 90% design submittal drawings will not be required for this project allowing for an additional 30 days. The bid for the POP should be based on the design period plus the additional time requested for construction and closeout. |
| Cell3: Daily housekeeping is expected. Kitchen area will require hygienic cleaning to healthy standards once complete. |
| Cell3: The kitchen area will be inspected by the DAFB Bio-Environmental Engineering Flight to ensure it is ready for use. |
| Date: 06 Jun 2019 |
| Name: |
| Signature: |
| TextFieldStyle1: |
| TextFieldStyle2: |
| TextFieldStyle3: |
| TextFieldStyle4: |
| TextFieldStyle5: |
| TextFieldStyle6: |
| TextFieldStyle7: |
| TextFieldStyle8: |
| TextFieldStyle9: |
| TextFieldStyle10: |
| TextFieldStyle11: |
| TextFieldStyle12: |
| TextFieldStyle13: |
| TextFieldStyle14: |
| TextFieldStyle15: |
| TextFieldStyle16: |
| TextFieldStyle17: |
| TextFieldStyle18: |
| TextFieldStyle19: |
| TextFieldStyle20: |
| TextFieldStyle21: |
| TextFieldStyle22: |
| TextFieldStyle23: |
| TextFieldStyle24: |
| TextFieldStyle25: |
| TextFieldStyle26: |
| TextFieldStyle27: |
| TextFieldStyle28: |
| TextFieldStyle29: |
| TextFieldStyle30: |
File details come from the government source that posted it.