PP - BRAG 10-09 Dosimetrist tl cs.doc

DOC document 138 KB Posted

Attached to
Full-Time Dosimetrist Federal contract opportunity
Solicitation number
FA4427-10-R-0012
Issued by
Department of the Air Force Air Mobility Command

About this file

Performance Plan

View the file

Other files for this federal contract opportunity

Other files attached to Full-Time Dosimetrist, newest first.
File Type Posted
QUESTIONS and RESPONSES —
QUESTIONS and RESPONSES - 15 Sep 10.docx DOCX document
Past Performance Questionnaire.pdf PDF
PWS Dosimetrist 31 Aug 10- CS TL IP DBOreview.doc DOC document
FA4427-10-R-0012 - Dosimetrist.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE PLAN

FOR

Dosimetrist Services David Grant Medical Center Travis AFB, CA

11 June 10

TABLE OF CONTENTS

SECTION

TITLE

PAGE

1.

Purpose

2.

Roles and Responsibilities of the Multi-Functional Team

3.

Service Summary and Method of Assessment

4.

Assessment Procedures

5.

Unacceptable Performance

6.

Certification/Acceptance of Services

7.

Contractor’s Quality Control Plan

8.

Contract Management

9.

Performance Management

10.

Quality Assurance Personnel (QAP) Monthly Report

SECTION 1.0.

PURPOSE

1.1. This performance plan has been developed to provide an effective and systematic method to evaluate contractor provided services at David Grant Medical Center (DGMC), Travis AFB, CA. This performance plan implements the requirements of Air Force Instruction 63-124, Performance Based Service Acquisitions (PBSA), with respect to the Government’s quality assurance requirements.

1.2. The objective of this acquisition is to provide Dosimetry services at the MTF. This performance plan is based on the premise that the Contractor is responsible for contract management and quality control, not the Government. The Contractor will provide capable, qualified competent dosimetrist to deliver dosimetry services to DGMC. The results the multi-functional team is striving to achieve in managing the acquisition is to assure delivery of these services meet the stated qualifications, and are available to provide services according to Air Force needs.

1.3. Success for this contract is defined as:

1.3.1. Vendor is successful in meeting service summary objectives.

1.4. This performance plan describes the method(s) used to evaluate contractor provided services in meeting performance objectives and performance thresholds. Quality Assurance Personnel (QAP) will use periodic, 100%, and customer complaint assessment methods to evaluate the contractor’s performance. The assessment procedures identified in this performance plan, in concert with active application of the contractor’s quality control procedures, are intended to ensure acceptable contractor performance.

1.5. The role of Government quality assurance is to ensure contract standards are achieved. In conducting assessment, QAP are to be objective, fair, and consistent in evaluating contractor performance against the performance standards.

1.6. This performance plan is a living document and shall be revised or modified by members of the multi-functional team as circumstances warrant, throughout the life of the contract, to ensure adequate oversight of contractor performance is maintained.

SECTION 2.0.

ROLES AND RESPONSIBILITIES OF THE MULTI-FUNCTIONAL TEAM

2.0. For roles and responsibilities see AFI 63-124, Chapter 2.

2.1. MULTI-FUNCTIONAL TEAM ROLES & RESPONSIBILITIES.

The following government officials will participate in performance management of this contract through use of the Management and Oversight of Acquisition of Services Process (MOASP) and the contractor. Their roles and responsibilities are described as follows:

2.2. QAP/QAE: Is responsible for monitoring, assessing, recording and reporting on contractor compliance with the terms and conditions of the contract. These individuals will have primary responsibility for completing quality assurance monitoring forms that will be used to document the inspection and evaluation of the contractor’s performance. The QAP/QAE will maintain surveillance documentation, notify the Contracting Officer (CO) of any significant performance deficiencies and recommend improvements to the PP and Performance Work Statement (PWS) throughout the life of the acquisition.

2.3. The Contracting Officer (CO): Has overall responsibility for overseeing the contractor’s performance. The CO will also be responsible for the day-to-day monitoring of the contractor’s performance in the areas of contract compliance, contract administration, cost control, and property control; reviewing the QAP/QAE assessment of the contractor’s performance; and resolving all differences between the QAP/QAE version and the contractor’s version of events. The CO is the only person with the authority to direct the contractor in the performance of their duties under the contract and to make interpretations of and changes to the contract. The CO will facilitate BRAG/Multi-functional Team meetings.

