C-1_B410_Specs.pdf
PDF 10 MB Posted
- Attached to
- B410 Construction Federal contract opportunity
- Solicitation number
- FA448419RA036
About this file
C-1 B410 Specs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B410_Construction_Q+A.pdf | ||
| Solicitation_Amendment_FA448419RA0360003_SF_30.pdf | ||
| B410_Attendance.pdf | ||
| Solicitation_Amendment_FA448419RA0360002_SF_30.pdf | ||
| FA448419RA0360001.pdf | ||
| J-4_JB-MDL_Medical_Statement.pdf | ||
| C-3_SID_Package.pdf | ||
| J-1_JB-MDL_WD_OC_NJ190039_20190517.pdf | ||
| J-2_JB-MDL_SFS_Appendix.PDF | ||
| J-5_JB-MDL_Past_Performance_Questionnaire_v2.pdf | ||
| C-2 B410 Drawings.pdf | ||
| J-3_JB-MDL_AntiterrorismStatement.pdf | ||
| Solicitation_-_FA448419RA036.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LRP Addition/Alteration of Calibration Lab, Bldg 410
FA890316D0007
Joint Base McGuire-Dix-Lakehurst, Lakehurst, New Jersey
Final Design Submittal – For Construction
SPECIFICATIONS
April 8, 2019 Prepared by STOA Architects
STOA #18024
04/08/2019
Lakehu
04/08/2019
LRP Addition/Alteration of Calibration Lab, Bldg 410 Joint Base McGuire-Dix-Lakehurst, Lakehurst, NJ
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 STATEMENT OF WORK
01 45 35 SPECIAL INSPECTIONS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DECONSTRUCTION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 QUARTZ AGGLOMERATE COUNTERTOPS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 31 13 ASPHALT SHINGLES
07 60 00 FLASHING AND SHEET METAL
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 23 OVERHEAD COILING DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
PROJECT TABLE OF CONTENTS Page 1 Final Design Submittal - For Construction
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
DIVISION 21 - FIRE SUPPRESSION
21 13 00.00 40 FIRE-SUPPRESSION SPRINKLER SYSTEMS
21 13 16.00 20 DRY-PIPE FIRE SPRINKLER SYSTEMS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 07 19.00 40 PLUMBING PIPING INSULATION
22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 21 23 HYDRONIC PUMPS
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 52 43.00 20 LOW PRESSURE WATER HEATING BOILERS (UNDER 800,000 BTU/HR
OUTPUT)
23 64 10 VAPOR COMPRESSION TYPE
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 27 13.10 30 ELECTRIC METERS
26 32 33.00 10 UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM ABOVE 15 KVA
CAPACITY
26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER
26 35 44.00 20 270 VDC SOLID STATE GROUND POWER UNIT
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
PROJECT TABLE OF CONTENTS Page 2 Final Design Submittal - For Construction
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 74.00 20 INTERIOR FIRE DETECTION AND ALARM SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 10 00 CLEARING FOR CIVIL WORKS
31 23 00.00 20 EXCAVATION AND FILL
31 31 16.13 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 13.62 ASPHALT SURFACE TREATMENT
32 01 16.71 COLD MILLING ASPHALT PAVING
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 20 SUBBASES FOR FLEXIBLE PAVING
32 11 23 AGGREGATE BASE COURSES
32 11 27 BITUMINOUS-STABILIZED BASE COURSE, SUBBASE, OR SUBGRADE
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 92 23 SODDING
-- End of Project Table of Contents
PROJECT TABLE OF CONTENTS Page 3 Final Design Submittal - For Construction
APPENDIX
Appendix A
Appendix B
NGEN INSIDE CABLE PLANT (ISP) INSTALLATION STANDARDS
ASBESTOS AND LEAD PAINT INSPECTION REPORT
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 54 PAGES
LRP Addtion/Alteration of Calibration Lab, Bldg 410
01 45 35 SD-06 Test Reports
3.1.2Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1Wood Truss Plant
1.5 G AESpecial Inspector
