Attachment_5_Evaluation_Criteria.pdf
PDF 56 KB Posted
- Attached to
- Sky Watch Tower Maintenance Federal contract opportunity
- Solicitation number
- FA3022-17-T-0025
About this file
Attachment 5 Evaluation Criteria
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combo.pdf | ||
| Combo.pdf | ||
| Attachment_2_Clauses_IBR.pdf | ||
| Attachment_3_Statement_of_Need_10_Aug_17.pdf | ||
| Attachment_6WD_No_2015-5157.pdf | ||
| Attachment_4_Instructions_to_offerers.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5 08/16/2017
Evaluation Criteria
The two lowest priced quotes will be evaluated for technical acceptability. An award will be made to the lowest quote found technically acceptable, award will be made without further consideration. If it is found technically unacceptable, the Government will evaluate the next lowest quote for technical acceptability until award can be made to the lowest priced technically acceptable vendor. Technical acceptability will be based on the submitted maintenance plan meeting the criteria established in the Statement of Need, which must havea mainteneance plan with a minimum of 3 visits per year and have 4 additional option years (period of performance years).
File details come from the government source that posted it. Updated .