2.4. The Functional Commander/Director (FC/FD): Has overall responsibility for developing the PWS and the Performance Plan and ensuring they satisfy mission requirements, are performance-based, foster innovation, and define metrics. The FC/FD will also be responsible to assign competent and capable functional experts to the BRAG/Multi-functional Team who will be available full time or as warranted by the procurement cycle. The FC/FD will also assign, as a minimum, a primary and an alternate QAP/QAE and notify the CO of any changes to this designation. Review contractor performance documentation, prepared by the QAP/QAE on a regular basis to ensure performance is compatible with contract and mission objectives. The FC/FD is also responsible for identifying mission essential services and developing the necessary documents IAW DoDI 3020.37, Continuation of Essential DoD Contractor Services During Crisis.

2.5. The Contracting Squadron Commander (CSC) and/or The Director of Business Operations(DBO): Serves as the Business Advisor to senior leadership; developing and implementing acquisition strategies for services acquisitions; providing oversight of the BRAG/Multi-functional Team in planning, assessing contractor performance, and managing the acquisition throughout the life of the requirement IAW the FAR, DFARS and AAFARS. Also provide Management and Oversight of the Acquisition of Services Process (MOASP) reports on service acquisitions to the MAJCOM for consolidation. The CSC will provide a health of services acquisitions to senior leadership on an annual basis.

2.6. The Quality Assurance Program Coordinator (QAPC): Develops, manages and implements the Travis AFB Quality Assurance Program; supports the BRAG/Multi-Functional Team in the development of contract requirements, ensuring requirements are clearly stated and enforceable; aids in development of the Service Summary (SS) and Performance Plan and provides training to all FC/FD, QAP/QAEs and others that interact with this contract as needed.

2.7. The Contract Administrator (CA): Is the focal point for issues regarding the contract; prepares and processes modifications to the contract; assists the CO in ensuring contractor performance meets contract standards; records and transcribes minutes for meetings.

2.8. CA will perform Quality Assurance (QA) personnel assessment on a periodic basis as determined by the CO. The contract administrator (CA) will verify that the QA is accomplishing their surveillance according to this performance plan. Observation of one or two checks will be sufficient to verify the QA’s procedures. If deficiencies are discovered in the QA surveillance procedures, the contracting officer will notify the FC/FD and provide any assistance the FC/FD may request, such as additional training for QA personnel. The CA will ensure that the QA is documenting their surveillances on a timely basis. A check of the QA files will also be performed on a periodic basis as determined by the CO/CA.

2.9. The Contractor is the service provider and will ensure that a government acceptable quality control system is provided and maintained. The contractor is required to provide all services identified in the PWS

SECTION 3.0.

SERVICE SUMMARY (SS) AND METHOD OF ASSESSMENT

3.1. SERVICES SUMMARY

Performance Objective
Ref
Acceptable Quality Level
Designs a treatment plan in accordance with Radiation oncologist’s prescription
Section I, Para 2, Specific Tasks a, b, c, g
100%
Coordinate/perform treatment simulations, beam modification devise development and production
Section I, Para 2, Specific Tasks, d, e, f,
100%
Supports Physics
Section I, Para 2, Specific Tasks h, i.
100%
Assists in Brachytherapy procedures including planning
Section I, Para 2, Specific Tasks j.
100%
Perform billing and workload collection
Section I, Para 2, Specific Tasks u.
100%

SECTION 4.0.

ASSESSMENT PROCEDURES

4.1. Assessment Schedule.

4.1.1. The QAP will review invoices, fill rates and any customer feedback on a monthly basis.

4.2. Assessment of SS Items.

4.2.1. It is essential that the QAP conduct assessments in accordance with this plan, to ensure an effective quality assurance program. Mission requirements may require deviations from the assessment schedule. Assessment should be performed as close to the schedule as is practicable. QAP shall document assessment as it is conducted.

4.2.2. The QAP shall conduct assessment of the contractor’s performance by determining whether or not the performance meets the standards contained in the contract, the PWS and the SS items.

4.2.3. Assessment documentation shall include as a minimum, the date, time, and location the assessment was conducted, results of the assessment (acceptable or unacceptable), PWS paragraph number referencing the requirement, a short description of the requirement being surveyed, applicable remarks, signature of QAP conducting the assessment. When QAP determine that contractor performance is unacceptable, the specific reason for the unacceptable performance shall be recorded on the QAP’s assessment documentation.