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
GDeconstruction Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals
3.3.4Receipts
03 30 00 SD-02 Shop Drawings
1.6.2.1 G AEReinforcing Steel
SD-03 Product Data
2.2.8Joint Sealants
2.2.7Joint Filler
2.2.3.3Recycled Aggregate Materials
2.2.1Cementitious Materials
2.2.6Vapor Barrier
2.1.3Concrete Curing Materials
2.3Reinforcement
2.2.5Admixtures
Local/Regional Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 54 PAGES
03 30 00 SD-05 Design Data
2.1.1 G AEMix Design
SD-06 Test Reports
1.6.1.1 G AEConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Ground Granulated Blast-Furnace
Slag
2.2.3Aggregates
3.10.2.1Tolerance Report
3.14.2.3 G AECompressive Strength Tests
3.14.2.5Unit Weight of Structural
Concrete
3.14.2.4Air Content
3.14.2.1Slump Tests
2.2.2Water
SD-07 Certificates
2.3.1Reinforcing Bars
04 20 00 SD-02 Shop Drawings
3.3.3.1 G AECut CMU
3.4.1.1 G AEDetail Drawings
SD-03 Product Data
1.5.1 G AECold Weather Procedures
2.2.2.1.1 G AECement
SD-04 Samples
G AEMock-Up Panel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 54 PAGES
04 20 00 2.2.2.1 G AEConcrete Masonry Units (CMU)
2.6.2 G AEAnchors, Ties, and Bar
Positioners
2.6.3 G AEJoint Reinforcement
2.6.6 G AEExpansion-Joint Materials
SD-05 Design Data
G AEPre-Mixed Mortar;
G AEUnit Strength MethodBracing
Calculations
SD-06 Test Reports
Efflorescence Test
Fire-Rated Concrete Masonry
Units
3.6.1.1 G AEField Testing of Grout
G AEPrism Tests
Single-Wythe Masonry Wall
Water Penetration Test
SD-07 Certificates
Masonry Inspector Qualifications
2.2.2.1Concrete Masonry Units (CMU)
Concrete Brick
2.4.1.1Cementitious Materials
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 54 PAGES
04 20 00 2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
05 50 13 SD-02 Shop Drawings
2.4 GBollards/Pipe Guards
SD-03 Product Data
2.5 GDownspout Terminations
2.1 SRecycled Content
GCertificates of Compliance
06 10 00 SD-02 Shop Drawings
G AETrussed Rafters
2.4.1 G AETrussed Joists
1.8.1 G AEFabricated Structural Members
1.8.2 G AEModifications of Structural
Members
SD-03 Product Data
Underlayment
Fire-retardant Treatment
Structural-use and OSB Panels
2.3Oriented Strand Board
2.4.3Adhesives
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 54 PAGES
06 10 00 1.8.2 G AEModifications of Structural
Members
SD-06 Test Reports
1.4.3Preservative-treated
SD-07 Certificates
1.10.1Certificates of Grade
1.7Preservative Treatment
1.10.2Indoor Air Quality
SD-10 Operation and Maintenance
Data
Plastic
Take-back Program
06 41 16.00 10 SD-02 Shop Drawings
2.10Shop Drawings
3.1Installation
SD-03 Product Data
2.1Wood Materials
Wood Finishes
2.10.7.3Finish Schedule
Certification
SD-04 Samples
2.3Plastic Laminates
2.6Cabinet Hardware
SD-07 Certificates
1.4Quality Assurance
3.1Laminate Clad Casework
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 54 PAGES
06 61 16 SD-02 Shop Drawings
G AEDetail Drawings
3.1 G AEInstallation
SD-03 Product Data
G AEQuartz Agglomerate Material
1.4.1 G AEQualifications
2.3 G AEFabrications
G AECertification
G AEVOC Content
SD-04 Samples
2.1 G AEMaterial
SD-10 Operation and Maintenance
Data
3.2 G AEClean-up
07 21 16 SD-03 Product Data
2.2Blanket Insulation
Sill Sealer Insulation
Pressure Sensitive Tape
2.4Accessories
SD-08 Manufacturer’s Instructions
3.2.1Insulation
07 24 00 SD-02 Shop Drawings
3.3 G AEShop Drawings
SD-03 Product Data
Sheathing Board
2.4Thermal Insulation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 54 PAGES
07 24 00 2.3Adhesive
2.5Base Coat
2.6Portland Cement
2.7Reinforcing Fabric
2.8Finish Coat
2.11Joint Sealant
2.9Sealant Primer
2.12Bond Breaker
2.13Backer Rod
1.4.5Insulation Board
1.7Warranty
SD-04 Samples
1.2.3.7 G AESample Boards
SD-06 Test Reports
