AF_ISWM_Recycling_PWS-_DRAFT.pdf
PDF 238 KB Posted
- Attached to
- Recycling Services Federal contract opportunity
- Solicitation number
- FA3022-17-R-0011
About this file
Recycling PWS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Synopsis_Recycling_Services.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
INTEGRATED SOLID WASTE MANAGEMENT
(Recycle)
Columbus AFB 8 May 2017
1. DESCRIPTION OF SERVICES. The Contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform Integrated Solid Waste Management (ISWM) Recycling Services at Columbus AFB MS. The Contractor shall perform to the standards in the contract as well as all local, state, and federal regulations. Estimated workload factors are in Appendix A and collection areas are in Appendix B, Government Furnished Property/Services/Equipment.
1.1. COLLECTION REQUIREMENTS
1.1.1. Main Base
1.1.1.1. Municipal Solid Waste [RESERVED]
1.1.1.2. Food Waste [RESERVED]
1.1.1.3. The Contractor shall empty recycling containers based on historical data for the first 30 days of performance or at least weekly. The Contractor shall establish initial vehicle routes and collection schedules upon contract award. Container size, routes, and frequencies should be established to provide the minimum number of pickups necessary to maintain a healthy, vector-free environment and prevent waste container overflow. They are to be submitted to the Contracting Officer (CO) five calendar days prior to start of contract performance. The Contractor may propose adjustments to the schedule at any time but as a minimum the Contracting Officer’s Representative (COR) and Contractor shall monitor fill capacities during the first 30 days of performance and during one other period to be agreed upon during the same performance period, in order to determine if adjustments to container size, routes, or frequencies should be made. No changes are allowed to the schedule or haul route without CO or COR coordination. Historical frequency tables are located at Appendix A. When the Contractor completes service at a location there shall be no litter, waste, or recyclable material on the ground within a 10-foot radius of the container.
1.1.2. Military Family Housing (MFH) (Non-Privatized) [RESERVED]
1.1.3. Over and Above Requirements. The following services shall be priced separately in accordance with (IAW) the cost contained in blocks 19 through 24 on the Standard Form (SF) 1449, Solicitation/Contract/Order for Commercial Items. The Contractor shall be compensated IAW the price specified on the SF 1449 for that service. The Contractor shall be compensated IAW the unit price when these services are requested.
1.1.3.1. Unscheduled Pickup and Special Events. In addition to the scheduled recycling collections, the CO or COR may request the contractor make unscheduled collections and disposals. For unscheduled events, the Contractor shall respond within one business day of notification from the CO or COR. For special events, the Contractor shall also provide (or re-position as directed) recycling containers. These containers shall be placed in locations for a length of time designated by the CO or COR. The CO shall notify the Contractor in writing at least seven days in advance of the special event date. See Appendix A, Table A-1, for workload data.
1.1.3.2. Construction and Demolition Debris (C&D). When requested by the CO or COR, the Contractor shall provide containers for collection of recyclable C&D. The Contractor shall place containers at the designated site within one business day of notification by the CO or COR. The Contractor shall also coordinate with local scrap metal company to provide roll offs for recycling.
Clean (uncontaminated) concrete and asphalt may be transported to the base clean fill site as an alternative to off-base recycling or landfill facilities. The Contractor shall provide weight tickets of all roll-off containers to the COR.
1.1.3.3. Public/Common Use MSW Receptacles [RESERVED]
1.1.3.4. Public/Common Use Recycling Receptacles. Contractor shall empty, collect, and recycle material from government-furnished recycling containers before their capacity is exceeded. See paragraph 1.2.1 for a list of recyclable materials.
1.1.3.5. Ash Collection [RESERVED]
1.1.3.6. Additional Pickups [RESERVED]
1.1.3.7. ContainerRelocations: The Government may request relocation of containers. The request will be made in writing and the Contractor shall relocate the containers within 72 hours.
