Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| questions_and_answers.docx | DOCX document | |
| Amendment_0002.pdf | ||
| Amendment_0001.docx | DOCX document | |
| Tab_3_-_Submittal_Requirements.pdf | ||
| Tab_2_-_Project_Drawings_MQNA_16-1008.pdf | ||
| 16T0006.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PURCHASE ORDER
SPECIFICATIONS
FOR
MAINTAIN RESTRIPE ALL BASE
CROSWALKS
MQNA 16-1008
USAFE
Lajes Field, Azores, Portugal 65th Civil Engineer Squadron
APO AE 09720
Maintain Restripe All Base Crosswalks MQNA 16-1008
TABLE OF CONTENTS - SPECIFICATIONS
DIVISION 01 – GENERAL REQUIREMENTS PAGES
01 11 00 SUMMARY OF WORK 1 – 6
01 33 00 SUBMITTAL PROCEDURES 1 – 9
01 35 26 GOVERNMENT SAFETY REQUIREMENTS 1 – 13
01 57 50 ENVIRONMENTAL COMPLIANCE AND
PROTECTION 1 – 13
01 78 00 CLOSEOUT SUBMITTALS 1 – 4
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 17 24 PAVEMENT MARKING 1 – 13
01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 - GENERAL
1.1 SCOPE: The contractor's scope of work includes supplying all plant, labor, equipment, supervision and specified material to perform all operations required to complete all work as specified in the contract. Work shall be performed as described in this Statement of Work (SOW) and Project Drawings. No more than four (4) crosswalks should be done at the same time and all of them must be paint father the old paint be removed.
1.2 LOCATION: The work will be at, Lajes Field, Azores, Portugal, base wide.
1.3 PRINCIPAL FEATURES: The following list of principal features is intended as a guide only and should in no way be considered an all-inclusive description of the work and does not relieve the contractor from the responsibility to complete the work in accordance with the applicable construction drawings, schedules, and specifications.
a) Demolition:
Remove paint of all crosswalks in base, approximately 9200.00 SQ FT, using “Shot Blasting Systems” equipment.
b) New Work:
Re-paint all base crosswalks, approximately 9200.00 SQ FT, to match the “Lajes Field Facilities Excellence Standards (LFFES)” and the European Pavement Markings, with white thermoplastic paint.
c) Clean up the entire area at the end of each working day and before final inspection.
d) Is contractor responsibility to field verifying all the dimensions in order to accomplish this project.
e) Is contractor responsibility to provide horizontal and vertical traffic signage according with the legislation.
1.4 PERIOD OF PERFORMANCE: Contractor required completing work within 150 calendar days to including material acquisition and all required authorizations.
PART 2 - SPECIAL CONSIDERATIONS
2.1 Contractor shall use and comply with the most current and valid “Lajes Field Facilities Excellence Standards (LFFES)” for construction projects in the Lajes Field, Azores. A copy of these standards will be provided to the contractor by the Contracting Officer (CO).
01 11 00 Page 2
2.2 The contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The contractor shall only remove trees when specifically authorized by 65 CES Environmental Management function to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound. The contractor shall return all areas disturbed during construction to its original condition.
2.3 All contractor employees shall obey all traffic laws on installation. The contractor shall inform his employees, suppliers, and subcontractors that their vehicles shall not be parked on grass, in Fire Lanes or other restricted areas, parking spaces marked as “Handicapped” or “Government”, at any time. In addition, vehicles may not be driven over grass surfaces, unless indicated during a site visit or pre-performance conference. Any damage done to lawns, shrubs, sidewalks etc.
shall be repaired or replaced by the contractor at no additional cost to the government.
2.4 The contractor shall perform normal housekeeping functions at contractor job sites. Such functions include grounds maintenance, sweeping, mopping, dusting, disposal of accumulated waste materials and rubbish and other operations necessary to present a neat appearance at all times. All rubbish and waste materials shall be removed daily and shall be placed in contractor furnished containers. During construction, the contractor shall maintain all areas in a neat and orderly manner. The contractor shall clean the construction site and/or structure of all construction trash, trash generated by employees, debris, demolished building materials, combustible waste material, and/or dust daily or more frequently as necessary for safe operations. The contractor shall ensure all light or moderate weight debris at the construction site is properly secured in waste receptacles so that it does not blow to another area or onto the airfield. At the end of each project all equipment, rubble and rubbish shall be completely removed from government property by the contractor, leaving the area in a safe, clean and orderly manner to the satisfaction of the CO.
