Attachment_13_B988_Questions_ _Answers.docx

DOCX document 16 KB Posted

Attached to
DB Repair /Replace CS Facility Roof B-988 Federal contract opportunity
Solicitation number
FA4460-16-R-0006
Issued by
Department of the Air Force Air Mobility Command

About this file

Attachment 13 Contractor questions and answers

View the file

Other files for this federal contract opportunity

Other files attached to DB Repair /Replace CS Facility Roof B-988, newest first.
File Type Posted
Amendment_4.pdf PDF
Attachment_1_B-988_SOW_Rev_1.docx DOCX document
20_Apr_sign_in.pdf PDF
26_Apr_sign_in.pdf PDF
Amendment_3.pdf PDF
Attachment_4_C D_Report.pdf PDF
Amendment_1.pdf PDF
Attachment_2_B-988_Sector_Report_May_2003.pdf PDF
Attachment_11_Client_Authorization_Letter.pdf PDF
Attachment_9_EMIS_Instruction_Guide.pdf PDF
Attachment_5_Material_Submittal_Schedule.pdf PDF
Little_Rock_Air_Force_Base_Architectural_Design_Guide_Supplement.pdf PDF
Attachment_7_Past_Performance_Questionnare.pdf PDF
Attachment_1_NKAK_06-1060A__D-B_Statement_of_Work.pdf PDF
Attachment_3_Environmental_MOA.pdf PDF
Attachment_10_Wage_Determination_AR160132.pdf PDF
Attachment_6_LRAFB_Information.pdf PDF
00c_LRAFB_Civil_Design_Criteria.doc DOC document
Amendment_2.pdf PDF
Attachment_8_RESPONSIBILITY-1.pdf PDF
Attachment_12_Contractor_Responsibility_Letter.pdf PDF
FA4460-16-R-0006.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NKAK 06-1060A

REPAIR / REPLACE CS FACILITY ROOF, BLDG 988

PRE-BID QUESTIONS

09 May 2016 The following questions refer to Section 011001-Statement of Work for Design-Build:

1. The SOW does not address the preferred appearance of the roof shape, other than slope and overhang dimension. Is there any guidance, such as hipped, gabled, combination hip-gables?

a. A hip roof with gabled canopies at entrances would be acceptable. Gables or gabled vents could also be used where required for equipment ventilation, etc.

2. Paragraph 2.03.B.9 requires the slope of the proposed new metal roof to be 4/12. This is a large building approx. 144’ wide in the narrowest direction. The existing building is approx. 15’-0” in height from the finish floor. With this minimum angle of slope, the height of the roof would be approx. 24’-0” above the existing building. While the physical weight may or may not be a concern, the wind loading is a much greater factor as the height increases. Is it possible to consider a lower slope, such as 1/12 or 2/12? (This would be in compliance with 3.4.7 of the 2006 LRAFB Architectural Compatibility Guide).

a. No, a lower roof slope would not be acceptable due to the appearance, location, and number of roof top mounted equipment. Please retain the 4:12 slope.

3. May the required insulation be installed on top of the roof deck?

a. Not sure what this reference to insulation is for. Are you addressing a particular paragraph or all insulation requirements in the SOW? During the last renovation the building envelope was reinforced by spraying insulation on the underside of the roof deck, so R-38 insulation is not needed for the envelope. Is this to prevent condensation on the roof panels? Then yes.

4. Paragraph 2.06 indicates that the attic is not required to be sprinkled. Is this correct? If fire sprinkling is required, would a fire protection engineer be required?

a. Yes, the attic should be fully protected with a dry pipe fire suppression system. (No heat detectors)

5. It appears there has been a brand new entrance canopy constructed over the entrance of the post office. Is this new canopy to be demolished and a new built in its place? If not where does the 2nd canopy go? 1.) There is a canopy (covered walkway) between 988 and another building. If the roof will overhang 2’, the canopy will interfere. What do you want us to do with the canopy?

a. The new canopy at the Post Office is to remain.

b. All canopies across the front of the building are to be replaced with the exception of the Post Office Canopy. So there will be three new canopies.

c. The Design Build firm shall provide a design that takes into consideration all existing features such as the canopy, different roof heights, etc.

6. Are we to design around the new piping on roof to wall to remote equipment?

a. Yes.

7. Is the service dock lower canopy roof included in our scope? It is the same roof with the same material as the main roof.

a. Yes, the lower canopy roof at the loading dock is incorporated into the SOW.

b. Yes, the lower canopy roof shall be the same material as the main roof.