PWS_PMEL-CTK_Cage.pdf

PDF 143 KB Posted

Attached to
Composit Tool Kit (CTK) Shelving for PMEL Federal contract opportunity
Solicitation number
FA4497-15-R-PMEL
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to Composit Tool Kit (CTK) Shelving for PMEL, newest first.
File Type Posted
Site_Visit_Minutes_-_PMEL_CTK_Shelving_-_SIGNED.pdf PDF
PMEL_CTK_Cage_Combo_Revised.pdf PDF
Locker_Diagram.pptx PPTX presentation

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

Procurement and Installation of Cage, Shelving/Equipment, and Relocation of Lockers for Support

Flight

1. The scope of work for this project is as follows in the Statement of Work (SOW)

a. The contractor shall provide labor to disassemble and relocate existing lockers from mezzanine in building 793, and reassembled on lower floor of building 793 and in the second floor office space in building 792 (See Attachment).

b. The contractor shall provide materials and labor to disassemble existing cage materials to modify the cage area of the nose dock in building 793 to capture entire area under the mezzanine; the current wire cage 10’ door will be reused and a new standard 36” door will be added for personnel access, and both doors will need to be securable by cypher locks that can be operated from both sides.

c. The contractor shall provide materials for shelving to replace existing shelving in cage areas in building 792 and 793. No assembly required for shelving.

i. The shelving must have weight capacity requirements clearly marked.

ii. The shelving must be able to be relocated by use of a pallet jack or forklift.

iii. The shelving must be able to be located over 18” away from any existing fire suppression water system distributing caps (It can’t be so tall that it interferes with AFOSH requirements).

iv. Specifications:

1. Building 792 Shelving:

a. Size: 2 each 24”D x 96”H x 156”W

1 each 48”D x 84”H x 84”W

b. Levels: 7 per section

c. Decking: Wire decks 2x2 grid

d. Color: Dark Blue

2. Building 793 Shelving:

a. Size: 2 each 24”D x 84”H x 96”W

4 each 24”D x 84”H x 48”W

2 each 24”D x 84”H x 72”W

9 each 36”D x 84”H x 96”W

2 each 48”D x 84”H x 96”W

b. Levels: 4 per section

c. Decks: Wire all levels 2x2 grid

d. Color: Green Uprights, Orange Crossbars (Standard Colors)

3. Building 794 Totes:

a. Totes: 40 each

i. Size: 40”D x 18”W x 12”H

ii. Bin Capacity: 300lbs

iii. Color: Blue

40 each

iv. Size: 40”D x 11”W x 10”H

v. Bin Capacity 100lbs

vi. Color: Gray

4. Notes:

a. Top and bottom beams of shelving are to be bolted/welded

b. Weight capacity stickers for all shelving provide weight restrictions.

d. The contractor shall provide materials and labor to install an omni-roller system for rollerized pallet storage on top of the existing mezzanine in building 793.

i. Size: 59’ long, 3 sections of conveyor

ii. Guide Rails: 6” x 4” x 1/2” angle, flared on one end, color safety yellow

iii. Stops: 3 permanent, 7 moveable, color safety yellow

iv. Deflectors: 3 tine deflectors, color red

v. Mezzanine Gate: 2 each 10’ openings, built to meet OSHA standards, recommend sliding gate, and painted safety yellow color

e. The contractor will provide drawings to compare to our current floor plan.

2. General Information

a. Hours of Operation. The hours of operation are from 7:00AM to 7:00PM, Monday through Friday. The contractor is not required to provide service except for emergencies on the following days: New Year’s Day, Martin Luther King’s Birthday, Washington’s

Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day.

b. Security Requirements. In performing any work under this contract on premises which are under the direct control of the Government, the Contractor shall conform to all safety rules and requirements prescribed in Air Force Pamphlet 91-210, Contract Safety and

Public Law 91-596, The Occupational Safety and Health Act of 1970. Effective on the date of this contract, the contractor shall take such additional precautions as the

Contracting Officer may reasonably require for security, safety, traffic fire, personnel clearances and accident prevention purposes. The Contractor agrees to take all reasonable steps and precautions to prevent accidents and preserve the life and health of the Contractor, Government Property and Government personnel performing or in any way coming in contact with the performance of this contract on such premises. These requirements are additional to and do not replace the standards promulgated by the

Department of Labor under the Occupational Safety and Health (OSHA) Act. In the event of a conflict between the OSHA Standards and these requirements, the most stringent shall apply. Any violation of such rules and requirements, unless promptly corrected, as directed by the Contracting Officer, may be considered grounds for termination of this contract in accordance with the default provisions herof.