2.5 Trucks loaded with loose material that can create a dust, debris or falling hazard shall be secured and covered. Fasten a suitable cover, such as tarpaulin, over the load before entering surrounding streets. The contractor is solely responsible for spillage from his/her vehicles and such spillage shall be cleaned up immediately. For the duration of this contract and on a daily basis, the contractor shall remove from all base roads and/or streets asphalt, mud, soil, rocks, trash, and debris that result from their demolition operation on base. All roads and/or streets affected shall be cleaned before close of business on the particular day affected. In the case of asphalt, roads will be cleaned and/or treated with lime immediately.
2.6 Disposal: All demolition materials collected by the contractor shall be disposed of in an authorized landfill or transfer station outside the installation unless specified. Contractor shall not dispose of any materials at the site.
2.7 All contractor owned items such as, but not limited to, stakes, traffic/safety cones, barriers, warning tape, erosion control fences that are erected during construction, shall be removed
01 11 00 Page 3 entirely after completion of project and prior to Government acceptance of the project site. The contractor, at his own expense, shall return to the site to remove any items left at or near the project site after this time period. All trailers, equipment/storage units, residual construction materials shall be removed also within five (5) calendar days of Government acceptance of the project site.
2.8 The contractor shall coordinate the exact location of each item of work with the inspector, such as drainage systems, drop inlets, repairs, and so forth. Once a week, the contractors shall layout and stake the proposed work in the field, and then review the layout with the inspector, who shall make recommendations as to adjustments needed. Prior to doing any work, the contractor shall receive approval from the inspector, who will coordinate with the CO, engineer, and environmental flight as required.
PART 03 – SUBMITTALS
Provide submittals in accordance with section 01 33 00 and as requested in the Submittal Requirements Sheet
PART 04 - COORDINATION WITH GOVERNMENT ACTIVITIES
4.1 If it becomes necessary to interrupt work activities due to construction, permission to do so must be requested in writing to the CO twenty-one (21) calendar days in advance.
4.2 The contractor shall request street closings, twenty-one (21) calendar days prior to the closing.
Contractor is only authorized to request partial road closers.
4.3 PERMITS
4.3.1 Welding Permit: No welding shall be started without first obtaining a permit issued by the 65 CES/CEFP, Fire Prevention and Emergency Service Office. Contractor shall request the welding permit not less than five (5) working calendar days before the welding work starts.
4.3.2 Work Clearance Requests:
4.3.2.1 In order to avoid damaging any underground utilities, such as sewer, water, gas, electrical, telephone, cable TV, and possibly others, the contractor must obtain digging permits. The contractor shall process, obtain and maintain a Work Clearance Request (AF Form 103) required, prior to beginning construction.
4.3.2.2 The contractor is responsible for obtaining a Work Clearance Request for this project right after Notice to Proceed (NTP) is issued. The contractor must fill out the request form (AF Form 103) with pertinent information and attach a plan showing the location of the respective work (contract drawings with areas highlighted is acceptable).
01 11 00 Page 4
4.3.2.3 Also, as a part of the work request process, the contractor shall be required to mark all locations of excavation work on site with white spray paint or stakes with flagging. Existing utilities will be marked in the field by the respective agency in proposed construction areas. The contractor is required to maintain these markings (or reference points) so that the pertinent agency does not have to duplicate their work.
4.4 UNIQUE PROJECT REQUIREMENTS
4.4.1 Paving and Excavation Projects
4.4.1.1 Prior to start of any paving and excavation under this contract, the contractor shall coordinate start and completion dates in writing with the CO or his/her designated representative, five (5) calendar work days prior to the scheduled start date.
4.4.1.2 Special Requirements for Excavating Around or Locating Existing Utilities:
Excavations for street and utility outages will also include the following requirements unless waived by the CO: Prior to the start of work, all valve locations will be identified/located so the utility can be shut off in the event of accidental damage. To preclude accidental damage, the contractor shall locate the exact location of all known utilities by hand digging within 1m in each direction of the marked utility prior to any excavation with power equipment. Any utilities discovered during excavations that are not shown on the drawings will be marked on the contract drawings and will be identified on the contractor's as-built drawings.