1.2.3.1Abrasion Resistance
1.2.3.2Accelerated Weathering
1.2.2.3Impact Resistance
1.2.3.3Mildew Resistance
1.2.3.4Salt Spray Resistance
1.2.4Vapor Transmission
1.2.3.6Absorption-Freeze-Thaw
1.2.1.3Wall Fire Test
1.2.1.1Water Penetration
1.2.2.1Surface Burning Characteristics
1.2.2.2Radiant Heat
3.1Substrate
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 54 PAGES
07 24 00 1.2.1.2Wind Load
SD-07 Certificates
1.4.1Qualifications of EIFS
Manufacturer
1.4.2Qualification of EIFS Installer
1.4.3Qualification of Sealant Applicator
1.4.4Qualifications of Third Party
Inspector
3.5.1 G AEInspection Check List
SD-08 Manufacturer’s Instructions
3.3Installation
SD-10 Operation and Maintenance
Data
1.7EIFS
07 27 26 SD-01 Preconstruction Submittals
1.5.1Qualifications of Manufacturer
1.5.2Qualifications of Installer
SD-02 Shop Drawings
1.3 G AEFluid-Applied Membrane Air
Barrier
SD-03 Product Data
1.3 G AEFluid-Applied Membrane Air
Barrier
2.6Reinforcement
1.3.2 G AESafety Data Sheets
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 54 PAGES
07 27 26 Mockup
SD-06 Test Reports
Capillary Moisture Test
1.3.3Field Peel Adhesion Test
1.3.3 G AEFlame Spread and Smoke
Developed Index Ratings
Site Inspections
SD-07 Certificates
1.3Fluid-Applied Membrane Air
Barrier
1.5.1Qualifications of Manufacturer
1.5.2Qualifications of Installer
SD-08 Manufacturer’s Instructions
1.3Fluid-Applied Membrane Air
Barrier
SD-11 Closeout Submittals
2.1 S AEVolatile Organic Compound
(VOC) Content
07 27 36 SD-01 Preconstruction Submittals
1.8.2Respirator Plan
SD-03 Product Data
2.2.2Closed Cell
2.3Transition Membrane
2.4Primers, Adhesives, and Mastics
2.6Sealants
1.5.1Safety Data Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 54 PAGES
07 27 36 SD-06 Test Reports
1.5.2 GFlame Spread And Smoke
Developed Index Ratings Of SPF
Products
1.5.2Flame Propagation Of Wall
Assemblies
SD-08 Manufacturer’s Instructions
1.6.1SPF Handling, Storage, and
Spray Procedures
2.3Transition Membrane
SD-11 Closeout Submittals
2.1.1Recycled Content
07 31 13 SD-03 Product Data
2.2.1Shingles
SD-04 Samples
2.2.1 G AEShingles
2.2.1 G AEColor Charts
SD-08 Manufacturer’s Instructions
3.3Application
SD-11 Closeout Submittals
2.2.1 SEnergy Star Label for Asphalt
Shingle
1.5.1Manufacturer's Warranty
1.5.2Contractor's Warranty
07 60 00 SD-02 Shop Drawings
2.2.1 G AEExposed Sheet Metal
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 54 PAGES
07 60 00 3.1.9 G AEGutters
3.1.10 G AEDownspouts
G AEExpansion Joints
G AEFascia
3.1.5 G AEBase Flashing
3.1.6 G AECounterflashing
3.1.13 G AEFlashing at Roof Penetrations
and Equipment Supports
3.1.8Drip Edges
3.1.11 G AEEave Flashing
SD-04 Samples
1.4.2 G AEFinish Samples
SD-07 Certificates
2.1Certificates of Compliance
SD-08 Manufacturer’s Instructions
1.4.3Instructions for Installation
3.5Quality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3Cleaning and Maintenance
SD-11 Closeout Submittals
2.1Recycled Content
07 92 00 SD-03 Product Data
2.2 G AESealants
2.3 G AEPrimers
2.4 G AEBond Breakers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 54 PAGES
07 92 00 2.5 G AEBackstops
3.1 G AEField Adhesion
SD-11 Closeout Submittals
2.2.1 SIndoor Air Quality For Interior
Sealants
2.2.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.2.4 SIndoor Air Quality For Interior
Acoustical Sealants
2.6 SIndoor Air Quality For Interior
Caulking
08 11 13 SD-02 Shop Drawings
2.1 G AEDoors
2.1 G AEDoors
2.4 G AEFrames
2.4 G AEFrames
2.2Accessories
2.5Weatherstripping
SD-03 Product Data
2.1 G AEDoors
2.4 G AEFrames
2.2Accessories
2.5Weatherstripping
08 14 00 SD-02 Shop Drawings
2.1 G AEDoors
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 54 PAGES
08 14 00 2.1 G AEDoors
2.2 G AEAccessories
