FA4452-16-R-0006-0002_Amend.pdf

PDF 841 KB Posted

Attached to
Special Departure Procedures Federal contract opportunity
Solicitation number
FA4452-16-R-0011
Issued by
Department of the Air Force Air Mobility Command

About this file

Amendment to RFPFA4452-16-R-0006 Special Departure Procedures(Amendment Summary)

View the file

Other files for this federal contract opportunity

Other files attached to Special Departure Procedures, newest first.
File Type Posted
J A_Redacted.pdf PDF
FA4452-16-R-0006-0003_Amend3.doc DOC document
FA4452-16-R-0006-0003_Conf.doc DOC document
FA4452-16-R-0006-0002_Conf.pdf PDF
FA4452-16-R-0006-0001_Mod.pdf PDF
FA4452-16-R-0006-0001_Amendment_Conformed.pdf PDF
Exhibit_A-AD.pdf PDF
Attach_1_QASP_SDP.docx DOCX document
FA4452-16-R-0006SDPSolicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Delete CLIN's for C-12 C/D SDP Subscriptions, CLIN 0009, 1009, 2009, 3009, and 4009.

2. Change Period of Performance for all CLINs

3. Revise Performance Work Statement, as follow s:

Remove "Contractor Manpow er Reporting" Paragraph 1.5.19.

Update Appendix B, removing 18 C-12 C/D MDS

4. Revised Provisions and Clauses, as follow s:

Updated - 52.229-4, 252.204-7008 (Latest Version Dec 2015), & 252.204-7012

Edited - 52.212-4 removed "h"

Edited - 52.212-5 removed 52.219-16, 52.239-1, 52.222-41, 52.222-42, 52.222-43, 52.222-44, & 52.222-55

1. CONTRACT ID CODE PAGE OF PAGES

J 1 60

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-May-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4452-16-R-0006

X 9B. DATED (SEE ITEM 11)

07-Apr-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-May-2016

CODE

763 SCONS

507 SYMINGTON DR, RM W202

SCOTT AFB IL 62225-5022

FA4452 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4452-16-R-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 25-Apr-2016 04:00 PM to 03-Jun-

2016 04:00 PM.

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from The contractor shall provide Special Departure

Procedures, recurring and ad hoc, for the C-5A,B, & C IAW Performance Work Statement. Period of Performance spans 15 Jun 2016 to 14 Jun 2017. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-5A,B, & C IAW Performance Work Statement. Period of Performance spans 15 Sep 2016 to 14 Sep

2017..

CLIN 0002

Procedures, recurring and ad hoc, for the C-5M IAW Performance Work Statement. Period of Performance spans

15 Jun 2016 to 14 Jun 2017. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-5M IAW Performance Work Statement. Period of Performance spans 15 Sep 2016 to 14 Sep 2017..

CLIN 0003

Procedures, recurring and ad hoc, for the KC-10A IAW Performance Work Statement. Period of Performance spans

15 Jun 2016 to 14 Jun 2017. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the KC-10A IAW Performance Work Statement. Period of Performance spans 15 Sep 2016 to 14 Sep 2017..

CLIN 0004

Procedures, recurring and ad hoc, for the C-17 IAW Performance Work Statement. Period of Performance spans 15

Jun 2016 to 14 Jun 2017. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the

C-17 IAW Performance Work Statement. Period of Performance spans 15 Sep 2016 to 14 Sep 2017..

CLIN 0005

Procedures, recurring and ad hoc, for the KC-135R IAW Performance Work Statement. Period of Performance spans 15 Jun 2016 to 14 Jun 2017. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the KC-135R IAW Performance Work Statement. Period of Performance spans 15 Sep 2016 to 14 Sep

2017..

CLIN 0006

Procedures, recurring and ad hoc, for the C-130H1, H2, H2.5 & H3 IAW Performance Work Statement. Period of

Performance spans 15 Jun 2016 to 14 Jun 2017. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-130H1, H2, H2.5 & H3 IAW Performance Work Statement. Period of Performance spans 15 Sep 2016 to 14 Sep 2017..