PART 5 - GOVERNMENT FURNISHED MATERIALS (GFM): There is no government furnished material for this project.
PART 6 - QUALITY CONTROL
6.1 Government Inspection: When the contractor considers that the work is acceptable to the government and is complete, the contractor shall inform the CO five (5) calendar days in advance of the final inspection that the work is complete and ready for inspection. The CO and his representative will inspect the work on site. In the event that the work is not acceptable, the contractor shall record a list of deficiencies noted by the government to be corrected. A subsequent inspection will take place in order to review the corrected items.
6.2 Government Approval of Work: The government will notify the contractor that work is, or is not, acceptable. Invoices shall not be permitted until the government has accepted the work.
The contractor shall clean up prior to government acceptance.
PART 7 - EXISTING CONDITION DRAWINGS AND AS-BUILT DRAWINGS
7.1 Existing condition drawings showing existing underground utilities are available upon request.
The contractor shall avail himself of the drawings. Any utility line shown on the record
01 11 00 Page 5 drawings (or made known to the contractor) and damaged during construction work shall be repaired immediately by the contractor at no additional cost to the government.
7.2 The government does not guarantee the accuracy or adequacy of existing record drawings.
It is the contractor's responsibility to verify all existing conditions prior to starting work.
7.3 During the progress of the job, the contractor shall keep a careful record at the job site of all work accomplished from the layouts shown on the drawings. The contractor shall provide documents (drawings or sketches) to describe all of the work accomplished, and enter changes and corrections on contract or record drawings promptly and submit to the CO.
PART 8 - AVAILABILITY/UNAVAILABILITY OF UTILITIES SERVICES
8.1 All reasonable required amounts of water, electricity, etc., essential to contract performance, will be made available at no cost to the contractor from existing systems, outlets and supplies. All temporary connections, outlets and distribution lines, as may be required, shall be installed by the contractor at his own expense.
8.2 Water Supply. When required, the contractor will be furnished a water supply from a fire hydrant selected by the CO with the written coordination of the Chief, Fire and Emergency Services Office. Exceptions will be in the case of a significant drop in water pressure on the system degrading the protection of facilities and/or lives.
8.3 Unavailable Toilet Facilities: The contractor shall provide his own chemical sanitary toilets at work sites. Chemical toilets must be serviced regularly and may be inspected by the Government. Sanitary deficiencies shall be corrected within 24 hours after a deficiency is made known to the contractor.
PART 9 - SAFETY ASSURANCE
9.1 Preconstruction Safety Meeting: Representatives of the contractor shall meet with the contracting officer and representatives prior to the start of demolition activities for the purpose of reviewing the contractor’s safety and health provisions pertinent to the work to be performed under the contract. The contractor shall be prepared to discuss, in detail, the measures it intends to take in order to control any unsafe or unhealthy conditions associated with the work to be performed under the contract. This meeting may be held in conjunction with the preconstruction conference, if so directed by the contracting officer. The conduct of this meeting is not contingent upon a general preconstruction meeting. The level of detail for the safety meeting is dependent upon the nature of the work and the potential inherent hazards. The contractor’s principal on site representatives, the general superintendent, and its safety representatives shall attend this meeting.
9.2 Contractor Responsibility: The contractor shall assume full responsibility and liability for compliance with the applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on its part or that of its employees or subcontractors, which results in illness, injury or death.
01 11 00 Page 6
PART 10 - MISCELLANEOUS
10.1 Distances, dimensions, exact location and other details must be field verified in order to assure proper installation and conformity with applicable standards, prior to order materials and/or execute the project.
PART 11 - REFERENCE
11.1 Drawings: As supplied.
11.2 Lajes Field Facilities Excellence Standards (LFFES).
-- End of Section --
01 33 00 Page 1
SECTION 01 33 00
SUBMITTAL
PROCEDURES
PART 01 - GENERAL
1.1 SUMMARY: The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements. Contractor's Quality Control (CQC) System Manager shall check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; certifications; and other such required submittals. Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby.
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections. Submittals are identified by Submittal Description (SD) numbers and titles as follows:
SD-01 Pre-demolition Submittals
Submittals which are required prior to start of demolition (work), issuance of contract notice to proceed, or commencing work on site.