c. Security

i. All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the governmental installation shall abide by all security instructions and directives of Dover AFB. Employees are responsible for safeguarding all government property provided for contractor use.

ii. At the close for each work period, government facilities, equipment and materials shall be secured, lights, heat and water turned off and all doors and window secured

iii. The contractor and as applicable, subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general wellbeing or operational mission of the installation and its population, nor shall the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified during the Criminal Background Check (CBI)

iv. Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Employees and subcontractors later found to be undocumented or illegal aliens will be remanded to the proper authorities

v. The contractor shall not be entitled to any compensation for delays or expenses associated with complying with the provisions of this clause. Furthermore, nothing in this clause shall excuse the contractor from proceeding with the contract as required.

vi. All contractors and subcontractors when working in a Controlled, Restricted or other sensitive areas must be escorted at all times. The military agency or unit responsible for the project or work is responsible for providing the escorts. The

Contractor shall follow existing procedures and instructions for obtaining entrance to restricted or controlled areas.

3. SPECIAL QUALIFICATIONS. Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements in inspection of equipment’s. Proof of certification must be submitted to the Contracting Officer within 5 working days of signing the contract

4. RECORDS MANAGEMENT. The contractor understands that when creating, handling and maintaining records for the Air Force, either electronic or paper, you must meet the requirements established in AFRIMS Records Disposition Schedule (RDS), AFI 33-322, Records Manage

Program, AFI 33-364, Records Disposition Procedures and Responsibilities, and AFM 33-363, Management of Records. In order to meet the requirement established IAW the above mentioned regulations contact the Base Records Management Office (436 CS/SCXK, Bldg 919) at extension

3642 for guidance and to schedule records management training.

5. CONTRACTOR BADGE POLICY:

a. All requests for contractor badges will be submitted through the Base Contracting

Squadron Office and/or the requesting agencies base point of contact. The Contracting

Squadron Office or base point of contact will then fill out an Operational Risk

Management Assessment Form (ORM) for the requesting agency and submit it to the

Pass and Registrations section for approval IAW DAFBI 31-101. As a minimum the

ORM will be submitted 72-hours prior to the requested date of employment.

b. All contactor employees who’ll be granted unescorted access to the installation are required to consent to a Criminal Background Investigation (CBI) prior to being granted entry to the installation. Continued employment is contingent upon successful completion and favorable reporting of the criminal background check

c. Contractor badges will be issued for a maximum period of one year. Prior to reissuing new badges, all old badges must be returned to Pass and Registration for destruction.

Also before a new badge will be issued an ORM must be resubmitted to the Pass and

Registration section for approval again. In the event a badge is lost or stolen, the badge holder must accomplish the Loss/Theft of Identification Worksheet and provide it to his/her supervisor. The supervisor of the contractor will investigate the loss and report in writing the circumstances in which the badge was lost to the 436th Contracting Squadron and 436th Security Forces Squadron and submit a new request for badge before a new badge can be reissued

d. Base Contracting Office or base point of contact will immediately notify Security Forces, Pass and Registration when a contractor’s employment has been terminated. The Site

Supervisors are responsible for notifying and returning the contractor’s badge to Pass and

Registration when this occurs. At no time will a contractor contact Security Forces directly regarding badge denial; they need to contact the Contracting Office

6. INSTALLATION ACCESS:

a. The contractor shall obtain personal contractor identification badge for all employees and vehicle passes for all contractor and personal vehicles requiring entry onto Dover AFB from Pass and Registration, for the duration of the contract. Employees are only permitted to enter the installation during the date and time periods indicted on their contractor badge.

b. Vehicle registration, proof of insurance and a valid driver’s license must be presented for all vehicles while operating on the installation. All vehicles entering the installation or sensitive areas are subject to search. Any refusal or non-consent by an employee will result in termination of their base access and immediate confiscation of this access badge.

c. During Force Protection Condition (FPCON) Normal and Alpha, personnel without base issued badges must be sponsored onto the installation

d. During FPCON Bravo, Charlie and Delta, personnel without base issued identification shall be physically escorted onto the installation

e. During Higher FPCONs (Charlie and Delta) the base will curtail non-essential operations/functions; access by Non-Essential Contractors will be suspended as the direction of the Installation Commander

7. FLIGHTLINE DRIVING: Contractors will have to adhere to the provisions in DAFBI 13-202 if operating on the airfield.

File details come from the government source that posted it. Updated .