CLIN 0007

Procedures, recurring and ad hoc, for the C-37A IAW Performance Work Statement. Period of Performance spans

15 Jun 2016 to 14 Jun 2017. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-37A IAW Performance Work Statement. Period of Performance spans 15 Sep 2016 to 14 Sep 2017..

CLIN 0008

Procedures, recurring and ad hoc, for the C-21A IAW Performance Work Statement. Period of Performance spans

15 Jun 2016 to 14 Jun 2017. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-21A IAW Performance Work Statement. Period of Performance spans 15 Sep 2016 to 14 Sep 2017..

CLIN 0009

The CLIN type priced has been deleted.

The CLIN description has changed from C-12C/D SDP Subscription to RESERVED.

The CLIN extended description has changed from The contractor shall provide Special Departure

Procedures, recurring and ad hoc, for the C-12C & D IAW Performance Work Statement. Period of Performance spans 15 Jun 2016 to 14 Jun 2017. to ..

The pricing detail quantity 12.00 has been deleted.

The unit of issue Months has been deleted.

The signal code A has been deleted.

The FOB Destination has been deleted.

The FSC code V227 has been deleted.

The PROG code S10 has been deleted.

The SIC code 4581 has been deleted.

The NAICS code 541360 has been deleted.

The MDAP/MAIS Code 000 has been deleted.

CLIN 0011

Procedures, recurring and ad hoc, for the RC-26B IAW Performance Work Statement. Period of Performance spans

15 Jun 2016 to 14 Jun 2017. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the RC-26B IAW Performance Work Statement. Period of Performance spans 15 Sep 2016 to 14 Sep 2017..

CLIN 0012

Procedures, recurring and ad hoc, for the E-3 IAW Performance Work Statement. Period of Performance spans 15

Jun 2016 to 14 Jun 2017. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the

E-3 IAW Performance Work Statement. Period of Performance spans 15 Sep 2016 to 14 Sep 2017..

CLIN 0013

The CLIN extended description has changed from This CLIN represents the not seperately priced Data

Deliverables as specified and IAW Exhibit A-Contract Data Requirements List and Performance Work Statement.

Pricing for Data Deliverables shall be included in CLIN 0001-0012. Period of Performance spans 15 Jun 2016 to 14

Jun 2017. to This CLIN represents the not seperately priced Data Deliverables as specified and IAW Exhibit A-

Contract Data Requirements List and Performance Work Statement. Pricing for Data Deliverables shall be included in CLIN 0001-0012. Period of Performance spans 15 Sep 2016 to 14 Sep 2017..

CLIN 0014

The CLIN extended description has changed from The contractor shall provide SCAP module updates when small changes to AFMs and TOs require no more than 100 man-hours of effort to complete IAW Performance

Work Statement Paragraph 1.5.14. Pricing for updates shall be included in CLIN 0001 - 0012. Period of

Performance spans 15 Jun 2016 to 14 Jun 2017. to The contractor shall provide SCAP module updates when small changes to AFMs and TOs require no more than 100 man-hours of effort to complete IAW Performance Work

Statement Paragraph 1.5.14. Pricing for updates shall be included in CLIN 0001 - 0012. Period of Performance spans 15 Sep 2016 to 14 Sep 2017..

CLIN 1001

Procedures, recurring and ad hoc, for the C-5A,B, & C IAW Performance Work Statement. Period of Performance spans 15 Jun 2017 to 14 Jun 2018. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-5A,B, & C IAW Performance Work Statement. Period of Performance spans 15 Sep 2017 to 14 Sep

2018..

CLIN 1002

Procedures, recurring and ad hoc, for the C-5M IAW Performance Work Statement. Period of Performance spans

15 Jun 2017 to 14 Jun 2018. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-5M IAW Performance Work Statement. Period of Performance spans 15 Sep 2017 to 14 Sep 2018..