Submittal Register
Certificates of insurance
Health and Safety Plan
Work plan
Quality Control (QC) Plan
Environmental Protection Plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
01 33 00 Page 2
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accordance with specified requirements. (Testing must have been within three years of date of contract award for the project.) Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site. Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports. Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project. Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism. Special requirements necessary to properly close out the contract. For example, Record Drawings and as-built drawings. Final "DD Form 1354" with cost breakout for all assets 5 calendar days prior to project completion.
1.3 SUBMITTALS: Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only.
01 33 00 Page 3
1.4 SUBMITTAL CLASSIFICATION: Submittals are classified as follows:
1.4.1 Government Approved [G]: Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer. Government approval is required for any deviations from the Solicitation or Accepted Proposal and other items as designated by the Contracting Officer. Within the terms of the Contract Clause entitled, "Specifications and Drawings for Construction," they are considered to be "shop drawings."
1.4.1.1 Substitutions: Unless prohibited or provided for otherwise elsewhere in the Contract, where the accepted contract proposal named products, systems, materials or equipment by manufacturer, brand name and/or by model number or other specific identification, and the Contractor desires to substitute manufacturer or model after award, submit a requested substitution for Government concurrence. Include substantiation, identifying information and as meeting the contract requirements and that it is equal in function, performance, quality and salient features to that in the accepted contract proposal. If the Contract otherwise prohibits substitutions of equal named products, systems, materials or equipment by manufacturer, brand name and/or by model number or other specific identification, the request is considered a "variation" to the contract.
1.4.1.2 Information Only: Submittals not requiring Government approval will be for information only. They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.
1.5 FORWARDING SUBMITTALS REQUIRING GOVERNMENT APPROVAL: As
soon as practicable after award of contract, and before procurement or fabrication, forward to the Contracting Officer (CO) submittals required by the technical sections of this specification, including shop drawings, product data and samples. The CO OR HIS Technical Representative for this project will review and approve those submittals to verify submittals comply with the contract requirements.
1.6 PREPARATION
1.6.1 Identifying Submittals: When submittals are provided by a Subcontractor, the Prime Contractor is to prepare, review and stamp with Contractor's approval all specified submittals prior to submitting for Government approval.
Identify submittals with the following information permanently adhered to or noted on each separate component of each submittal and noted on transmittal form. Mark each copy of each submittal identically, with the following:
01 33 00 Page 4
1.6.1.1 Project title and location.
1.6.1.2 Construction contract number.
1.6.1.3 Date of the drawings and revisions.
1.6.1.4 Name, address, and telephone number of subcontractor, supplier, manufacturer and any other subcontractor associated with the submittal.
1.6.1.5 Section number of the specification section by which submittal is required.
1.6.1.6 Submittal description (SD) number of each component of submittal.
1.6.1.7 When a resubmission, add alphabetic suffix on submittal description, for example, submittal 18 would become 18A, to indicate resubmission.
1.6.1.8 Product identification and location in project.
1.6.2 Format for SD-02 Shop Drawings: Shop drawings are not to be less than 8
1/2 by 11 inches nor more than 30 by 42 inches, except for full size patterns or templates. Prepare drawings to accurate size, with scale indicated, unless other form is required. Drawings are to be suitable for reproduction and be of a quality to produce clear, distinct lines and letters with dark lines on a white background.
1.6.3 Format of SD-01 Pre-demolition Submittals and SD-11 Closeout Submittals:
When submittal includes a document which is to be used in project or become part of project record, other than as a submittal, do not apply Contractor's approval stamp to document, but to a separate sheet accompanying document.
1.7 QUANTITY OF SUBMITTALS
1.7.1 Number of Copies of SD-02 Shop Drawings: Submit three copies of submittals of shop drawings requiring review and approval only by QC organization and four copies of shop drawings requiring review and approval by the Government.
1.7.2 Number of Copies of SD-03 Product Data and SD-08 Manufacturer’s Instructions:
Submit in compliance with quantity requirements specified for shop drawings.
1.7.3 Number of Copies SD-05 Design Data and SD-07 Certificates: Submit in compliance with quantity requirements specified for shop drawings.