4.3. Assessment of non-SS Items. The Government has the right to inspect all services called for by the contract, to the extent practicable at all times and places during the term of the contract. Therefore, QAP have the right to conduct assessment for SS items and non-SS items as well. When the QAP identifies unacceptable performance on non-SS items, the QAP shall follow the procedures in section 5.0 of this performance plan, entitled Unacceptable Performance.

4.4. Customer Complaints.

4.4.1. QAP shall ensure complaint procedures and forms are made available to all customers. Any personnel that observe questionable services, incomplete, not performed, or performed improperly, should immediately contact the QAP. QAP shall receive, document, and validate or invalidate all complaints. If the complaint is invalid, the QAP shall contact the complainant and explain why the complaint was invalid. QAP shall fully document the resolution for each complaint on the Customer Complaint Record. QAP shall complete and issue the contractor a Corrective Action Report (CAR) (Attachment 1), for all valid complaints. If the Contractor challenges the validity of any complaint, and the QAP and contractor cannot come to agreement, the complaint in question shall be forwarded to the Contracting Officer for resolution. Complaints will be tracked and if the performance threshold is exceeded, the QAP shall notify the Contracting Officer in writing so that the Contracting Officer can notify the physicist and appropriate action can be taken.

4.5. QAP Monthly Report. The QAP shall submit a monthly report to the contract administrator no later than the 10th calendar day of the month following the surveillance period. The report shall be approved by signed by the QAP and approved by the FC. (See Quality Assurance Personnel (QAP) Monthly Report attached.)”. The number of unacceptable performances observed, the number of valid customer complaints, any significant contractor performance discrepancies, and a rating of the Contractor’s overall for the quarter performance. The report shall be signed and dated by the QAP and a copy provided to the CO and QAPC. The quarterly report will be given to the contractor.

SECTION 5.0.

UNACCEPTABLE PERFORMANCE

5.1. Unacceptable Performance

5.1.1. When the contractor’s performance is deemed unacceptable, QAP will determine the cause of the unacceptable performance. If any Government action, or lack of action, caused or contributed to the unacceptable performance, the unacceptable performance will not be counted against the contractor. The QAP will take action to ensure Government action, or lack of action, does not interfere with the Contractor’s performance in the future. The QAP will completely document the circumstance.

5.1.2 When the unacceptable performance is not the result of Government action, or lack of action, QAP shall promptly notify the contractor and issue a Corrective Action Report (CAR) (See attachment) to the contractor to assure corrective action is taken.

By initialing and dating the CAR, the contractor is acknowledging that s/he has been informed of the unacceptable performance and is not agreeing with the performance assessment. QAP shall direct the contractor to re-perform the service, if possible, without additional cost to the Government. If the contractor challenges the validity of the QAP’s unacceptable assessment finding, and the QAP and contractor cannot come to an agreement, the matter shall be referred to the Contracting Officer for resolution. The contractor shall be required to return all completed CARs to the QAP no later than the suspense date indicated on the CAR.

5.1.3. Unacceptable performance re-performed by the Contractor shall still count as unacceptable performance.

5.1.4. The QAP shall maintain a CAR log of all CARs issued to the Contractor (a locally devised form may be used). The CAR log shall contain the CAR number, date issued, contractor, description of unacceptable performance, suspense date, and closeout date. All CARs and CAR logs shall be maintained by the QAP for the life of the contract.

5.2. Contracting Officer Notification.

5.2.1. Major Finding. If at any time QAP identify a condition as having a significant adverse effect on the quality of the activity, such as those stated below, QAP shall document their findings and notify the Contracting Officer immediately in writing. Email is acceptable.

5.2.1.1. Contractor failure to meet a Performance Threshold.

5.2.1.2. Failure to provide adequate corrective action to preclude reoccurrence of Government identified findings.

5.2.1.3. Failure to provide corrective action to deficiencies identified by the contractor within a prescribed suspense period.

5.2.1.4. Any failure to adhere to security regulations that may results in a security incident.

5.2.2. Minor Finding. A departure from established standards having little bearing on the service provided. When QAP identify a minor finding, the QAP shall document the findings, but is not required to notify the Contracting Officer. However, if the same minor finding is repeatedly identified, it may be an indication that a major finding is occurring or has occurred because the Contractor has not taken proper steps to prevent recurrence. In this case, the QAP shall notify the Contracting Officer in writing.

5.3. Remedies for Unacceptable Performance.

5.3.1. In accordance with the contract Inspection of Services clause, if any of the services do not conform to contract requirements; the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. This includes but is not limited to termination of Contractor personnel and recruitment of substitute personnel that are equally qualified within established timeframes. When the defects in services cannot be corrected by re-performance, the Government may:

5.3.1.1. Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

5.3.1.2. Reduce the contract price to reflect the reduced value of the services performed. This may include a reduction in the number of paid hours to reflect the total non-performance period.

