FA3030-16-Q-0004_Amendment.pdf

PDF 64 KB Posted

Attached to
Replace Flooring B3227 Federal contract opportunity
Solicitation number
FA3030-16-Q-0006
Issued by
Department of the Air Force Air Education and Training Command

About this file

The purpose of this amendment is to add two drawings to the solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Replace Flooring B3227, newest first.
File Type Posted
FA3030-16-Q-0006_Amendment.pdf PDF
FA3030-16-Q-0006_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F1Z3126056AW03

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to add questions and answ ers from the site visit held on 11 July 2016 and four draw ings to the solicitation

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Jul-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA3030-16-Q-0004

X 9B. DATED (SEE ITEM 11)

30-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Jul-2016

CODE

17TH CONTRACTING SQUADRON -FA3030

210 SCHERZ BLVD

NICHOLAS.JOHNSON.13@US.AF.MIL

GOODFELLOW AFB TX 76908-4705

FA3030 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA3030-16-Q-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Statement of Work B145 14 16-JUN-2016 Attachment 2 Material Schedule B145 2 01-SEP-1986 Attachment 3 Floor Plan B145 1 01-JUL-2013 Attachment 4 WD15-2517R2 10 01-MAR-2016 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Statement of Work B145 14 16-JUN-2016 Attachment 2 Material Schedule B145 2 01-SEP-1986 Attachment 3 Floor Plan B145 1 01-JUL-2013 Attachment 4 WD15-2517R2 10 01-MAR-2016 Attachment 5 Questions and Answers 1 11-JUL-2016 Attachment 6 View 1 1 12-JUL-2016 Attachment 7 View 2 1 12-JUL-2016 Attachment 8 View 3 1 12-JUL-2016 Attachment 9 View 4 1 12-JUL-2016

(End of Summary of Changes)

Site Visit Building 145 Questions and Answers

11 July 2016

The following questions were received during the site visit. Responses were provided by CES after the site visit ended.

Question 1. Are drawings-to-scale or auto-CAD files available?

Response: Scale drawings or auto-CAD files are not available. Four pdf files with approximate dimensions are added to the solicitation: View 1, View 2, View 3, and View 4. These files must be used in conjunction with Attachment 2, Floor Plan B145, provided in the original solicitation.

Question 2. What will be done to address the difference in height between the hallway and the plywood underlayment in the four remodeled offices (identified as rooms 19 and 20 on Floor Plan B145)?

Response: A rubber reducer or transition strip per SOW paragraph 3.3.3 will be used to address the difference in height between the hallway and the plywood underlayment in these doorways.

Question 3. Will the stairs going into Classroom 2 (Room 24) require rubber treads?

Response: No, the stairs going into Room 24 will be carpeted and will not require rubber treads.

Question 4. Will the sink and counter area in Classroom 2 (Room 24 along the wall adjacent to Room 23) be moved to install carpeting under the cabinets?

Response: No, the counter area will not be moved. Carpet will be cut to fit around the cabinets.

Question 5. Will the closets in Room 4 be carpeted?

Response: Yes, the closets in Room 4, labeled 4A and 4B, and Room 5 (see file View 4) will be carpeted.

23 22

MECHANICAL

ROOM

12'-7"13'-6"

53'-10"

33'-3"

19'-4"

9'-5"

6'-5"

3'-6"

N

DATE:

JULY 2016EHK

SCALE:

DRAWN BY:

NONE

BLDG 145

1ST FLOOR DIMENSIONAL PLAN

DIMENSIONS ARE APPROXIMATE

FIELD VERIFICATION REQUIRED

PAGE: 1 OF 4

23 22

13 12

MECHANICAL

ROOM

10'10'-2"

12'-6"

20'-3"

10'-4"

12'-4"

24'-5"

5'-10"

4'-2"

6'-2"

21'

12'-8"12'-7"13'-6"

53'-10"

DATE:

SCALE:

DRAWN BY:

NONE

N

JULY 2016EHK

BLDG 145

1ST FLOOR DIMENSIONAL PLAN

DIMENSIONS ARE APPROXIMATE

PAGE: 2 OF 4

15b

13 12

MECHANICAL

ROOM

15c

15a

36'-8"

4'-3"

19'-3"

13'-1"

12'-2"

9'-7"

25'-8"

10'

10'10'10'-2"

20'-3"

5'-10"

14'-1"

21'

9'-7"

DATE:

SCALE:

DRAWN BY:

NONE

N

JULY 2016EHK

BLDG 145

1ST FLOOR DIMENSIONAL PLAN

DIMENSIONS ARE APPROXIMATE

PAGE: 3 OF 4

15b

4A

4B

15c

15a

36'-8"

18'-4"

12'

8'-10" 9'-2"

27'-5"

4'-3"

19'-3"

13'-1"

12'-2"

25'-8"

10'

14'-1"

16'-10"

DATE:

SCALE:

DRAWN BY:

NONE

N

JULY 2016EHK

BLDG 145

1ST FLOOR DIMENSIONAL PLAN

DIMENSIONS ARE APPROXIMATE

PAGE: 4 OF 4

Amendment P00001
FA3030-16-Q-0004 Sol Amend
16-Q-0004 B145 Q&A
00145-1-8.5 x 11 VIEW 1
00145-1-8.5 x 11 VIEW 2
00145-1-8.5 x 11 VIEW 4
00145-1-8.5 x 11 VIEW 3

File details come from the government source that posted it. Updated .