2.3.6 G AEWater-resistant Sealer
1.5 G AEWarranty
2.1.2 G AESound Transmission Class
Rating
SD-04 Samples
2.3.5.2 G AEDoor Finish Colors
SD-06 Test Reports
2.4 G AECycle-Slam
2.4 G AEHinge Loading Resistance
08 33 23 SD-02 Shop Drawings
2.2.1 G AEOverhead Coiling Doors
2.2.3Counterbalancing Mechanism
2.2.4 G AEManual Door Operators
2.2.1.3Bottom Bars
2.1.1.1Guides
2.2.3.1Mounting Brackets
2.2.1.8Overhead Drum
3.3.2Hood
2.1.1.1Installation Drawings
SD-03 Product Data
2.2.1 G AEOverhead Coiling Doors
2.2.2Hardware
2.2.3Counterbalancing Mechanism
2.2.4Manual Door Operators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 54 PAGES
08 33 23 SD-05 Design Data
2.2.1 G AEOverhead Coiling Doors
2.2.2Hardware
2.2.3Counterbalancing Mechanism
2.2.4Manual Door Operators
SD-10 Operation and Maintenance
Data
3.3.2Operation and Maintenance
Manuals
3.3.2Materials
3.3.2Devices
3.3.2Procedures
3.3.2Manufacture's Brochures
3.3.2Parts Lists
SD-11 Closeout Submittals
3.3.1 G AEWarranty
08 51 13 SD-02 Shop Drawings
2.2 G AEWindows
1.10Fabrication Drawings
SD-03 Product Data
2.2 G AEWindows
G AEHardware
2.3.2 G AEFasteners
Thermal-Barrier Windows
2.4Mullions
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 54 PAGES
08 51 13 1.4.2.1Finish Sample
SD-05 Design Data
2.2 G AEStructural Calculations for
Deflection
SD-11 Closeout Submittals
2.1.1 SRecycled Content of Aluminum
Windows
08 71 00 SD-02 Shop Drawings
1.3 G AEManufacturer's Detail Drawings
1.5 G AEHardware Schedule
2.3.8 G AEKeying System
SD-03 Product Data
2.3Hardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5Hardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-02 Shop Drawings
Installation
SD-03 Product Data
1.6.1Insulating Glass
1.3Glazing Accessories
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 54 PAGES
08 81 00 1.6.1Insulating Glass
SD-07 Certificates
1.6.1Insulating Glass
SD-08 Manufacturer’s Instructions
2.4Setting and Sealing Materials
3.2Glass Setting
09 22 00 SD-02 Shop Drawings
2.1 G AEMetal support systems
09 29 00 SD-03 Product Data
2.2.4Cementitious Backer Units
2.2.2Water-Resistant Gypsum Backing
Board
2.2.3Abuse Resistant Gypsum Board
2.2.7Accessories
1.3Certifications
2.2.1Gypsum Board
SD-07 Certificates
2.2Asbestos Free Materials
1.3.1Indoor Air Quality
SD-08 Manufacturer’s Instructions
2.2Safety Data Sheets
SD-10 Operation and Maintenance
Data
2.2Manufacturer Maintenance
Instructions
09 30 10 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 54 PAGES
09 30 10 2.1.1Porcelain Tile
Quarry Tile
2.1.2Glazed Wall Tile
2.2Setting-Bed
2.4Mortar, Grout, and Adhesive
SD-04 Samples
2.1 G AETile
2.1 G AETransition Strips
2.6 G AETransition Strips
2.4.3 G AEGrout
SD-07 Certificates
1.3.1Indoor Air Quality
SD-08 Manufacturer’s Instructions
3.7Maintenance Instructions
SD-10 Operation and Maintenance
Data
3.2Installation
SD-11 Closeout Submittals
2.1.1 SRecycled Content for Porcelain
Tile
2.1.2 SRecycled Content for Glazed Wall
Tile
2.4 SIndoor Air Quality for Adhesives
2.4.6 SIndoor Air Quality for Sealants
09 51 00 SD-03 Product Data
G DORAcoustical Ceiling Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 54 PAGES
09 51 00 1.3Certifications
SD-04 Samples
2.2.1.1 G DORAcoustical Ceiling Tiles
SD-06 Test Reports
2.1.1 G DORCeiling Attenuation Class and
Test
09 65 00 SD-02 Shop Drawings
2.7 G AEResilient Flooring and
Accessories
SD-03 Product Data
2.7 G AEResilient Flooring and
Accessories
2.3Adhesives
2.1Vinyl Composition Tile
2.2Wall Base
SD-04 Samples
2.7 G AEResilient Flooring and
Accessories
SD-06 Test Reports
3.3 G AEMoisture, Alkalinity and Bond
Tests
SD-08 Manufacturer’s Instructions
3.2Surface Preparation
3.1Installation
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 54 PAGES