CLIN 1003

Procedures, recurring and ad hoc, for the KC-10A IAW Performance Work Statement. Period of Performance spans 15 Jun 2017 to 14 Jun 2018. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the KC-10A IAW Performance Work Statement. Period of Performance spans 15 Sep 2017 to 14 Sep

CLIN 1004

Procedures, recurring and ad hoc, for the C-17 IAW Performance Work Statement. Period of Performance spans 15

Jun 2017 to 14 Jun 2018. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the

C-17 IAW Performance Work Statement. Period of Performance spans 15 Sep 2017 to 14 Sep 2018..

CLIN 1005

Procedures, recurring and ad hoc, for the KC-135R IAW Performance Work Statement. Period of Performance spans 15 Jun 2017 to 14 Jun 2018. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the KC-135R IAW Performance Work Statement. Period of Performance spans 15 Sep 2017 to 14 Sep

CLIN 1006

Procedures, recurring and ad hoc, for the C-130H1, H2, H2.5 & H3 IAW Performance Work Statement. Period of

Performance spans 15 Jun 2017 to 14 Jun 2018. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-130H1, H2, H2.5 & H3 IAW Performance Work Statement. Period of Performance spans 15 Sep 2017 to 14 Sep 2018..

CLIN 1007

Procedures, recurring and ad hoc, for the C-37A IAW Performance Work Statement. Period of Performance spans

15 Jun 2017 to 14 Jun 2018. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-37A IAW Performance Work Statement. Period of Performance spans 15 Sep 2017 to 14 Sep 2018..

CLIN 1008

Procedures, recurring and ad hoc, for the C-21A IAW Performance Work Statement. Period of Performance spans

15 Jun 2017 to 14 Jun 2018. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-21A IAW Performance Work Statement. Period of Performance spans 15 Sep 2017 to 14 Sep 2018..

CLIN 1009

The CLIN description has changed from C-12C/D SDP Subscription to RESERVED.

The CLIN extended description has changed from The contractor shall provide Special Departure

Procedures, recurring and ad hoc, for the C-12C & D IAW Performance Work Statement. Period of Performance spans 15 Jun 2017 to 14 Jun 2018. to ..

The pricing detail quantity 12.00 has been deleted.

The unit of issue Months has been deleted.

The signal code A has been deleted.

The FOB Destination has been deleted.

The FSC code V227 has been deleted.

The PROG code S10 has been deleted.

The SIC code 4581 has been deleted.

CLIN 1011

Procedures, recurring and ad hoc, for the RC-26B IAW Performance Work Statement. Period of Performance spans 15 Jun 2017 to 14 Jun 2018. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the RC-26B IAW Performance Work Statement. Period of Performance spans 15 Sep 2017 to 14 Sep

CLIN 1012

Procedures, recurring and ad hoc, for the E-3 IAW Performance Work Statement. Period of Performance spans 15

Jun 2017 to 14 Jun 2018. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the

E-3 IAW Performance Work Statement. Period of Performance spans 15 Sep 2017 to 14 Sep 2018..

CLIN 1013

Deliverables as specified and IAW Exhibit A-Contract Data Requirements List and Performance Work Statement.

Pricing for Data Deliverables shall be included in CLIN 1001-1012. Period of Performance spans 15 Jun 2017 to 14

Jun 2018. to This CLIN represents the not seperately priced Data Deliverables as specified and IAW Exhibit A-

Contract Data Requirements List and Performance Work Statement. Pricing for Data Deliverables shall be included in CLIN 1001-1012. Period of Performance spans 15 Sep 2017 to 14 Sep 2018..

CLIN 1014

when small changes to AFMs and TOs require no more than 100 man-hours of effort to complete IAW Performance

Work Statement Paragraph 1.5.14. Pricing for updates shall be included in CLIN 1001 - 1012. Period of

Performance spans 15 Jun 2017 to 14 Jun 2018. to The contractor shall provide SCAP module updates when small changes to AFMs and TOs require no more than 100 man-hours of effort to complete IAW Performance Work

Statement Paragraph 1.5.14. Pricing for updates shall be included in CLIN 1001 - 1012. Period of Performance spans 15 Sep 2017 to 14 Sep 2018..

CLIN 2001

Procedures, recurring and ad hoc, for the C-5A,B, & C IAW Performance Work Statement. Period of Performance spans 15 Jun 2018 to 14 Jun 2019. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-5A,B, & C IAW Performance Work Statement. Period of Performance spans 15 Sep 2018 to 14 Sep

2019..