01 33 00 Page 5
1.7.4 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's Field Reports:
Submit in compliance with quantity and quality requirements specified for shop drawings other than field test results that will be submitted with QC reports.
1.7.5 Number of Copies of SD-01 Pre-demolition Submittals and SD-11 Closeout Submittals: Unless otherwise specified, submit three sets of administrative submittals.
1.8 INFORMATION ONLY SUBMITTALS: Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals.
The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work;
and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.9 SUBMITTAL REGISTER AND DATABASE: Prepare and maintain submittal register, as the work progresses. Do not change data which is output in columns (c), (d), (e), and (f) as delivered by Government; retain data which is output in columns (a), (g), (h), and (i) as approved. The Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.
1.9.1 Use of Submittal Register: Submit submittal register with QC plan and project schedule. Verify that all submittals required for project are listed and add missing submittals. Coordinate and complete the following fields on the register submitted with the QC plan and the project schedule:
Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.
Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.
Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.
1.9.2 Contractor Use of Submittal Register
Update the following fields with each submittal throughout contract.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to QC.
Column (l) List date of submittal transmission.
Column (q) List date approval received.
01 33 00 Page 6
1.9.3 Approving Authority Use of Submittal Register
Update the following fields.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (l) List date of submittal receipt.
Column (m) through (p) List Date related to review actions.
Column (q) List date returned to Contractor.
1.9.4 Government Review Action Codes
1.9.4.1 Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
1.9.4.2 Submittals marked "approved as noted" "or approved except as noted, re- submittal not required," authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections.
1.9.4.3 Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until re-submittal is approved.
1.9.4.4 Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
1.10 SCHEDULING: Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.
1.10.1 Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential re-submittal of requirements.
1.10.2 Submittals called for by the contract documents will be listed on the register.
If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve
01 33 00 Page 7 the Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked "N/A."
1.10.3 Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.
1.10.4 Except as specified otherwise, allow review period, beginning with receipt by approving authority, that includes at least 15 working calendar days for submittals for QC Manager approval and 20 working calendar days for submittals for Government approval.
Period of review for submittals with Contracting Officer approval begins when Government receives submittal from QC organization.
1.10.5 Period of review for each re-submittal is the same as for initial submittal.
1.11 GOVERNMENT APPROVING AUTHORITY: When approving authority is Contracting Officer, the Government will:
1.11.1 Note date on which submittal was received from QC Manager.
1.11.2 Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.
1.11.3 Identify returned submittals with one of the actions defined in paragraph entitled, "Government Review Action Codes," of this section and with markings appropriate for action indicated. Upon completion of review of submittals requiring Government approval, stamp and date approved submittals. 2 copies of the approved submittal will be retained by the Contracting Officer and 1 copies of the submittal will be returned to the Contractor.
1.12 REVIEW NOTATIONS: Government review will be completed within 20 calendar days after date of submission. Submittals will be returned to the Contractor with the following notations:
1.12.1 Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
1.12.2 Submittals marked "approved as noted" or “approved except as noted, re-submittal not required," authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections.
1.12.3 Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until re-submittal is approved.
01 33 00 Page 8
1.12.4 Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
1.13 DISAPPROVED SUBMITTALS: Contractor shall make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications;
notice as required under the clause entitled, "Changes," is to be given to the Contracting Officer. Contractor is responsible for the dimensions and design of connection details and construction of work. Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense. If changes are necessary to submittals, the Contractor shall make such revisions and submission of the submittals in accordance with the procedures above.
No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.14 APPROVED SUBMITTALS: The Contracting Officer's approval or acceptance of submittals is not be construed as a complete check, and indicates only that the general method of construction, materials, detailing and other information are satisfactory design, general method of construction, materials, detailing and other information appear to meet the Solicitation and Accepted Proposal. Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for [dimensions, the design of adequate connections and details, and the satisfactory construction of all work][design, dimensions, all design extensions, such as the design of adequate connections and details, etc., and the satisfactory construction of all work]. After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
1.15 PROGRESS SCHEDULE:
1.15.1 Bar Chart
1.15.1.1 Submit the progress chart, for approval by the Contracting Officer, at the Preconstruction Conference in one reproducible and 2 copies.
1.15.1.2 Prepare the progress chart in the form of a bar chart utilizing form "Construction Progress Chart" or comparable format acceptable to the Contracting Officer.