09 65 00 2.7Resilient Flooring and
Accessories
09 90 00 SD-03 Product Data
1.7.1Local/Regional Materials
2.1 G DORCoating
2.1Manufacturer's Technical Data
Sheets
3.2.5Sealant
SD-04 Samples
G DORColor
SD-08 Manufacturer’s Instructions
3.3.1Application instructions
1.5.2Manufacturer's Material Safety
Data Sheets
SD-10 Operation and Maintenance
Data
2.1 G DORCoatings:
10 14 00.10 SD-02 Shop Drawings
3.1 G DORApproved Detail Drawings
SD-03 Product Data
2.1Modular Exterior Signage System
1.2Exterior Signage
SD-04 Samples
1.2 G DORExterior Signage
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 54 PAGES
10 14 00.10 3.1.2 GProtection and Cleaning
10 14 00.20 SD-02 Shop Drawings
1.4.2 G DORDetail Drawings
SD-03 Product Data
3.1 G DORInstallation
1.6 G DORWarranty
SD-04 Samples
1.4.1 G DORInterior Signage
Software
SD-10 Operation and Maintenance
Data
3.1.2 G DORProtection and Cleaning
10 26 00 SD-02 Shop Drawings
2.2Corner Guards
SD-03 Product Data
2.2Corner Guards
SD-04 Samples
2.4Finish
SD-06 Test Reports
2.2Corner Guards
SD-07 Certificates
2.2Corner Guards
1.3.1Indoor Air Quality
10 28 13 SD-03 Product Data
2.1.2Finishes
2.2Accessory Items
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 54 PAGES
10 28 13 SD-11 Closeout Submittals
2.1 SRecycled content for stainless
steel toilet accessories
10 44 16 SD-01 Preconstruction Submittals
2.1.1 GManufacturer's Data
SD-02 Shop Drawings
2.1.1 G AEFire Extinguishers
1.3.1Accessories
Part 2 G AECabinets
1.3.1 G AEWall Brackets
SD-03 Product Data
2.1.1Fire Extinguishers
1.3.1Accessories
Part 2Cabinets
1.3.1Wall Brackets
3.2.1Replacement Parts List
SD-07 Certificates
2.1.1Fire Extinguishers
2.1.1Manufacturer's Warranty with
Inspection Tag
12 21 00 SD-02 Shop Drawings
3.3Installation
SD-03 Product Data
2.1 G AEWindow Blinds
3.3Installation
Certifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 54 PAGES
12 21 00 SD-04 Samples
2.1 G AEWindow Blinds
SD-06 Test Reports
2.1Window Blinds
SD-08 Manufacturer’s Instructions
2.1Window Blinds
SD-10 Operation and Maintenance
Data
2.1Window Blinds
21 13 00.00 40 SD-01 Preconstruction Submittals
1.2 GRecord of Existing Conditions
SD-02 Shop Drawings
2.2.3 GSupporting Elements
2.2.4 GFire-Department Connections
2.2.7 GSprinkler Heads
2.2.8 GValves
SD-03 Product Data
2.2.1 GUnderground Piping Materials
2.2.2 GAboveground Piping Materials
2.2.8 GValves
2.2.4 GFire-Department Connections
2.2.5 GRiser Alarm Equipment
2.2.6.1 GAir Compressor
2.2.7 GSprinkler Heads
2.3 GMaterials
2.2.3 GSupporting Elements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 54 PAGES
21 13 00.00 40 2.1 GEquipment and Performance
Data
SD-05 Design Data
Part 2 GDesign Analysis and Calculations
SD-06 Test Reports
3.3.6 GPressure Tests
3.3.3 GSystem Operating Tests
3.3.3 GAir Tests
3.3.3 GValve-Operating Tests
3.3.3 GDrainage Tests
21 13 16.00 20 SD-02 Shop Drawings
1.3.8 GSprinkler heads and piping
system layout
1.3.8 GElectrical wiring diagrams
SD-03 Product Data
2.1 GPiping
2.1.10 GValves
2.1.5 GWater motor alarms
2.1.2 GSprinkler heads
2.1.9 GPipe hangers and supports
2.1.14 GFire department connections
2.1.7 GLow air pressure supervisory
switch
2.1.4 GDry pipe valves
2.1.8 GAir compressor
2.1.1 GMechanical couplings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 54 PAGES
21 13 16.00 20 2.1.10.1 GBackflow Preventers
2.1.6 GPressure Switch
SD-05 Design Data
1.3 GSprinkler system design
SD-06 Test Reports
3.2.1 GPreliminary tests
SD-07 Certificates
1.5.1 GQualifications of installer
SD-10 Operation and Maintenance
Data
2.1.4 GDry pipe valves
2.1.8 GAir compressor
SD-11 Closeout Submittals
1.3.9 GAs-built drawings of each system
22 00 00 SD-02 Shop Drawings
3.8.1 GPlumbing System
SD-03 Product Data
2.5Fixtures
2.5.3Flush Valve Water Closets