CLIN 2002

Procedures, recurring and ad hoc, for the C-5M IAW Performance Work Statement. Period of Performance spans

15 Jun 2018 to 14 Jun 2019. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-5M IAW Performance Work Statement. Period of Performance spans 15 Sep 2018 to 14 Sep 2019..

CLIN 2003

Procedures, recurring and ad hoc, for the KC-10A IAW Performance Work Statement. Period of Performance spans 15 Jun 2018 to 14 Jun 2019. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the KC-10A IAW Performance Work Statement. Period of Performance spans 15 Sep 2018 to 14 Sep

CLIN 2004

Procedures, recurring and ad hoc, for the C-17 IAW Performance Work Statement. Period of Performance spans 15

Jun 2018 to 14 Jun 2019. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the

C-17 IAW Performance Work Statement. Period of Performance spans 15 Sep 2018 to 14 Sep 2019..

CLIN 2005

Procedures, recurring and ad hoc, for the KC-135R IAW Performance Work Statement. Period of Performance spans 15 Jun 2018 to 14 Jun 2019. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the KC-135R IAW Performance Work Statement. Period of Performance spans 15 Sep 2018 to 14 Sep

CLIN 2006

Procedures, recurring and ad hoc, for the C-130H1, H2, H2.5 & H3 IAW Performance Work Statement. Period of

Performance spans 15 Jun 2018 to 14 Jun 2019. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-130H1, H2, H2.5 & H3 IAW Performance Work Statement. Period of Performance spans 15 Sep 2018 to 14 Sep 2019..

CLIN 2007

Procedures, recurring and ad hoc, for the C-37A IAW Performance Work Statement. Period of Performance spans

15 Jun 2018 to 14 Jun 2019. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-37A IAW Performance Work Statement. Period of Performance spans 15 Sep 2018 to 14 Sep 2019..

CLIN 2008

Procedures, recurring and ad hoc, for the C-21A IAW Performance Work Statement. Period of Performance spans

15 Jun 2018 to 14 Jun 2019. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-21A IAW Performance Work Statement. Period of Performance spans 15 Sep 2018 to 14 Sep 2019..

CLIN 2009

The CLIN description has changed from C-12C/D SDP Subscription to RESERVED.

The CLIN extended description has changed from The contractor shall provide Special Departure

Procedures, recurring and ad hoc, for the C-12C & D IAW Performance Work Statement. Period of Performance spans 15 Jun 2018 to 14 Jun 2019. to ..

The pricing detail quantity 12.00 has been deleted.

The unit of issue Months has been deleted.

The signal code A has been deleted.

The FOB Destination has been deleted.

The FSC code V227 has been deleted.

The PROG code S10 has been deleted.

The SIC code 4581 has been deleted.

CLIN 2011

Procedures, recurring and ad hoc, for the RC-26B IAW Performance Work Statement. Period of Performance spans

15 Jun 2018 to 14 Jun 2019. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the RC-26B IAW Performance Work Statement. Period of Performance spans 15 Sep 2018 to 14 Sep 2019..

CLIN 2012

Procedures, recurring and ad hoc, for the E-3 IAW Performance Work Statement. Period of Performance spans 15

Jun 2018 to 14 Jun 2019. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the

E-3 IAW Performance Work Statement. Period of Performance spans 15 Sep 2018 to 14 Sep 2019..

CLIN 2013

Deliverables as specified and IAW Exhibit A-Contract Data Requirements List and Performance Work Statement.

Pricing for Data Deliverables shall be included in CLIN 2001-2012. Period of Performance spans 15 Jun 2018 to 14

Jun 2019. to This CLIN represents the not seperately priced Data Deliverables as specified and IAW Exhibit A-

Contract Data Requirements List and Performance Work Statement. Pricing for Data Deliverables shall be included in CLIN 2001-2012. Period of Performance spans 15 Sep 2018 to 14 Sep 2019..