1.1.4. Inclement Weather Schedule. The Contractor shall collect recyclable material during periods of inclement weather. In cases of severe weather, the CO or COR may authorize exceptions. When exceptions are granted, the Contractor shall collect all missed collections within 24 hours after the severe weather has terminated, unless the CO authorizes additional time.
1.1.5. Route Parameters. The Contractor shall propose routes to the base through the Main (East) Gate off of Highway 45 to the COR for acceptance. Collection shall be made between the hours of 5:00 a.m. to 7:00 a.m., Monday through Friday, in the Base Industrial Area and from 7:30 a.m. through 3:00 a.m. on scheduled days at the appropriate Temporary Living Facilities.
Collection outside these hours shall require prior coordination of the COR.
1.1.6. Points of Collection. The Contractor shall position bulk containers for customer ease in depositing recyclable material. The Contractor shall also position containers to minimize interference with adjacent parking areas, sidewalks, roadways, overhead utilities, trees, storm drains, and other potential obstructions.
1.1.7. Cubic Yard Capacity [RESERVED]
1.1.8. Government-Approved Containers. Collection recyclable materials in all areas shall be from government-provided, CO or COR accepted containers, recycling bins or plastic bags.
Containers shall meet the base architectural/appearance standards.
1.1.9. Maintaining Containers and Collection Area. The Contractor shall return all recycling containers to their original location after servicing, in an upright position with the lids securely in place (closed). The Contractor is responsible for cleaning up any spills, debris, etc., on the ground within 10 feet of the container when servicing a location. The Contractor shall collect debris placed at collection stations; for example, tree branches, sacks, cartons, boxes, cans, tied bundles, or other containers. It is intended that the majority of debris will be placed in containers. The Contractor shall notify the COR of locations where debris is frequently placed outside of containers so the COR may notify facility managers and, if necessary, the Contractor can adjust the container size or pickup frequency with CO approval. The Contractor shall also notify the COR if it is discovered that a particular receptacle is being utilized for the wrong material.
1.1.10. Vehicle Weighing. The Contractor shall weigh all vehicles used to collect recyclable commodities on state-certified public scales/weigh station, either on- or off-base. When use of off-base scales are the only option, a predetermined public state-certified scale/weight station will be identified for use. The COR may be present at the public scale for empty and loaded weighing with no notice to the Contractor. All weight discrepancies will be resolved prior to departing the scale site. The Contractor and COR (if present) shall sign all weight tickets. The Contractor shall submit a monthly report that includes weight tickets that reflect the recycled tonnage. The base recycling center has a scale inside building to weigh all the bales that are made and then bales will be placed into trailer located on dock.
1.2. RECYCLABLE MATERIALS PROCESSING. The base operates a Qualified Recycling Program (QRP) to reduce the volume of non-hazardous solid waste generated. It is the intent of the base to conduct direct sales of recyclable commodities through a QRP. The Contractor shall provide a detailed accounting of recyclable commodities sold (type/weight/price) to the QRP along with 100 percent of the sales proceeds. The Contractor shall be aware of the DoD and USAF waste diversion goals and notify the base QRP manager of potential waste diversion opportunities in the local area. The Air Force waste diversion goals can be found in the most current USAF Strategic Sustainability Performance Plan (SSPP).
1.2.1. Materials. The following items shall be recycled: Industrial scrap metal, aluminum containers, glass bottles (clear, brown, green), office paper, newspaper, corrugated fiberboard/cardboard/paperboard, plastics, tree trimmings, toners, lead acid batteries, non-government electronics and pallets. Contractor may recycle materials not listed above with prior coordination of the CO or COR. All recyclable items shall be stored, shipped and disposed of in accordance with federal and local environmental regulations.