2.5.4Wall Hung Lavatories
2.5.5Countertop Lavatories
2.5.6Kitchen Sinks
2.5.7Service Sinks
2.10 GWater Heaters
2.12 GPumps
3.8.1.1 GBackflow Prevention Assemblies
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 54 PAGES
22 00 00 1.5.1Welding
3.4 GVibration-Absorbing Features
3.8.1Plumbing System
SD-06 Test Reports
3.8Tests, Flushing and Disinfection
3.8.1.1 GTest of Backflow Prevention
Assemblies
SD-07 Certificates
1.3Materials and Equipment
2.2.1Bolts
SD-10 Operation and Maintenance
Data
3.8.1 GPlumbing System
SD-11 Closeout Submittals
2.1.1 SWater-Efficient Products
2.1.2 SEnergy-Efficient Water Heaters
22 07 19.00 40 SD-02 Shop Drawings
3.1 GInstallation Drawings
SD-03 Product Data
2.3 GAdhesives
2.3 GCoatings
2.3 GInsulating Cement
2.3 GInsulation Materials
2.3 GTape
SD-08 Manufacturer’s Instructions
3.1 GInstallation Manual
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 54 PAGES
22 07 19.00 40 SD-11 Closeout Submittals
3.4Record Drawings
2.3 SAdhesives
2.3 SCoatings
2.3 SInsulation Materials
1.3.1 SRecycled Materials
22 15 14.00 40 SD-02 Shop Drawings
2.1 GInstallation Drawings
SD-03 Product Data
2.1.1 GEquipment and Performance
Data
2.3.1 GAboveground Piping Materials
2.2.1 GPiping Specialties
2.4.2 GSupporting Elements
2.2.2 GAir Compressors
2.2.3 GValves
3.1.1.1 GAccessories
2.4.1 GMiscellaneous Materials
SD-05 Design Data
2.1.1 GDesign Analysis and Calculations
SD-06 Test Reports
3.2.1.4Piping System Test Report
SD-07 Certificates
2.3.1Aboveground Piping Materials
2.4.2Supporting Elements
2.2.3Valves
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 54 PAGES
22 15 14.00 40 2.4.1Miscellaneous Materials
SD-10 Operation and Maintenance
Data
3.4Operation and Maintenance
Manuals
23 00 00 SD-02 Shop Drawings
1.4.5 GDetail Drawings
SD-03 Product Data
2.10.1.1Metallic Flexible Duct
2.10.1.2Insulated Nonmetallic Flexible
Duct Runouts
2.10.1.2Duct Connectors
2.10.2 GDuct Access Doors
2.10.3Fire Dampers
2.10.10Sound Attenuation Equipment
2.10.10.1Acoustical Duct Liner
2.10.11.1Diffusers
2.10.11.4Registers and Grilles
2.10.12Louvers
2.10.13Air Vents, Penthouses, and
Goosenecks
2.11.1.1Centrifugal Fans
2.11.1.3Centrifugal Type Power Roof
Ventilators
2.12 GAir Handling Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 54 PAGES
23 00 00 2.13.1.1 GVariable Volume, Single Duct
Terminal Units
2.13.1.3 GReheat Units
1.4.6Test Procedures
1.2.1.2 GDiagrams
SD-06 Test Reports
3.14 GPerformance Tests
3.12 GDamper Acceptance Test
SD-07 Certificates
1.4.7Certification
1.4.3Ozone Depleting Substances
SD-08 Manufacturer’s Instructions
3.3Manufacturer's Installation
Instructions
3.16.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
3.16.1 GOperation and Maintenance
Manuals
2.10.3 GFire Dampers
2.10.4 GManual Balancing Dampers
2.10.5 GManual Balancing Dampers
2.11.1.1 GCentrifugal Fans
2.11.1.2 GIn-Line Centrifugal Fans
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 54 PAGES
23 00 00 2.11.1.3 GCentrifugal Type Power Roof
Ventilators
2.12 GAir Handling Units
2.13.1.1 GVariable Volume, Single Duct
Terminal Units
2.13.1.3 GReheat Units
SD-11 Closeout Submittals
2.1.1 SEnergy Efficient Equipment
2.1.2 SReduce Volatile Organic
Compounds (VOC)
3.1 SIndoor Air Quality During
Construction
2.1.3 SOzone Depleting Substances for
Refrigerants
23 03 00.00 20 SD-11 Closeout Submittals
2.1.1 SEnergy Efficient Equipment for
Motors
2.1.2 SReduce Volatile Organic
Compounds (VOC)
23 05 15 SD-01 Preconstruction Submittals
1.2 GMaterial, Equipment, and Fixture
Lists
SD-02 Shop Drawings
1.2 GRecord Drawings
1.2 GConnection Diagrams
1.2 GCoordination Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 54 PAGES
23 05 15 1.2 GFabrication Drawings
3.1 GInstallation Drawings