CLIN 2014

when small changes to AFMs and TOs require no more than 100 man-hours of effort to complete IAW Performance

Work Statement Paragraph 1.5.14. Pricing for updates shall be included in CLIN 2001 - 2012. Period of

Performance spans 15 Jun 2018 to 14 Jun 2019. to The contractor shall provide SCAP module updates when small changes to AFMs and TOs require no more than 100 man-hours of effort to complete IAW Performance Work

Statement Paragraph 1.5.14. Pricing for updates shall be included in CLIN 2001 - 2012. Period of Performance spans 15 Sep 2018 to 14 Sep 2019..

CLIN 3001

Procedures, recurring and ad hoc, for the C-5A,B, & C IAW Performance Work Statement. Period of Performance spans 15 Jun 2019 to 14 Jun 2020. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-5A,B, & C IAW Performance Work Statement. Period of Performance spans 15 Sep 2019 to 14 Sep

2020..

CLIN 3002

Procedures, recurring and ad hoc, for the C-5M IAW Performance Work Statement. Period of Performance spans

15 Jun 2019 to 14 Jun 2020. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-5M IAW Performance Work Statement. Period of Performance spans 15 Sep 2019 to 14 Sep 2020..

CLIN 3003

Procedures, recurring and ad hoc, for the KC-10A IAW Performance Work Statement. Period of Performance spans 15 Jun 2019 to 14 Jun 2020. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the KC-10A IAW Performance Work Statement. Period of Performance spans 15 Sep 2019 to 14 Sep

CLIN 3004

Procedures, recurring and ad hoc, for the C-17 IAW Performance Work Statement. Period of Performance spans 15

Jun 2019 to 14 Jun 2020. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the

C-17 IAW Performance Work Statement. Period of Performance spans 15 Sep 2019 to 14 Sep 2020..

CLIN 3005

Procedures, recurring and ad hoc, for the KC-135R IAW Performance Work Statement. Period of Performance spans 15 Jun 2019 to 14 Jun 2020. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the KC-135R IAW Performance Work Statement. Period of Performance spans 15 Sep 2019 to 14 Sep

CLIN 3006

Procedures, recurring and ad hoc, for the C-130H1, H2, H2.5 & H3 IAW Performance Work Statement. Period of

Performance spans 15 Jun 2019 to 14 Jun 2020. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-130H1, H2, H2.5 & H3 IAW Performance Work Statement. Period of Performance spans 15 Sep 2019 to 14 Sep 2020..

CLIN 3007

Procedures, recurring and ad hoc, for the C-37A IAW Performance Work Statement. Period of Performance spans

15 Jun 2019 to 14 Jun 2020. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-37A IAW Performance Work Statement. Period of Performance spans 15 Sep 2019 to 14 Sep 2020..

CLIN 3008

Procedures, recurring and ad hoc, for the C-21A IAW Performance Work Statement. Period of Performance spans

15 Jun 2019 to 14 Jun 2020. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-21A IAW Performance Work Statement. Period of Performance spans 15 Sep 2019 to 14 Sep 2020..

CLIN 3009

The CLIN description has changed from C-12C/D SDP Subscription to RESERVED.

The CLIN extended description has changed from The contractor shall provide Special Departure

Procedures, recurring and ad hoc, for the C-12C & D IAW Performance Work Statement. Period of Performance spans 15 Jun 2019 to 14 Jun 2020. to ..

The pricing detail quantity 12.00 has been deleted.

The unit of issue Months has been deleted.

The signal code A has been deleted.

The FOB Destination has been deleted.

The FSC code V227 has been deleted.

The PROG code S10 has been deleted.

The SIC code 4581 has been deleted.

CLIN 3011

Procedures, recurring and ad hoc, for the RC-26B IAW Performance Work Statement. Period of Performance spans 15 Jun 2019 to 14 Jun 2020. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the RC-26B IAW Performance Work Statement. Period of Performance spans 15 Sep 2019 to 14 Sep

CLIN 3012

Procedures, recurring and ad hoc, for the E-3 IAW Performance Work Statement. Period of Performance spans 15

Jun 2019 to 14 Jun 2020. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the

E-3 IAW Performance Work Statement. Period of Performance spans 15 Sep 2019 to 14 Sep 2020..

