FA3030-17-Q-0001-P0001.pdf
PDF 40 KB Posted
- Attached to
- Goodfellow AFB Range Maintenance Federal contract opportunity
- Solicitation number
- FA3030-17-Q-0001
About this file
Amendment 1 - Change PWS and extend proposal due date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Redacted_Single_Source_JA_Redacted.pdf | ||
| FA3030-17-Q-0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA3030-17-Q-0001
17TH CONTRACTING SQUADRON -FA3030
210 SCHERZ BLVD
SPENCER.JACOBSON.1@US.AF.MIL
GOODFELLOW AFB TX 76908-4705
F1Z3006200AW01
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
To incorporate changes to the PWS and extend the offer due date from 9 December to 15 December, 2016.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Dec-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA3030-17-Q-0001
X 9B. DATED (SEE ITEM 11)
01-Dec-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Dec-2016
CODE
17TH CONTRACTING SQUADRON -FA3030
210 SCHERZ BLVD
WILLIAM.SIMPKINS@US.AF.MIL
GOODFELLOW AFB TX 76908-4705
FA3030 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE FA3030
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 09-Dec-2016 03:00 PM to 15-Dec-2016 03:00 PM.
(End of Summary of Changes)
The following items are applicable to this modification:
REASON FOR MODIFICATION
REASON FOR AMENDMENT
The purpose of this amendment is to incorporate the following changes:
1. Incorporate the changes to the PWS dated 13 December, 2016.
2. Extend the offer due date from 9 December 2016 to 15 December, 2016.
3. All other terms and conditions remain unchanged.
PWS
STATEMENT OF WORK
RANGE MAINTENANCE
13 DECEMBER 2016
1. DESCRIPTION OF WORK:
1.1 Work to be done: The work to be performed under this contract and in accordance with these contract documents shall consist of furnishing all necessary plant, labor, and constructing, installing and performing all work shown and described in the contract documents, all of which are made a part thereof.
1.2 Character of Work and Mechanics: The work shall be executed in the best and most workmanlike manner by qualified mechanics skilled and registered.
1.3 Location: Goodfellow Air Force Base is located in Tom Green County, on the southeast side of San Angelo, Texas.
1.4 Applicable Regulations:
1.4.1 29 CFR 1926.62 OSHA Lead Construction Standard, May 4, 1993: (a) Scope, (b) Definitions, (c) Permissible Exposure Limit, (d) Exposure Assessment, (e) Methods of Compliance, (f) Respiratory Protection, (g) Protective Work Clothing and Equipment, (h) Housekeeping, (i) Hygiene Facilities and Practices, (j) Medical Surveillance, (k) Medical Removal Protection, (I) Employee Information and Training, (m) Signs, (n) Record keeping, (o) Observation and Monitoring, (p) Effective Date, (q) Appendices, (r) Startup Dates
1.4.2 40 CFR part 262 Standards Appl icable to Generators of Hazardous Waste
1.4.3 29 CFR 1910.1200 Hazard Communication (HAZCOM), July 1991
1.4.4 30 Texas Administrative Code 335
2.1 PRINCIPAL FEATURES:
2.2 All work shall be done with the building and the work area unoccupied. All work shall be coordinated with the occupants and Base Contracting through the Contracting Officer or Administrator.
2.3 General Description of Work: The Contractor will service and maintain the backstop system to include air compressors, dust collectors, auger system, and target retrieval system:
2.2. l. Air Compressors: Check oil level and top off as needed IAW the manufactures recommendations, and change the oil once a year during the contract period. Check and repair as needed for leaks in the lines of the compressor to include to the dust collector. Ensure compressor is fully operational.
2.2.2. Dust Collectors: Check the systems for proper CFM (cubic feet per meter) air flow IAW manufactures operators manual, and repair as needed. Ensure all collection buckets are sealed and replace as needed.
2.2.3. Backstops: Check all bolts to ensure proper torque IAW manufactures man ual and tighten/ replace as needed. Inspect backstop for cracked, damaged, or gaps in the backstop plates and repair as needed.
Ensure auger system operates smoothly and repair as needed.
2.2.4. Target Runners and Rails: Inspect for smooth operation and serviceability, repai r or replace as required for operation. Inspect rails for straightness and repair all thread supports as needed.
2.2.5. Retrieval Switches: Check for serviceability and repair as needed.
2.2.6. Empty 2 gallon dust collector buckets attached to the Dust Collector: Dust Collector buckets will be inspected for serviceability.
3.1 UTILITY OUTAGE AND SPECIAL CONDITIONS:
3.2 Utility Outage: When an extended utility outage is necessary to perform the contract work in an occupied facility, regardless of whether the work area is occupied, the outage shall be performed by the contractor during non- duty hours at no additional cost to the government, unless otherwise approved by the Contracting Officer.
3.3 Electrical Outages: Should the contractor require electrical outages in order to accomplish his work, the contractor shall notify 17th Civil Engineer Squadron Service Call (654-3436) of outage requirements to include building affected length of outage and reasons for the outage.
3.4 Security Requirements:
3.3.1 Secure Areas: The contractor shall ensure all employees comply with all security requirements imposed by the installation commander at all times, and shall follow all instructions of the organizational commander having jurisdiction over the area being serviced in all matters pertaining to security. The contractor and his personnel shall be required to coordinate and schedule all work with the Base Environmental 915/654-3450 and Firing Range Manager, 915/654-5565 prior to entering these areas.
