FA4460-16-B-0006_Questions_and_Answers.docx

DOCX document 16 KB Posted

Attached to
Multi facility roofing design/build Federal contract opportunity
Solicitation number
FA4460-16-B-0006
Issued by
Department of the Air Force Air Mobility Command

About this file

Answers to RFIs.

View the file

Other files for this federal contract opportunity

Other files attached to Multi facility roofing design/build, newest first.
File Type Posted
mla9ba01_Layout1_(1).pdf PDF
MLA90A02_Model_(1).pdf PDF
MLA90A06_Model_(1).pdf PDF
FA4460-16-B-0006-0002.pdf PDF
FA4460-16-B-0006-0001.doc DOC document
Attachment_2_-_EMIS_Instruction_Guide.doc DOC document
364_Asbuilts.pdf PDF
Attachment_5_-_Material_Submittal_Schedule.pdf PDF
FA4460-16-B-0006_Released.doc DOC document
Attachment_9_-_Wage_Determination_AR160132.docx DOCX document
295_Asbuilts.pdf PDF
554_Asbuilts.pdf PDF
Attachment_4_-_C D_Report.doc DOC document
Attachment_3_-_Environmental_MOA.doc DOC document
Attachment_7_-_LRAFB_Design_Criteria_Combined.pdf PDF
Attachment_1_-_Statement_of_Work_NKAK_13-1043.docx DOCX document
Attachment_6_-_LRAFB_Information.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4460-16-B-0006

Questions and Answers

1. Paragraph 2.03.B.1.j requires a roof slope no less than 4:12. It is the intent that B-295, 364, and 553 be reroofed at the same roof pitch as the existing framework?

ANSWER: Match existing roof pitch for B-295, 364, and 554.

2. Is a vapor retarder required to be installed above the ceiling of bldgs. 295, 364, and 554 as per paragraph 2.03.B.1.w of the SOW? Is this directly on the ceiling panels? Or should be placed between the existing roof panels and new roof panels?

ANSWER: A vapor retarder is still required on the new retrofit roofing system, not on the existing roof.

3. Are there any specific requirements for the lightning protection, such as certifications?

ANSWER: Please see section 01 10 01 paragraph 2.07 for lightning protection details required. Yes a certification is required.

4. Is an economic analysis as described in paragraph 5.04.B required?

ANSWER: Economic analysis is not required.

5. Is a Structural Interior Design Package as described in paragraph 5.06 required?

ANSWER: Structural Interior Design Package is not required.

6. Will the Government require phasing of the buildings or can all three be worked at the same time?

ANSWER: The contractor can work on one or all three at the same time. Phasing is not required.

7. Are as-builts available for Bldg 295?

ANSWER: Drawings for this building will be included in a subsequent amendment.