1.2.2. Pickup Points. Current containers shall be emptied weekly.
1.2.3. Base Recycling Center. The Government will provide the contractor use of the base recycling center.
1.2.3.1. Contractor Responsibilities.Separate and prepare for transport/resale all recyclable materials. Perform daily general maintenance such as cleaning and replacing light bulbs (with height less than 10 feet, contractor may submit AF Form 332, Base Civil Engineer Work Request, for bulbs greater than 10 feet), and perform recommended maintenance on government-furnished equipment. Provide appropriate personal protective equipment for employees. Notify Base Civil Engineer Customer Service (434-2856/2857) for facility maintenance or repair requirements.
The CO, COR, and Contractor representative will jointly conduct a 100 percent inventory check prior to return of equipment listed in Appendix B to the Government upon conclusion of contract.
With the approval of the CO, Contractor may procure and install additional equipment as required to more efficiently process recyclable materials. Contractor-purchased equipment will be procured at the contractor's expense, owned by the contractor, and removed upon contract termination.
1.2.4. Marketing. The Contractor shall market recyclable commodities, which may include transporting commodities to buyers such as aluminum cans. The Contractor shall educate all residential and base facility occupants on the benefits of recycling and encourage the widest possible participation. Written publications such as original published pamphlet’s, brochures, or other informative media, maybe used to inform user
1.2.5. Sales Receipts. The contractor shall provide a Commodity Sales Summary to the QRP, no later than the fifth working day of each month, consisting of commodity type sold, sales proceeds achieved by commodity and weights of commodity sold. Documentation to accompany the Commodity Sales Summary includes commodity sales receipts, commodity sold weight tickets, and reimbursement check for commodity sales proceeds.
1.2.6. Composting [RESERVED]
1.2.6.1. Mulching/Chipping. Chip/Mulch all shrubs, tree limbs, pallets and uncontaminated lumber delivered to the chipper facility. The Contractor may not stockpile material. Unless approved by the COR, the Contractor will operate the processor for a minimum of one hour of continuous operation every other week from November-February and a minimum of four hours of continuous operation from March-October every other week or until all material on the ground has been mulched. The Contractor shall debag all bags of organic waste not in biodegradable bags. Properly debagged waste shall be free of visible bag material. The mulch area shall be maintained by the contractor; mowed and trash pickup. There should not be any trash located at the mulch site. All trash will be brought back to the Recycling Center for proper disposal.
1.2.6.2. Material Placement. The Contractor shall mix all chipped and mulched material and place into one pile. The pile shall be free from contamination and maintained in a matter for easy loading the product.
1.2.6.3 Windrow Maintenance [RESERVED]
1.2.6.4. Disposition [RESERVED]
1.3. DISPOSAL.
1.3.1. Off-Base Disposal [RESERVED]
1.3.2. Disposal of Non-marketable Materials. Any commodity rejected by a predetermined commodity buyer must be reclaimed by the contractor for commodity rework or disposal.
Commodity rejection explanation must be provided to the CO or COR within 24 hours of buyer rejection along with remedy of the reject and plans to prevent same future rejections.
1.4. EQUIPMENT MAINTENANCE. The Contractor shall maintain all Government provided containers (GPC) so that they have a professional appearance and ensure they are free of unpleasant odors, dirt, debris, and pests. Examples of GPC are as follows: desk side bin, office bins, outside bins, and 24 hour drop off bins. All containers must remain in good, workable condition, with no leaks. They must remain easily accessible to customers. The Contractor shall perform all cleaning, repair and other maintenance tasks. Trucks and trailers used for hauling and collecting shall be free of odor, dirt, debris, and pests. Contractor vehicles and equipment shall not have any waste or equipment leaks such as oil or hydraulic fluid. Should any contractor vehicles or equipment have any leaks, the Contractor is responsible for cleanup. Maintenance of other associated equipment that is government provided such as compactor, balers, shedder, and skid steers. These will be parts/materials reimbursable for any single repair costing over an estimated threshold ($1500.00).
2. REPORTS AND RECORDS. The Contractor shall provide a monthly report, by the fifth working day of the month, detailing the previous months, cumulative weight tickets for total tonnage of solid waste collected (recycling), weights diverted by recyclable commodity and commodity sales proceeds reimbursed in sufficient detail to support Defense Environmental Programs Management requirements. Sales receipts must accompany the report. Format for these monthly reports shall be coordinated with the CO or COR.