5.3.1.3. If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may

5.3.1.4. By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or

5.3.1.5. Decrement invoice as stated in the PWS related to performance; or

5.3.1.6. Terminate the contract.

SECTION 6.0.

CERTIFICATION/ACCEPTANCE OF SERVICES

6.1. QAP will certify receipt of acceptable contractor services each month. The QAP will certify that acceptable services were received, in accordance with the terms and conditions of the contract. The QAP will certify receipt of contractor services via the Wide Area Workflow (WAWF) website. Certification of services shall be accomplished on the first workday following the completion of the contract payment period, to avoid payment of interest penalties.

6.2. QAP are responsible for obtaining, scheduling, and completing WAWF training from the base Accounting and Finance Office.

SECTION 7.0.

CONTRACTOR’S QUALITY CONTROL PLAN

7.1. The contractor shall establish and maintain a Quality Control Plan (QCP) to ensure the requirements of the contract are provided as specified. The contractor shall provide a

QCP describing the inspection system for the services required in the PWS. The contractor shall develop and implement procedures to identify, prevent and ensure non-recurrence of unacceptable services. The contractor shall update the plan as changes occur.

7.1.1. The contractor shall employ his commercial quality control program/procedures to identify, prevent and ensure non-recurrence of defective services. Through implementation of the contractor's quality control program/procedures, the government shall receive quality services meeting the requirements of this contract.

The contractor shall update the plan as changes occur.

7.2. Contractor Inspection Records. The MFT will periodically review records of inspection work performed by the Contractor during the contract performance period to ensure conformance to contract requirements.

SECTION 8.0.

CONTRACT MANAGEMENT

8.1. The multi-functional team shall utilize the following approaches, methods, and tools to manage the contract upon award:

8.1.1. QAP shall conduct, document, track, and analyze contractor performance via regularly scheduled assessments. The assessment results shall be maintained as Past Performance Information and utilized to prepare and support annual Performance Assessment Report System (CPARS) reporting. Assessment results, along with the contractor’s submittals, and Defense Medical Human Resources Internet (DMHRSi) will be used to develop metrics to track Contractor’s overall compliance with contract terms and conditions.

8.1.2. The multi-functional team shall conduct periodic progress meetings, not less than quarterly, to review the contractor’s performance. At these meetings the Contracting Officer will apprise the contractor of how the Government views the contractor’s performance and the contractor will apprise the Government of problems, if any, being experienced.

SECTION 9.0

PERFORMANCE MANAGEMENT

9.1 This section identifies the use of performance measurement information to effective positive change in organizational culture, systems, and processes, by helping to set agreed upon performance goals, allocating and prioritizing resources, informing managers to either confirm or change current policy or program directions to meet those goals, and sharing results of performance in pursuing those goals.

9.2. Market Research: On-going market research is conducted to ensure the contract requirements remain current with commercial standards, practices and industry performance evaluation methods.

9.3. QAP Records Review: The contract administrator will review the QAP’s surveillance files no less than semi-annually to ensure surveillance is properly conducted and documented, and contractor performance is within acceptable levels. This review will be documented and acknowledged by the contract administrator and CO.

a. Surveillance Files: An inspection file must be developed and maintained by the primary QAP. This folder is typically contained in hard copy, but may be maintained in a computer database provided there is adequate back up of the data to preclude accidental loss. The surveillance folder must contain the following sections, but may contain any other sections or information that the QAP finds useful.

(1) Section 1: Performance Plan

(2) Section 2: Contractor’s Quality Control Plan (QCP) (if required)

(3) Section 3: Surveillance Documents – The type of information that may be included are details of inspections or data gathering, conversations or meetings with the contractor, notes and comments that may be of value at some later date.

(4) Section 4: Contract – The portions of the contract that apply to the functional area(s) of the surveillance folder, e.g., PWS chapters, directive documents, references, pertinent terms defined by the contract, equipment listings, etc.

(5) Section 5: Appointment Letters/Certificates of Training – QAP appointment letters and training certificates and Letter of Delegation to the assigned Functional Commander.

(6) Section 6: Records – A section used for filing all documentation associated with contract quality assurance, e.g., correspondence, CO inputs, and customer complaints.

9.4. Performance Feedback: Documentation is required to record, evaluate, and report contractor’s performance. On a monthly basis, the QAP will complete an evaluation of contractor performance and forward it to the CO that includes the following assessment elements.

Performance Element
Description
Quality of Service
Assess the contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., commonly accepted technical, professional, environmental, or safety health standards).
Schedule
Assess the timeliness of the contractor against the completion of the contract, task orders, milestones, and delivery schedule, administrative requirements (e.g., efforts that contribute to or effect the schedule variance).
Business Relationships
Assess if the contractor is oriented toward the customer’s needs. Is interaction between the contractor and government satisfactory or does it need improvement?
Management of Key Personnel
Assess if the contractor supports key personnel so they were able to work effectively and efficiently. If key personnel did not perform well, what action was taken by the contractor to correct this?
Cost
Assess contractor service value and product/service reliability relative to cost; plan, organize, and coordinate acquisition alternatives, as appropriate. Was best value/cost considered for parts purchased.

9.4.1. Performance Ratings. Contractor ratings and criteria are described below:

Performance

Rating Criteria

Exceptional
Performance meets contractual requirements and exceeds many to the government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good
Performance meets contractual requirements and exceeds some to the government benefit. The contractual performance element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were highly effective.
Satisfactory
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

9.5. 60 CONS Management and Oversight of Acquisition of Services Process

(MOASP) 37-1.

9.5.1. 30-day Assumption of Workload Review: All services acquisitions with a value in excess of $100,000 will be reviewed by the appropriate designated official within 30 days of the contractor’s full assumption of contract workload (for example, end of transition, phase-in, or similar event). The purpose of the review is to determine if the contractor successfully completed transition, is fully operational, and is within other performance parameters required by the contract. The QAP will conduct the initial 30-day post award review utilizing the monthly QAP report form and submit the report to the designated official. The designated office will determine if the contractor has or has not successfully completed transition, is fully operational, and is within other performance parameters required by the contract. In the event that the 30-day post award review indicates negative performance, the designated official will identify the specific categories of non compliance (i.e., negative variation in cost, schedule, and/or other significant performance metrics, etc.), and provide an explanation of the causes for the variance and an assessment of the contractor’s corrective action plan. Negative performance reports shall be forwarded to HQ AMC/A7K.

9.5.2. Annual Performance Review: All services acquisitions with a value in excess of $100,000 will be reviewed annually. This review is to be conducted not later than 30 days prior to issuing the notification of the Government’s intent to fund the follow-on year. The contract specialist will include a paragraph addressing the annual review in the CO’s determination to exercise the option. The statement shall be written to address contractor performance. The designated official will sign the CO’s determination. Any negative variations in cost, schedule and/or other significant performance measures required by the contract will be reported to HQ AMC/A7K.

9.5.3. Any significant changes in anticipated cost/price, schedule, or performance expectations are subject to a special review at the direction of the AFPEO/CM, HQ AMC/A7K, or other designated official.

CORRECTIVE ACTION REPORT (CAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACTOR

2. CONTRACT NUMBER

3. TYPE OF SERVICES

4. FUNCTIONAL AREA

5. SUSPENSE DATE

6. CONTROL NUMBER

7. DEFICIENCY FORMCHECKBOX

MAJOR FORMCHECKBOX

MINOR

FINDING:

FINDING IMPACT:

Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.

8. QUALITY ASSURANCE PERSONNEL (QAP)

TYPED NAME AND GRADE

SIGNATURE AND DATE

9. ISSUING AUTHORITY

TYPED NAME AND GRADE

SIGNATURE AND DATE

10. QAP RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE

11. QAP DETERMINATION

FORMCHECKBOX

ACCEPTED FORMCHECKBOX

REJECTED

12. CLOSE DATE

Quality Assurance Personnel (QAP) Monthly Report

TO: 60 CONS/LGCB

FROM (organization):

Contractor
Contract Number/Title of Service
Delivery Order Number (if applicable)
Month/Year
Location (bldg, area, etc.)

Key Subcontractor(s)

Evaluation Items (check as applicable)

Item
NA
Unsatisfactory
Marginal
Satisfactory
Very Good
Exceptional

Quality of Service

Schedule

Cost

Control

Business

Relations

Management

Key Personnel

Remarks:

Print name/grade of QAP

Date
Signature

Print name of Functional Commander

Signature
Date
Reviewed by
Signature
Date

Contract Specialist

Contracting Officer

Quality Assurance Program Coordinator

QAP Form: 1 Oct 07