SD-03 Product Data
2.2 GPipe and Fittings
2.3 GPiping Specialties
2.4 GValves
2.5 GMiscellaneous Materials
2.6 GSupporting Elements
1.2 GEquipment Foundation Data
SD-04 Samples
1.2 GManufacturer's Standard Color
Charts
SD-05 Design Data
2.2 GPipe and Fittings
2.3 GPiping Specialties
2.4 GValves
SD-06 Test Reports
3.1 GHydrostatic Tests
3.1 GAir Tests
3.1 GValve-Operating Tests
3.1 GDrainage Tests
3.1 GPneumatic Tests
3.1 GNon-Destructive Electric Tests
3.1 GSystem Operation Tests
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 54 PAGES
23 05 15 1.4.2 GRecord of Satisfactory Field
Operation
1.4.3 GList of Qualified Permanent
Service Organizations
1.2 GListing of Product Installations
1.2 GRecords of Existing Conditions
3.1 GSurface Resistance
3.1 GShear and Tensile Strengths
3.1 GTemperature Ratings
3.1 GBending Tests
3.1 GFlattening Tests
3.1 GTransverse Guided Weld Bend
Tests
SD-10 Operation and Maintenance
Data
3.12 GOperation and Maintenance
Manuals
23 05 48.00 40 SD-02 Shop Drawings
1.2 GInstallation Drawings
1.2 GOutline Drawings
SD-03 Product Data
1.2 GEquipment and Performance
Data
2.2.9 GIsolators
SD-06 Test Reports
2.4 GType of Isolator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 54 PAGES
23 05 48.00 40 2.4 GType of Base
2.4 GAllowable Deflection
2.4 GMeasured Deflection
23 05 93 SD-01 Preconstruction Submittals
1.3.3 GRecords of Existing Conditions
1.3.3 GRecords of Existing Conditions
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.5.4.2 GTAB Design Review Report
1.7.1.1 GTAB Design Review Report
1.5.9.1 GTAB Firm
1.2 GTAB Team Assistants
1.2 GTAB Team Engineer
1.5.9.2 GTAB Specialist
1.2 GTAB Team Field Leader
SD-02 Shop Drawings
1.3.3 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.1.3 GTAB Related HVAC Submittals
1.5.9.4 GTAB Related HVAC Submittals
1.5.7 GTAB Procedures
1.5.7 GCalibration
1.3.3 GSystems Readiness Check
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 54 PAGES
23 05 93 1.5.10 GTAB Execution
1.5.10.3 GTAB Verification
SD-06 Test Reports
3.3.5 GCompleted Pre-Final DALT
Report
3.3.8 GCertified Final DALT Report
1.5.4.3 GPrerequisite HVAC Work
Checkout List
1.5.4.3 GPrerequisite HVAC Work
Checkout List
1.5.4.3 GPrerequisite HVAC Work
Checkout List
3.4.7.1 GProportional Balancing
3.7 GProportional Balancing
3.4.7.2 GSeason 1
3.7 GSeason 1
3.4.7.2 GSeason 2
3.7 GSeason 2
1.5.4.2 GTAB Design Review Report
1.7.1.1 GTAB Design Review Report
1.5.11.2 GTAB Report for Season 1
1.5.11.2 GTAB Report for Season 2
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 54 PAGES
23 05 93 1.5.4.2 GDALT and TAB Submittal and
Work Schedule
1.7.1 GDALT and TAB Submittal and
Work Schedule
1.5.4.3 GTAB Pre-Field Engineering
Report
1.7.1.3 GTAB Pre-Field Engineering
Report
1.5.6 GInstrument Calibration
Certificates
3.7 GDALT and TAB Procedures
Summary
3.7 GCompleted Pre-Final DALT Work
Checklist
3.3.2 GAdvance Notice of Pre-Final
DALT Field Work
3.4.7.1 GProportional Balancing
3.7 GProportional Balancing
3.4.7.2 GSeason 1
3.7 GSeason 1
3.4.7.2 GSeason 2
3.7 GSeason 2
1.5.9.1 GTAB Firm
1.3.3 GDesign Review Report
1.7.1.2 GPre-field DALT Preliminary
Notification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 54 PAGES
23 05 93 1.5.4.3 GPrerequisite HVAC Work Check
Out List
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.4Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
3.4Equipment Insulation Systems
SD-03 Product Data
2.4 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
SD-04 Samples
2.3.1.3 GThermal Insulation
3.1.1 GDisplay Samples
SD-08 Manufacturer’s Instructions
2.4 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
SD-11 Closeout Submittals
2.1.1 SReduce Volatile Organic
Compounds (VOC)
2.1.2 SRecycled Content
