FA4460-16-B-0006_Questions_and_Answers.docx
DOCX document 16 KB Posted
- Attached to
- Multi facility roofing design/build Federal contract opportunity
- Solicitation number
- FA4460-16-B-0006
About this file
Answers to RFIs.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| mla9ba01_Layout1_(1).pdf | ||
| MLA90A02_Model_(1).pdf | ||
| MLA90A06_Model_(1).pdf | ||
| FA4460-16-B-0006-0002.pdf | ||
| FA4460-16-B-0006-0001.doc | DOC document | |
| Attachment_2_-_EMIS_Instruction_Guide.doc | DOC document | |
| 364_Asbuilts.pdf | ||
| Attachment_5_-_Material_Submittal_Schedule.pdf | ||
| FA4460-16-B-0006_Released.doc | DOC document | |
| Attachment_9_-_Wage_Determination_AR160132.docx | DOCX document | |
| 295_Asbuilts.pdf | ||
| 554_Asbuilts.pdf | ||
| Attachment_4_-_C D_Report.doc | DOC document | |
| Attachment_3_-_Environmental_MOA.doc | DOC document | |
| Attachment_7_-_LRAFB_Design_Criteria_Combined.pdf | ||
| Attachment_1_-_Statement_of_Work_NKAK_13-1043.docx | DOCX document | |
| Attachment_6_-_LRAFB_Information.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4460-16-B-0006
Questions and Answers
1. Paragraph 2.03.B.1.j requires a roof slope no less than 4:12. It is the intent that B-295, 364, and 553 be reroofed at the same roof pitch as the existing framework?
ANSWER: Match existing roof pitch for B-295, 364, and 554.
2. Is a vapor retarder required to be installed above the ceiling of bldgs. 295, 364, and 554 as per paragraph 2.03.B.1.w of the SOW? Is this directly on the ceiling panels? Or should be placed between the existing roof panels and new roof panels?
ANSWER: A vapor retarder is still required on the new retrofit roofing system, not on the existing roof.
3. Are there any specific requirements for the lightning protection, such as certifications?
ANSWER: Please see section 01 10 01 paragraph 2.07 for lightning protection details required. Yes a certification is required.
4. Is an economic analysis as described in paragraph 5.04.B required?
ANSWER: Economic analysis is not required.
5. Is a Structural Interior Design Package as described in paragraph 5.06 required?
ANSWER: Structural Interior Design Package is not required.
6. Will the Government require phasing of the buildings or can all three be worked at the same time?
ANSWER: The contractor can work on one or all three at the same time. Phasing is not required.
7. Are as-builts available for Bldg 295?
ANSWER: Drawings for this building will be included in a subsequent amendment.