Attachment_2_-_Performance_Work_Statement_REVISED.pdf

PDF 93 KB Posted

Attached to
Fire Department Roll-Up Door Replacement Federal contract opportunity
Solicitation number
FA4419-17-Q-0025
Issued by
Department of the Air Force Air Education and Training Command

About this file

Revised Performance Work Statement. Changes are highlighted in yellow.

View the file

Other files for this federal contract opportunity

Other files attached to Fire Department Roll-Up Door Replacement, newest first.
File Type Posted
Attachment_2_-_Performance_Work_Statement.pdf PDF
Attachment_4_-_Provisions_and_Clauses.pdf PDF
Combo_B433_FD_Roll_Up_Doors.pdf PDF
Attachment_3_-_Evaluation_Commercial_Items.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

REPLACE OVER HEAD DOOR AT BUILDING 433

1. SCOPE: The contractor shall provide one (1) replacement overhead door and ensure that it is functional.

2. PERIOD OF PERFORMANCE: Work must be performed within 21 calendar days of receipt and work will be accomplished in building 433, Altus AFB, OK 73523.

3. PRINCIPAL FEATURES: The work to be accomplished consists of removing and replacing overhead door.

a. Disconnect electrical, remove and discard old operator. Remove and discard the old door assembly.

b. Install new door and assembly, must be slats, insulated with 24 gauge front and back.

c. New door shall be Cornell “Brown GalvaNex” finish or equal.

d. Install new 460 volts/ 3 phase door operator with emergency chain hoist.

Install new control switch.

e. Make any adjustments needed to operator for a safe and correct operation of door.

All work shall be done in accordance with the IAW manufacturer’s specifications.

4. GENERAL: All work shall be performed in accordance with the manufacturer’s specifications and procedures for each type of work required. When work is not covered by specifications, installation instructions, or performance procedures said work shall be performed only after consultation, guidance and approval from manufacturer (Thermiser) and written verification provided.

5. SUBMITTALS: Contractor is responsible to provide detailed records of all parts replaced and any and all warranty information to the customer.

6. SPECIAL REQUIREMENTS: There is no smoking in or around building 433. There is a designated tobacco area located on the east side of building.

7. The contractor will assign employees who possess certification to handle all required material handling, transportation, loading, unloading and product installation tasks to meet

OSHA and base safety requirements. The contractor will ensure product meets required safety standards at the time the project is finished and accepted by the customer.

8. WARRANTY: Contractor must provide the standard commercial product warranty certificate specifying warranty period.

9. SECURITY REQUIREMENTS: The contractors will comply at all times with base security requirements to include base pass requirements and personnel security clearance.

10. ANTITERRORISM CLAUSE: Altus Air Force Base has an antiterrorism program that is responsible for helping secure and protect the base and its personnel from terrorist attacks. As a contractor working on Altus Air Force Base, you and your sub-contractors are required to obey all orders from Security Forces, and adhere to all security measures implemented as a result of Force Protection Condition changes (security posture changes).

Additionally, you and your sub-contractors are expected to report to base security forces any suspicious activities, packages, or items you see while conducting work on Altus Air

Force Base. Suspicious activities could include personnel conducting surveillance of the installation, unauthorized personnel requesting access to the installation, or somebody asking a lot of questions about the base. In an effort to help familiarize you, your employees, and sub-contractors about antiterrorism, Altus Air Force Base has an antiterrorism binder with all of the pertinent information for awareness training available for review at the Pass and Registration Office located at the south gate, Altus Air Force

Base, Oklahoma.

11. IP-Security Clause

11.1. Pass and Identification Items. The contractor shall ensure the following pass and identification items required for contract performance are obtained for employees and non-government owned vehicles requiring access to Altus AFB to perform contract requirements.

11.2. The contractor is responsible for providing information to assist in completing background checks for those employees requiring access to Altus AFB. This information shall consist of, but not limited to, the following: full name to include first, middle, and last, social security number, date of birth, address, driver’s license number and state of issue, number of years resident of the State of Oklahoma and Jackson County. This information will be protected under the procedures listed under the Privacy Act of 1974. A background check must be completed prior to unescorted access. Those contractor employees whose background checks reveal adverse criminal history may be denied access to Altus AFB.

11.3. The contractor is responsible for tracking and retrieving badges from employees upon separation, termination and/or completion of business on Altus AFB, Oklahoma.

Badges from employees no longer working on the contract must be turned in to the

Contracting office within 30 days of leaving.

11.4. Businesses may lose base pass privileges if they fail to control use of the badges or do not return them upon completion of use. Excessive abuse may result in termination or a decision not to exercise option periods for this contract. Employees who abuse their badge privileges by attempting base access beyond the dates, times, locations or specified work and other limitations may be subject to revocation of base access.

12. Environmental Statement: Contractors must comply with all environmental requirements to include completion of initial Environmental Management Systems (EMS) awareness level training within 10 days of contract award or with a new contract employee beginning work on the Air Force Installation and the appropriate documentation of training completion is to be maintained. Training is available at http://www.altus.af.mil/shared/media/document/AFD-

130214-023.pdf.

13. Contractor personnel shall present a neat and clean appearance and be easily recognized as contractor employees. The contractor shall provide contractor personnel working at Altus AFB with a method of identifying the company name, employee’s first and last name, and job title.

This may be accomplished by a name badge or a company shirt. Employees must wear identification at all times.

END