23 09 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 54 PAGES
23 09 00 3.3 GDDC Contractor Design Drawings
3.3 GDraft As-Built Drawings
3.3 GFinal As-Built Drawings
SD-03 Product Data
2.2 GManufacturer's Product Data
SD-06 Test Reports
3.1.1Existing Conditions Report
3.5.2 GStart-Up Testing Report
3.6.1 GPVT Procedures
3.6.3 GPVT Report
1.9.1 GPre-Construction Quality Control
(QC) Checklist
1.9.2 GPost-Construction Quality Control
(QC) Checklist
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
(O&M) Instructions
3.9.1 GTraining Documentation
SD-11 Closeout Submittals
2.5 GEnclosure Keys
3.2.6.1 GPassword Summary Report
1.9.3 GCloseout Quality Control (QC)
Checklist
23 11 25 SD-02 Shop Drawings
1.5.3 GGas Piping System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 54 PAGES
23 11 25 2.2 GGas Piping System
3.3 GGas Piping System
SD-03 Product Data
1.6.1 GPipe and Fittings
1.5.3 GGas Equipment Connectors
1.5.3 GGas Piping System
2.2 GGas Piping System
3.3 GGas Piping System
2.1 GPipe Coating Materials
2.6 GPressure Regulators
2.4 GRisers
2.2.8 GTransition Fittings
2.3 GValves
2.2.4 GWarning and Identification Tape
SD-06 Test Reports
3.18 GTesting
3.18.1 GPressure Tests
3.18.2 GPressure Tests for Liquified
Petroleum Gas
3.18.3 GTest with Gas
SD-07 Certificates
1.5.1 GWelders Procedures and
Qualifications
1.5.1 GAssigned Number, Letter, or
Symbol
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 54 PAGES
23 11 25 1.5.2 GPE Pipe and Fittings
2.1 GPipe Coating Materials
SD-10 Operation and Maintenance
Data
1.3.1 GGas Facility System and
Equipment Operation
1.3.2 GGas Facility System Maintenance
1.3.3 GGas Facility Equipment
Maintenance
23 21 13.00 20 SD-02 Shop Drawings
1.3.1Hot water heating system
SD-03 Product Data
2.3.1Pumps
2.3.2Expansion tanks
2.3.5Flow measuring equipment
2.3.4Backflow preventers
2.3.3External air separation tanks
2.1.1Hot water heating pipe
SD-06 Test Reports
3.3.1Hydrostatic test of piping system
3.3.2Auxiliary equipment and accessory tests
SD-07 Certificates
1.5.4Backflow preventer certification
1.5.2.1Report of prior installations
1.5.2.2Welding procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 54 PAGES
23 21 13.00 20 1.5.2.3Welder's qualifications
23 21 23 SD-02 Shop Drawings
2.1.2 GSystem Coordination
SD-03 Product Data
2.2.2 GInstructions
2.2.5 GEquipment Data
3.5.2 GTraining Period
SD-06 Test Reports
2.8Factory Tests
3.3Field Quality Control
SD-07 Certificates
1.3.1Manufacturer's Representative
SD-10 Operation and Maintenance
Data
3.5.1 GOperation and Maintenance
Manuals
3.5.2 GTraining
23 25 00 SD-03 Product Data
2.5 GWater Analysis
1.6Spare Parts
3.4Field Instructions
3.5 GTests
3.4 GTraining Course
23 52 43.00 20 SD-02 Shop Drawings
1.3.2.2Fuel Train
1.3.2.2Wiring Diagram
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 54 PAGES
23 52 43.00 20 SD-03 Product Data
2.2Boilers
2.4Boiler Trim and Control
Equipment
2.3Burners and Control Equipment
SD-06 Test Reports
3.4.1Operational Tests
1.3.3Water Analysis
SD-07 Certificates
2.2Boilers
2.3Burners and Control Equipment
2.4Boiler Trim and Control
Equipment
SD-08 Manufacturer’s Instructions
2.2Boilers
2.4.7Feedwater Treatment Feeder
SD-10 Operation and Maintenance
Data
2.2Boilers
SD-11 Closeout Submittals
2.1.1 SEnergy Efficient Equipment for
Boilers
2.2boilers
23 64 10 SD-03 Product Data
3.2.3Posted Instructions
1.5.1Verification of Dimensions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 54 PAGES
23 64 10 2.9Factory Tests
3.7System Performance Tests
3.8Demonstrations
3.6.1Water Chiller - Field Acceptance
Test Plan
SD-06 Test Reports
3.6Field Acceptance Testing
3.6.2Field Acceptance Test Report
2.9Factory Tests
3.7System Performance Tests
SD-07 Certificates
3.2.8…