CLIN 3013

Deliverables as specified and IAW Exhibit A-Contract Data Requirements List and Performance Work Statement.

Pricing for Data Deliverables shall be included in CLIN 3001-3012. Period of Performance spans 15 Jun 2019 to 14

Jun 2020. to This CLIN represents the not seperately priced Data Deliverables as specified and IAW Exhibit A-

Contract Data Requirements List and Performance Work Statement. Pricing for Data Deliverables shall be included in CLIN 3001-3012. Period of Performance spans 15 Sep 2019 to 14 Sep 2020..

CLIN 3014

when small changes to AFMs and TOs require no more than 100 man-hours of effort to complete IAW Performance

Work Statement Paragraph 1.5.14. Pricing for updates shall be included in CLIN 3001 - 3012. Period of

Performance spans 15 Jun 2019 to 14 Jun 2020. to The contractor shall provide SCAP module updates when small changes to AFMs and TOs require no more than 100 man-hours of effort to complete IAW Performance Work

Statement Paragraph 1.5.14. Pricing for updates shall be included in CLIN 3001 - 3012. Period of Performance spans 15 Sep 2019 to 14 Sep 2020..

CLIN 4001

Procedures, recurring and ad hoc, for the C-5A,B, & C IAW Performance Work Statement. Period of Performance spans 15 Jun 2020 to 14 Jun 2021. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-5A,B, & C IAW Performance Work Statement. Period of Performance spans 15 Sep 2020 to 14 Sep

2021..

CLIN 4002

Procedures, recurring and ad hoc, for the C-5M IAW Performance Work Statement. Period of Performance spans

15 Jun 2020 to 14 Jun 2021. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-5M IAW Performance Work Statement. Period of Performance spans 15 Sep 2020 to 14 Sep 2021..

CLIN 4003

Procedures, recurring and ad hoc, for the KC-10A IAW Performance Work Statement. Period of Performance spans 15 Jun 2020 to 14 Jun 2021. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the KC-10A IAW Performance Work Statement. Period of Performance spans 15 Sep 2020 to 14 Sep

CLIN 4004

Procedures, recurring and ad hoc, for the C-17 IAW Performance Work Statement. Period of Performance spans 15

Jun 2020 to 14 Jun 2021. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the

C-17 IAW Performance Work Statement. Period of Performance spans 15 Sep 2020 to 14 Sep 2021..

CLIN 4005

Procedures, recurring and ad hoc, for the KC-135R IAW Performance Work Statement. Period of Performance spans 15 Jun 2020 to 14 Jun 2021. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the KC-135R IAW Performance Work Statement. Period of Performance spans 15 Sep 2020 to 14 Sep

CLIN 4006

Procedures, recurring and ad hoc, for the C-130H1, H2, H2.5 & H3 IAW Performance Work Statement. Period of

Performance spans 15 Jun 2020 to 14 Jun 2021. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-130H1, H2, H2.5 & H3 IAW Performance Work Statement. Period of Performance spans 15 Sep 2020 to 14 Sep 2021..

CLIN 4007

Procedures, recurring and ad hoc, for the C-37A IAW Performance Work Statement. Period of Performance spans

15 Jun 2020 to 14 Jun 2021. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-37A IAW Performance Work Statement. Period of Performance spans 15 Sep 2020 to 14 Sep 2021..

CLIN 4008

Procedures, recurring and ad hoc, for the C-21A IAW Performance Work Statement. Period of Performance spans

15 Jun 2020 to 14 Jun 2021. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the C-21A IAW Performance Work Statement. Period of Performance spans 15 Sep 2020 to 14 Sep 2021..

CLIN 4009

The CLIN description has changed from C-12C/D SDP Subscription to RESERVED.

The CLIN extended description has changed from The contractor shall provide Special Departure

Procedures, recurring and ad hoc, for the C-12C & D IAW Performance Work Statement. Period of Performance spans 15 Jun 2020 to 14 Jun 2021. to .

The pricing detail quantity 12.00 has been deleted.