3.4 Digging Permits: (Not Used)
3.5 Special Conditions:
4. BASE FIRE REGULATIONS: The contractor shall comply with Base Fire Regulations as set forth in GAFB Instruction 32-2001, dated 25 January 1995, titled "Base Fire Protection Program''.
5. ENVIRONMENT AL REQUIREMENTS:
5.1 Compliance with Laws: The contractor shall comply, and ensure that all subcontractors comply, with all applicable federal, state, and local laws, regulations, ordinances and standards related to environmental matters. The contractor shall also comply, and ensure that all subcontractors comply with all specific instructions or directions contained herein regarding environmental matters.
5.2 Hazardous and Special Wastes Generated by the Contractor: The contractor shall identify, containerize hazardous wastes in strict accordance with the Code of Federal Regulations, Title 40 (40 CFR) part 262 and the Texas Administrative Code 30 TAC 335. Containers will be provided by 17 SFS.
Disposal will be provided by 17 CES.
5.3 Asbestos: To the best of the government's knowledge, no asbestos-containing material (ACM) is in the facility. Should the contractor encounter previously unidentified or suspected (ACM) which must be disturbed to comply with the contract documents, the contractor shall cease that work which would disturb the suspect material and shall immediately notify the Contracting Officer. The government will take steps, as appropriate, to ascertain the material's composition and determine any remedial actions necessary.
5.4 Hazardous Materials: The contractor shall provide the Base Civil Engineer Environmental Flight a list of all hazardous materials that the contractor will bring onto government property and shall further provide a Material Safety Data Sheet (MSDS) for each Hazardous Chemical listed in OSHA Hazard Communication Standard 29 CFR 1910.1200. In addition the contractor shall observe proper storage practices for hazardous materials stored on base. Disposal of waste will be done by 17 CES.
5.5 Nuisance and Polluting Activity Prohibited: Polluting, dumping, or discharging of any harmful, nuisance, or regulated materials (such as, vehicle maintenance fluids, solid waste and hazardous substances) into building drains, site drains, streams, waterways, holding ponds or to the ground surface shall not be permitted and the contractor shall be held responsible for any and all damages which may result. Further, the contractor shall conduct his activities in such a fashion which avoids creating any legal nuisance, including but not limited to, suppression of noise and dust, control of erosion, and implementation of other measures as necessary to minimize off-site impacts of work activities.
5.6 Instructions for Hazardous/Solid Waste Disposal:
5.6. l Collect For Hazardous Waste Disposal: Paints, solvents, thinners, rags contaminated with any hazardous constituents, aerosol cans that are not empty, batteries (other than lead acid -- mercury, nickel cadmium [NICADS], l ithium), and all items identified as hazardous materials.
5.6.2 ENSURE THAT THE FOLLOWING PROCEDURES ARE FOLLOWED:
5.6.2.1 Mark all containers with contents or have original label (if product).
5.6.2.2 Keep all containers closed/lids in place/no open containers.
5.6.2.3 Keep material safety data sheets on file at the job site to satisfy worker hazard communication requirements.
5.6.2.4 Do not transport hazardous waste off base or accept hazardous waste from off base.
5.6.2.5 Ensure proper storage of incompatible materials (such as acids/bases).
5.6.2.6 Do not dispose of any chemical down drains, in dumpsters or on the ground.
5.6.2.7 Practice general good housekeeping.
5.6.2.8 Do not collect any waste in any other container that previously contained any hazardous material.
5.6.2.9 Site specific spill plans must be in place and should be included in the workplan for work area.
6. SITE MAINTENANCE AND CLEANUP:
6.1 Site Maintenance: The contractor shall protect adjacent property, buildings, and their contents from dust, d irt, or other materials. Work areas shall be maintained in a neat, clean, and safe cond ition and shall, at a minim um, be cleaned at the end of each shift.
6.2 Cleanup: The contractor shall collect all trash, debris, refuse, garbage, etc., which he generates and place it in appropriate containers with lids or approved covers on a daily basis. The aforementioned materials shall be hauled from the site by appropriate means on a daily basis, unless otherwise approved by the Contracting Officer. Disposal shall be outside the limits of government property at sanitary landfill or other by approved methods and shall conform to all local, state, and federal regulations. Disposal will be done by 17 CES.
7. ENERGY CONSERVATION:
7. l The contractor shall use good judgment in the conservation of government util ities.
Prevailing energy conservation practices shall be adhered to and enforced by the contractor.
7.2 Conservation of Utilities: The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions, which preclude the waste of utilities, which shall include:
7.2. 1 Lights shall be used only in areas where and when work is actually bei ng performed.
7.2.2 Water faucets or val ves shall be turned off after the req uired usage has been accomplished.
7.2.3 The contractor shall not abuse the use of base telephones. Telephones shall be used for contract related issues only.
8. RESPONSIBILITY: The above 1 through 7 summaries do not in any way limit the responsibility of the contractor to perform all work and furnish all plant, a n d labor required by the contract documents referenced herein.
9. STORAGE AND PARKING:
9.1 Contractor storage and parking shall be in the vicinity of the job site as designated by the Contracting
Officer.
9.2 All other storage areas shall be kept free of debris, leaks, stains, or splashes and kept in a neat, clean, and safe condition. Any contamination of the storage area by a hazardous substance shall be immediately remediated by the contractor at no additional expense to the government.