01 33 00 Page 9
1.15.1.3 Include no less than the following information on the progress chart:
1) Break out by major headings for primary work activity.
2) A line item breaks out under each major heading sufficient to track the progress of the work.
3) A line item showing contract finalization task which includes punch list, clean-up and demolition, and final utility “As-built” drawings.
4) A materials bar and a separate labor bar for each line item. Both bars will show the scheduled percentage complete for any given date within the contract performance period. Labor bar will also show the number of men (man-load) expected to be working on any given date within the contract performance period.
5) The estimated cost and percentage weight of total contract cost for each materials and labor bar on the chart.
6) Separate line items for mobilization and drawing submittal and approval. (These items are to show no associated costs.)
PART 2 PRODUCTS: Not Used
PART 3 EXECUTION: Not Used
-- End of Section
01 35 26 Page 1
SECTION 01 35 26
GOVERNMENT SAFETY REQUIREMENTS
PART 01 - GENERAL
1.1 REFERENCES: The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SAFETY ENGINEERS
(ASSE/SAFE) ASSE/SAFE A10.32 (2004) Fall Protection
ASSE/SAFE A10.34 (2001; R 2005) Protection of the Public on or Adjacent to Construction Sites
ASSE/SAFE Z359.1 (2007) Safety Requirements for Personal Fall
Arrest Systems, Subsystems and Components
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 10 (2010) Standard for Portable Fire Extinguishers
NFPA 241 (2009) Standard for Safeguarding Construction, Alteration, and Demolition Operations
NFPA 51B (2009; TIA 09-1) Standard for Fire Prevention
During Welding, Cutting, and Other Hot Work
NFPA 70 (2011; Errata 2 2012) National Electrical Code
NFPA 70E (2012) Standard for Electrical Safety in the workplace
01 35 26 Page 2
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008; Errata 1-2010; Changes 1-3 2010; Changes
4-6 2011) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1910.146 Permit-required Confined Spaces
29 CFR 1919 Gear Certification
29 CFR 1926 Safety and Health Regulations for Construction
29 CFR 1926.1400 Cranes & Derricks in Construction
29 CFR 1926.16 Rules of Construction
29 CFR 1926.450 Scaffolds
29 CFR 1926.500 Fall Protection
CPL 2.100 (1995) Application of the Permit-Required
Confined Spaces (PRCS) Standards, 29 CFR
1910.146
01 35 26 Page 3
1.2 DEFINITIONS:
1.2.1 High Visibility Accident. Any mishap which may generate publicity or high visibility.
1.2.2 Medical Treatment. Treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even through provided by a physician or registered personnel.
1.2.3 Recordable Injuries or Illnesses. Any work-related injury or illness that results in:
1.2.3.1 Death, regardless of the time between the injury and death, or the length of the illness;
1.2.3.2 Calendar days away from work (any time lost after day of injury/illness onset);
1.2.3.3 Restricted work;
1.2.3.4 Transfer to another job;
1.2.3.5 Medical treatment beyond first aid;
1.2.3.6 Loss of consciousness; or
1.2.3.7 A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (6) above.
1.2.4 "USACE" property and equipment specified in USACE EM 385-1-1 should be interpreted as Government property and equipment.
1.3 SUBMITTALS: Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: Government acceptance, as defined in EM 385-1-1, is required for submittals with a "G, A" designation.
SD-01 Preconstruction Submittals
Accident Prevention Plan (APP); G, A Activity Hazard Analysis (AHA);
SD-06 Test Reports
Notifications and Reports
Submit reports as their incidence occurs, in accordance with the requirements of the paragraph, "Notifications and Reports."
01 35 26 Page 4
Accident Reports
SD-07 Certificates
Hot work permit
Daily Quality Control Report.
1.4 REGULATORY REQUIREMENTS: In addition to the detailed requirements included in the provisions of this contract, comply with the most recent addition of USACE EM 385-1- 1.Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern.
1.5 SITE QUALIFICATIONS, DUTIES AND MEETINGS:
1.5.1 Personnel Qualifications
1.5.1.1 Site Safety and Health Officer (SSHO): The SSHO must meet the requirements of EM 385-1-1 section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one (1) person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Designated Representative/alternate shall be at the work site at all times to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO's training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled SITE SAFETY AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs. A Competent Person shall be provided for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the Contracting Officer for acceptance in consultation with the Safety Office.