The unit of issue Months has been deleted.

The signal code A has been deleted.

The FOB Destination has been deleted.

The FSC code V227 has been deleted.

The PROG code S10 has been deleted.

The SIC code 4581 has been deleted.

CLIN 4011

Procedures, recurring and ad hoc, for the RC-26B IAW Performance Work Statement. Period of Performance spans

15 Jun 2020 to 14 Jun 2021. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the RC-26B IAW Performance Work Statement. Period of Performance spans 15 Sep 2020 to 14 Sep 2021..

CLIN 4012

Procedures, recurring and ad hoc, for the E-3 IAW Performance Work Statement. Period of Performance spans 15

Jun 2020 to 14 Jun 2021. to The contractor shall provide Special Departure Procedures, recurring and ad hoc, for the

E-3 IAW Performance Work Statement. Period of Performance spans 15 Sep 2020 to 14 Sep 2021..

CLIN 4013

Deliverables as specified and IAW Exhibit A-Contract Data Requirements List and Performance Work Statement.

Pricing for Data Deliverables shall be included in CLIN 4001-4012. Period of Performance spans 15 Jun 2020 to 14

Jun 2021. to This CLIN represents the not seperately priced Data Deliverables as specified and IAW Exhibit A-

Contract Data Requirements List and Performance Work Statement. Pricing for Data Deliverables shall be included in CLIN 4001-4012. Period of Performance spans 15 Sep 2020 to 14 Sep 2021..

CLIN 4014

when small changes to AFMs and TOs require no more than 100 man-hours of effort to complete IAW Performance

Work Statement Paragraph 1.5.14. Pricing for updates shall be included in CLIN 4001 - 4012. Period of

Performance spans 15 Jun 2020 to 14 Jun 2021. to The contractor shall provide SCAP module updates when small changes to AFMs and TOs require no more than 100 man-hours of effort to complete IAW Performance Work

Statement Paragraph 1.5.14. Pricing for updates shall be included in CLIN 4001 - 4012. Period of Performance spans 15 Sep 2020 to 14 Sep 2021..

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

POP 15-JUN-2016 TO

14-JUN-2017

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

FOB: Destination

F3SF38

To:

POP 15-SEP-2016 TO

14-SEP-2017

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

The following Delivery Schedule item for CLIN 0002 has been changed from:

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

The following Delivery Schedule item for CLIN 0003 has been changed from:

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

The following Delivery Schedule item for CLIN 0004 has been changed from:

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

The following Delivery Schedule item for CLIN 0005 has been changed from:

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

The following Delivery Schedule item for CLIN 0006 has been changed from:

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

The following Delivery Schedule item for CLIN 0007 has been changed from:

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

The following Delivery Schedule item for CLIN 0008 has been changed from:

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

The following Delivery Schedule Item has been deleted from CLIN 0009:

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

The following Delivery Schedule item for CLIN 0011 has been changed from:

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

The following Delivery Schedule item for CLIN 0012 has been changed from:

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

The following Delivery Schedule item for CLIN 0013 has been changed from:

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

N/A HQ AMC/A3AR

TIGUE, JOHN

402 SCOTT DRIVE

SCOTT AFB IL 62225

618-229-3325

The following Delivery Schedule item for CLIN 0014 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 1001 has been changed from:

POP 15-JUN-2017 TO

14-JUN-2018

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

POP 15-SEP-2017 TO

14-SEP-2018

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 1002 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 1003 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 1004 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 1005 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 1006 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 1007 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 1008 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule Item has been deleted from CLIN 1009:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 1011 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 1012 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 1013 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 1014 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 2001 has been changed from:

POP 15-JUN-2018 TO

14-JUN-2019

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

POP 15-SEP-2018 TO

14-SEP-2019

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 2002 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 2003 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 2004 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 2005 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 2006 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 2007 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 2008 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule Item has been deleted from CLIN 2009:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 2011 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 2012 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 2013 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 2014 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 3001 has been changed from:

POP 15-JUN-2019 TO

14-JUN-2020

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

POP 15-SEP-2019 TO

14-SEP-2020

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 3002 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 3003 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 3004 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 3005 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 3006 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 3007 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 3008 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule Item has been deleted from CLIN 3009:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 3011 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 3012 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 3013 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 3014 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 4001 has been changed from:

POP 15-JUN-2020 TO

14-JUN-2021

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

POP 15-SEP-2020 TO

14-SEP-2021

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 4002 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 4003 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 4004 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 4005 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 4006 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 4007 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 4008 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule Item has been deleted from CLIN 4009:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 4011 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 4012 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 4013 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following Delivery Schedule item for CLIN 4014 has been changed from:

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

N/A HQ AMC/A3D - F3SF38

JEFFREY HOPKINS

402 SCOTT DRIVE UNIT 3A1

SCOTT AFB IL 62225-5302

618 229-3958

The following have been added by reference:

52.229-4 Federal, State, And Local Taxes (State and Local

Adjustments)

FEB 2013

252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

DEC 2015

252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting.

DEC 2015

The following have been modified:

PERFORMANCE WORK STATEMENT

1.0 INTRODUCTION

1.1 ORGANIZATION

1.1.1 Identification. Air Mobility Command (AMC)/A3. Headquarters AMC/A3 is located at Scott Air Force Base

(SAFB), Illinois.

1.1.2 Mission. AMC/A3 responsibilities are to organize, train and equip air mobility forces to meet global mobility mission.

1.2 BACKGROUND. Air Force Instruction (AFI) 11-202, Vol. 3, Instrument Flight Rules, requires Air Force (AF) aircraft to “…vertically clear all obstacles along the planned route of flight with an engine out.” Special Departure

Procedures (SDPs) are aircraft and location specific contingency procedures and routings that provide aircraft one-engine out departure guidance with verifiable terrain clearance at specified gross weights and takeoff conditions.

SDPs, a standard for air carriers, are essential to the safety of both departing aircraft and the surrounding communities to ensure obstacle clearance in the event of an engine failure and/or similar loss of aircraft performance. Federal Aviation Administration (FAA) Advisory Circular 120-91 Airport Obstacle Analysis covers many aspects of one engine inoperative departure planning.

The International Air Transport Association (IATA) Standard Computerized Aircraft Performance (SCAP) standard has become an airline industry proven method for incorporating aircraft performance into computerized calculations.

The AF has successfully completed a “proof of concept” investigation into integration of SCAP modules with an

SDP path designer tool. This demonstrated the capability to increase Maximum Take-Off Weight (MTOW) while, simultaneously, maintaining safety margins.

1.3 OBJECTIVE. Contractor shall provide all labor, management, analysis, planning programming, administration, training, review, transportation and incidentals necessary for one-engine inoperative departure data in order to maximize aircraft operational weights while providing safe escape routings for specified Mission Design

Series (MDS) aircraft in accordance with (IAW) this Performance Work Statement (PWS). SDP data shall be delivered to the Government via internet access, email or other avenues for direct-to-aircraft data delivery, for retrieval of data for a specified list of airports, runways, aircraft and engine type and takeoff flap settings in order to enhance the Air Force’s ability to safely and effectively conduct operations from these fields.

1.4 SCOPE OF WORK. In the performance of this PWS, the contractor shall design and provide a web-based SDP takeoff performance system for the defined MDS based on each aircraft manufacturer’s performance algorithm, as well as real time derived data to make takeoff calculations. Aircraft requiring SDP subscriptions include C-5A/B/C, C-5M, KC-10, C-17, KC-135, C-130H, C-37A, C-21A, RC-26B and E-3. The government may add new MDS aircraft to the contract list.

1.4.1 On-board Performance Tool (OPT).(OPTIONAL) (The requirement under this task is optional for the base and all follow on years, and shall be executed at the discretion of the Government. If the Government determines that this capability is required, the Government will provide the Contractor with a request for proposal. Upon acceptance of a valid Contractor proposal, the Government will process a modification to the contract. If the

Government deems this requirement necessary, the Contractor will be given at least 30 days before a funding modification is executed.)

The vendor shall have a program in place to provide a self-dispatching capability through fast and precise calculations.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .