Attachment_2_-_Submittal_Register.xls

XLS spreadsheet 67 KB Posted

Attached to
JBSA Lackland - Replace Outside Air System Federal contract opportunity
Solicitation number
FA3047-15-R-0072
Issued by
Department of the Air Force Air Education and Training Command

About this file

Attachment 2 - Submittal Register

View the file

Other files for this federal contract opportunity

Other files attached to JBSA Lackland - Replace Outside Air System, newest first.
File Type Posted
Attachment_3_-_Wage_Determination.pdf PDF
Attachment_6_-_AETC_Form_47_-_20_Apr_15.xfdl XFDL file
Attachment_5_-_Cost_Estimate_Breakdown.PDF PDF
Attachment_1-_SOW_20_Apr_15.pdf PDF
FA3047-15-R-0072_Solicitation.pdf PDF
Attachment_4_-__Bid_Schedule.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
MPLS 17-A021Project Title:
REPLACE DEDICATED OA SYSTEMSolicitation / Contract Number:

FA3047-15-R-0072

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies RequiredRemarks
Item or Description of Item, Contract Reference, Type of SubmittalCERTIFICATION OF
COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S
RECOMMENDATIONSMANUFACTURER'S
WARRANTYCATALOG DATAOPERATING
INSTRUCTIONSDOCUMENTCDRequired Submission DateDate Received in ContractingDate to Civil EngineeringReturn Suspense DateSubmittal NumbersDate Contractor
NotifiedContractor ResubmittalFinal Approval
ApprovedDisapproved
1Design Submittals - Hard Copies 65%33
2Design Submittals -CD/DVD 65%222
3Design Submittals - Hard Copies 95%23233
4Design Submittals -CD/DVD 95%222
5Design Submittals - Hard Copies 100%333
6Design Submittals -CD/DVD 100%222
7Contract Progress Schedule AF Form 30643
8Safety Plan33
9SWPPP33
10DD 135433
11Warranty Mangement Plan033
12Operation and Maintenance Data33343
13Training Schedule3
14As-Built Drawings, Hard copy & electronic3333
15Hazardous Materials Report333
16Demolition Plan33
17Waste Manifests33
18Asbestos. Lead Based Paint Abatement Plan, if required3333333
19Licensing, Liscenses & Permits3
20Paint, Primer and Prep Material/Process33
21Inspection Certification, Manufacturer Initial Start-up33
22Division 2 Existing Conditions3333333
23Division 3 Concrete3333333
24Division 4 Masonry3333333
25Division 5 Metals3333333
26Division 6 Wood, Plastics, Composites3333333
27Division 7 Thermal and Moisture Protection33333333
28Division 8 Openings3333333
29Division 9 Finishes3333333
30Division 10 Specialties3333333
31Division 11 Equipment
32Division 12 Furnishings
33Division 13 Special Construction
34Division 14 Conveying Equipment
35Division 21 Fire Supression33333303
36Division 22 Plumbing33333333
37Division 23 HVAC333334333
38Division 25 Integrated Automation3333333
39Division 26 Electrical3333333
40Division 27 Communications33333331
41Division 28 Electronic Safety and Security33333331
42Division 33 Utilities33333331
43Division 34 Transportation1
44Division 35 Waterway and Marine Construction1
Division 40 Process Integration
Division 41 Material Processing and Handling Eqpt
Division 42 Process Heating, Cooling, and Drying Eqyp
Division 43 Process Gas & Liquid Handling, Purification & Storage Eqpt
Division 44 Pollution Control Equipment
Division 48 Electric Power Generation
Lay-down Area Sketch and Lay-out330
Point Verification test (PVT)3
Unit Removal/Installation Plan & Minutes33

&L&"Verdana,Bold"&12Schedule of Material Submittals

&CFA3047-15-R-0072

Attachment 2&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)