1) Contractor Quality Control (QC) Person: The Contractor Quality Control Person can be the SSHO on this project.
1.5.1.2 Personnel Duties
1.5.1.2.1 Site Safety and Health Officer (SSHO) The SSHO shall:
1) Conduct daily safety and health inspections and maintain a written log which includes area/operation inspected, date of inspection, identified hazards, recommended corrective actions, estimated and actual dates of corrections. Attach safety inspection logs to the Contractors' daily quality control report.
01 35 26 Page 5
2) Conduct mishap investigations and complete required reports. Maintain the OSHA Form 300 and Daily Production reports for prime and sub-contractors
3) Maintain applicable safety reference material on the job site.
4) Attend the pre-construction conference, pre-work meetings including preparatory inspection meeting, and periodic in-progress meetings.
5) Implement and enforce accepted APPS and AHAs.
6) Maintain a safety and health deficiency tracking system that monitors outstanding deficiencies until resolution. Post a list of unresolved safety and health deficiencies on the safety bulletin board.
7) Ensure sub-contractor compliance with safety and health requirements.
8) Maintain a list of hazardous chemicals on site and their material safety data sheets.
Failure to perform the above duties will result in dismissal of the superintendent, QC Manager, and/or SSHO, and a project work stoppage. The project work stoppage will remain in effect pending approval of a suitable replacement.
1.5.1.3 Meetings
1.5.1.3.1 Preconstruction Conference
1) Contractor representatives who have a responsibility or significant role in accident prevention on the project shall attend the preconstruction conference. This includes the project superintendent, site safety and health officer, quality control supervisor, or any other assigned safety and health professionals who participated in the development of the APP (including the Activity Hazard Analyses (AHAs) and special plans, program and procedures associated with it).
2) Discuss the details of the submitted APP to include incorporated plans, programs, procedures and a listing of anticipated AHAs that will be developed and implemented during the performance of the contract. This list of proposed AHAs will be reviewed at the conference and an agreement will be reached between the Contractor and the Contracting Officer's representative as to which phases will require an analysis. In addition, establish a schedule for the preparation, submittal, review, and acceptance of AHAs to preclude project delays.
01 35 26 Page 6
3) Deficiencies in the submitted APP will be brought to the attention of the Contractor at the preconstruction conference, and the Contractor shall revise the plan to correct deficiencies and re-submit it for acceptance. Do not begin work until there is an accepted APP.
1.6 ACCIDENT PREVENTION PLAN (APP): Use a qualified person to prepare the written site-specific APP. Prepare the APP in accordance with the format and requirements of USACE EM 385-1-1 and as supplemented herein. Cover all paragraph and subparagraph elements in USACE EM 385-1-1, Appendix A, "Minimum Basic Outline for Accident Prevention Plan". Specific requirements for some of the APP elements are described below.
The APP shall be job-specific and address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the Contractor's overall safety and health program. Include any portions of the Contractor's overall safety and health program referenced in the APP in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out. The APP shall be signed by the person and firm (senior person) preparing the APP, the Contractor, the on-site superintendent, the designated site safety and health officer, the Contractor Quality control Manager, and any designated CSP or CIH. Submit the APP to the Contracting Officer15 calendar days prior to the date of the preconstruction conference for acceptance. Work cannot proceed without an accepted APP. Once accepted by the Contracting Officer, the APP and attachments will be enforced as part of the contract. Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer, until the matter has been rectified. Once work begins, changes to the accepted APP shall be made with the knowledge and concurrence of the Contracting Officer, project superintendent, SSHO and quality control manager. Should any severe hazard exposure, i.e. imminent danger, become evident, stop work in the area, secure the area, and develop a plan to remove the exposure and control the hazard. Notify the Contracting Officer within 24 hours of discovery. Eliminate/remove the hazard. In the interim, take all necessary action to restore and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public (as defined by ASSE/SAFE A10.34,) and the environment. Copies of the accepted plan will be maintained at the Contracting Officer's office and at the job site.
Continuously reviewed and amended the APP, as necessary, throughout the life of the contract. Incorporate unusual or high-hazard activities not identified in the original APP as they are discovered.
1.7 ACTIVITY HAZARD ANALYSIS (AHA): The Activity Hazard Analysis (AHA) format shall be in accordance with USACE EM 385-1-1, Section 1. Submit the AHA for review at least 15 calendar days prior to the start of each phase. Format subsequent AHAs as amendments to the APP. The analysis should be used during daily inspections to ensure the implementation and effectiveness of the activity's safety and health controls. The AHA list
01 35 26 Page 7 will be reviewed periodically (at least monthly) at the Contractor supervisory safety meeting and updated as necessary when procedures, scheduling, or hazards change. Develop the activity hazard analyses using the project schedule as the basis for the activities performed.
Any activities listed on the project schedule will require an AHA. The AHAs will be developed by the contractor, supplier or subcontractor and provided to the prime contractor for submittal to the Contracting Officer.
1.8 SITE SAFETY REFERENCE MATERIALS: Maintain safety-related references applicable to the project, including those listed in the article "References." Maintain applicable equipment manufacturer's manuals.
1.9 EMERGENCY MEDICAL TREATMENT: Contractors will arrange for their own emergency medical treatment. Government has no responsibility to provide emergency medical treatment.
1.10 NOTIFICATIONS and REPORTS:
1.10.1 Accident Notification: Notify the Contracting Officer as soon as practical, but no more than four hours after any accident meeting the definition of Recordable Injuries or Illnesses or High Visibility Accidents, property damage equal to or greater than $2,000, or any weight handling equipment accident. Within notification include contractor name; contract title; type of contract; name of activity, installation or location where accident occurred; date and time of accident; names of personnel injured; extent of property damage, if any; extent of injury, if known, and brief description of accident (to include type of construction equipment used, PPE used, etc.). Preserve the conditions and evidence on the accident site until the Government investigation team arrives on-site and Government investigation is conducted.
1.10.2 Accident Reports: Conduct an accident investigation for recordable injuries and illnesses, for Medical Treatment defined in paragraph DEFINITIONS, property damage accidents resulting in at least $20,000 in damages, and near misses as defined in EM 385-1-1, to establish the root cause(s) of the accident. The Contracting Officer will provide copies of any required or special forms.
1.10.3 Crane Reports: Submit crane inspection reports required in accordance with
USACE EM 385-1-1, Appendix I and as specified herein with Daily Reports of Inspections.
1.11 HOT WORK: Submit and obtain a written permit prior to performing "Hot Work"
(welding, cutting, etc.) or operating other flame-producing/spark producing devices, from the Fire Division. CONTRACTORS ARE REQUIRED TO MEET ALL CRITERIA BEFORE A PERMIT IS ISSUED. Provide at least two (2) twenty (20) pound 4A:20 BC rated extinguishers for normal "Hot Work". All extinguishers shall be current inspection tagged, approved safety pin and tamper resistant seal. It is also mandatory to have a designated FIRE WATCH for any "Hot Work" done at this activity. The Fire Watch shall be trained in accordance with NFPA 51B and remain on-site for a minimum of 30 minutes after
01 35 26 Page 8 completion of the task or as specified on the hot work permit. When starting work in the facility, require personnel to familiarize themselves with the location of the nearest fire alarm boxes and place in memory the emergency phone number. ANY FIRE, NO MATTER HOW
SMALL, SHALL BE REPORTED TO THE RESPONSIBLE FIRE DEPARTMENT
IMMEDIATELY.
1.12 FACILITY OCCUPANCY CLOSURE: Streets, walks, and other facilities occupied and used by the Government shall not be closed or obstructed without written permission from the Contracting Officer.
1.12.1 SEVERE STORM PLAN: In the event of a severe storm warning, the Contractor must:
1.12.2 Secure outside equipment and materials and place materials that could be damaged in protected areas.
1.12.3 Check surrounding area, including roof, for loose material, equipment, debris, and other objects that could be blown away or against existing facilities.\
1.12.4 Ensure that temporary erosion controls are adequate.
PART 02 – PRODUCTS: Not used.
PART 03 - EXECUTION
3.1 UNFORESEEN HAZARDOUS MATERIAL: The design should have identified materials such as PCB, lead paint, and friable and non- friable asbestos and other OSHA regulated chemicals (i.e. 29 CFR Part 1910.1000).
This is the start of the file's text. The full file is on GovTribe.