3. SERVICE SUMMARY. The contract service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The Services Summary (SS) and the Contractor’s Quality Control Plan provide information on contract requirements, the expected level of Contractor performance, and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success. Procedures as set forth in the FAR 52.212-4 (a), Contract Terms and Conditions
- Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies. During the first initial 30 days of the contract, two additional errors on each Performance Objective shall be allowed in an effort to identify normal phase-in problems.
Performance Objective PWS para. Performance 1 Perform Recyclable Materials
Processing in accordance with QRP and USAF SSPP.
1.2 – 1.2.6.4 0 Deficiencies permitted.
2 Maintain equipment in good workable condition. Waste containers/equipment are to be washed and free of odors.
1.4 No more than 2
Customer Complaints monthly.
3 Perform unscheduled collections required by the contracting officer
1.1.3.1 0 Deficiencies permitted.
(Delivery order shall not be accepted until all deficiencies are corrected.)
4 Provide a monthly report by the fifth working day of each month
1.5 0 Deficiencies permitted.
3.1. QUALITY CONTROL
The Contractor shall develop and maintain a quality control program to ensure integrated solid waste management (recycling) is performed in accordance with commonly accepted commercial practices. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum the contractor shall develop quality control procedures addressing the areas identified in paragraph 3, Service Summary.
3.2. QUALITY ASSURANCE
The Government shall inspect and evaluate the Contractor’s performance to ensure services are received in accordance with requirements set forth in this Performance Work Statement (PWS).
The contractor shall provide work schedules to the COR in accordance with this PWS. The COR shall inspect by validating actual work performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in this PWS. The COR will use the Contractor’s work schedule or modified version thereof, to record validation results. Results of the validation then become the official Air Force record of the Contractor’s performance. When a performance threshold has not been met or Contractor performance has not been accomplished, the COR will initiate and provide the CO a Contract Discrepancy Report (CDR), DD Form 2772, for issuance to the Contractor. The Contractor shall respond to the CDR IAW instructions provided and return it to the CO within 10 calendar days of receipt.
3.3. PERFORMANCE ASSESSMENT
3.3.1. Periodic Assessments. This method requires the COR to employ a “spot check” style of evaluation based on the Contractor’s schedule. Periodic validations will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or annually) and may be adjusted, based on quality trends.
Customer Complaints 100 Percent Inspection
3.3.2. Unsatisfactory Performance. Any unsatisfactory inspection (defect) result shall be recorded, and the Contractor shall re-perform the service after notification by the COR. Failing to meet the performance threshold as outlined in the SS for any of these performance objectives in any one month period shall result in a warning from the CO. Failing to meet the performance threshold as outlined in the SS of these performance objectives in any combination for any two, or more consecutive or non-consecutive months during a contract period shall constitute an immediate Progress Meeting with the Multi-functional Team. All remedies shall be in accordance with the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance.
3.4. PERIODIC PROGRESS MEETINGS
3.4.1. Meetings. The CO, COR and QRP Manager and/or Solid Waste Manager, other government personnel as appropriate, and the Contractor shall periodically meet to discuss the Contractor’s performance. The following issues shall be discussed: opportunities to improve the contract, required contract modification(s), unsatisfactory inspections and trends against each performance objective observed, positive performance and steps taken by the Contractor to prevent unsatisfactory occurrences in the future. The Contractor shall provide a summation of unsatisfactory inspections and customer complaints and provide insight into any identified trends.
3.4.2. Meeting Minutes. The minutes of these meetings will be reduced to writing, signed by the CO, and any other signatures as deemed appropriate, distributed to the functional area and the Contractor. Should the Contractor not concur with the minutes, the Contractor shall provide a written notification to the CO identifying areas of non-concurrence for resolution.
4. GOVERNMENT FURNISHED PROPERTY/SERVICES/EQUIPMENT. See Appendix B
4.1. Recycling Center/Material Recovery Facility. Provide utility service to the recycling center/material recovery facility and perform facility maintenance and repairs. Provide use of equipment listed in Appendix B.
5. GENERAL INFORMATION
5.1. MISSION
The overall Civil Engineer mission at Columbus AFB is to plan, maintain, operate, and protect the infrastructure, facilities, and environment for assigned Airmen, families, and civilian employees.
5.2. BACKGROUND
5.3. HOURS OF OPERATION
Perform integrated solid waste management services, recycling, during normal duty hours and be available (by phone, pager, cell phone, text message or fax) during the Government Program Office’s hours (7:00 a.m. to 3:30 p.m., Monday through Friday) and for after-hours response to refuse/recycling problems or emergencies. This excludes federal holidays, unless otherwise required in the contract or approved by the CO. There may be situations that require the Contractor to work at times other than normal duty hours. When the Contractor’s work schedule conflicts with an Air Force mission requirement, advise the CO and reschedule the work to minimize disruption.
5.4. HOLIDAYS & CLOSURES
5.4.1. Recognized Federal Holidays. There may be federal holidays when the Contractor is not required to perform service, except in emergency situations or to support specific mission needs. The holidays are:
New Year’s Day - 1 January Martin Luther King Day - 3rd Monday in January Washington’s Birthday 3rd Monday in February Memorial Day - last Monday in May Independence Day - 4 July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran’s Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December Any other holidays as declared by Executive Order
If a holiday falls on a Saturday, the preceding Friday will be observed. If a holiday falls on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the Contractor will be responsible for rescheduling services for the first day after the holiday observance. The Contractor must be provided adequate notification when work is required during a federal holiday.
5.4.2. Other Base Closures. Work scheduled but not accomplished because of base closure due to exercises or real-world events will be accomplished as soon as possible after base reopening.
5.4.3. Performance of Service During Crisis or Heightened Security
The services under this contract are not essential for performance during crisis. The CO will determine circumstances which constitute a crisis based on direction from Security Forces and base leadership.
5.5. CONTRACTOR WORK SCHEDULE
5.5.1. Schedule Submission and Approval. The Contractor shall submit a schedule for all services described in this PWS and Appendices to the CO for approval at the post-award conference. The schedule shall include routes, pickup points, times, and days that pickups will occur. The Contractor shall not deviate from the approved schedule without prior approval from the CO or COR. Permanent changes to the schedule must be submitted 10 days before implementation and receive CO approval before the Government will allow the proposed changes.
The schedule must be submitted electronically using a file format compatible with Government software.
5.5.2. Schedule Changes. Occurrence based (non-permanent) schedule changes due to customer requests or base exercises shall be submitted to the COR and do not require CO approval.
5.6. CONTRACT EMPLOYEES
5.6.1. Contract Manager. The contractor shall establish and maintain an office through which the contract manager or alternate(s) can be contacted during work hours. The contract manager or alternate shall be available during normal duty hours to meet on the installation within 1 hour with the government personnel designated by the CO to discuss problem areas. The contractor shall provide the CO telephone number(s) where validation results and complaints can be reported. The contractor shall also provide to the CO the names and phone numbers of contractor POCs for after business hours including nights, weekends, and holidays. This information will be kept updated by the contractor whenever personnel changes occur. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract.
5.6.2. Personnel. Contractor employees shall present a neat appearance. Contractor employees shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, or hats, bearing the company name or logo. The coloring or design of the items selected should be such that identifies employees easily and quickly for reasons of safety and personal protection. Contractor employees shall identify themselves as contractor employees by introducing themselves or being introduced as contractor employee and displaying distinguishing badges or other visible identification for meetings with Government personnel. Contractor shall appropriately identify himself as a contractor employee in telephone conversations and in formal and informal written correspondence
5.6.3. Employee Restrictions. The Government is authorized to restrict employment under the contract of any contractor employee or prospective contractor employee who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
5.7. CONTRACTOR MANPOWER REPORTING
The Contractor shall report all contractor labor hours (including sub-contractor labor hours) required for performance of services provided under this contract for “U.S. Air Force” via a secure data collection site. The Contractor is required to completely fill in all required data fields using the following web address http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance during each government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the electronic Contractor Manpower Reporting Application (eCMRA) help desk.
Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
http://www.ecmra.mil/
User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.
Invoicing/Payment and Receipt/Acceptance
5.8. SECURITY REQUIREMENTS.
Contractor employees shall comply with Columbus AFB security requirements imposed by the Installation Commander at all times while on Columbus AFB premises. The Contractor shall comply with this guidance and the guidance set forth in CAFB Clause 0006, Columbus AFB Installation Security Requirements and Information. The Contractor shall obtain all necessary passes, decals, badges, or other items required for access to perform contract services at Columbus AFB. The Contractor is responsible for accountability of all such media, which shall be surrendered to the Security Forces Squadron Pass and Registration Section upon completion or termination of the contract or upon termination of an individual’s employment for the Contractor.
The Contractor shall comply with all Columbus AFB policies regarding entry to the installation, rules of the road, contingency operations compliance, and photography prohibitions. Contractor employees are authorized entry to the installation for the purpose of work under this contract only, and are not authorized in other facilities or areas without prior government authorization. Due to safety/security requirements, Contractor personnel shall be required to fluently speak, comprehend, read, and write English.
5.8.1. Base Access The Contractor must be aware that entry requirements are subject to change due to installation and world situations. All employees may be subject to a background check through the FBI for base access.
5.8.2. Main Base Access. Current security access restrictions at Columbus Air Force Base entry gate require all contractor vehicles (which are the size of a standard bread delivery truck or larger) to enter through the Main Gate only. Contractor vehicles may be subject to search prior to gaining base entry. The Contractor should plan and allow for delays as a result of increased and ever-changing security procedures.
5.8.3. Security Manager. Upon contract award, the Contractor shall designate, in writing to the CO, a Security Manager who shall be the Contractor’s point of contact for all security matters.
Within five working days of contract award, the Contractor’s Security Manager shall contact the Civil Engineer Squadron (CES) Security Manager for assistance on accomplishing Contractor personnel security requirements.
5.8.3.1. Security Training. Contractor personnel are required to attend security and OPSEC orientation under Homeland Security Presidential Directive (HSPD) Title 12. The Contractor shall schedule initial and annual refresher training (for all assigned contractor personnel) through the CES Security Manager. All contractor personnel shall be thoroughly briefed by the CES Security Manager on established security requirements and procedures as stipulated in Air Force Policy Directive (AFPD) 31-1, Integrated Defense.
http://www.ecmra.mil/
5.8.3.2. Security Authority. The Contractor shall brief all employees that they shall immediately leave any area upon notification by the CO, COR, constituted authority, Security Forces, or when directed as occasional operational requirements, real world activities, or emergencies dictate.
5.8.4. Restricted/Controlled Areas. Contractor performance within restricted/controlled areas shall require Contractor compliance with various levels of security and established personnel security entry control procedures. The Contractor shall ensure all contractor employees performing services in secured areas are processed for a controlled area, limited access, or visitor badge by the Entry Controller of the restricted/controlled area.
5.8.4.1. Access Coordination. The facility manager/user/occupant/requester will be responsible for providing access, escorts, or temporary visitor access badges for contractor personnel while performing ISWM duties. The Contractor shall be responsible for scheduling access/escorts/badges by contacting the facility manager/requester at the Entry Control Point of the restricted/controlled area.
5.8.4.2. Escorts. At all times while in restricted/controlled areas, contractor employees shall be under direct surveillance of a person from that facility who is cleared to wear a controlled area badge and perform escort duties. Visitor badges shall be returned to the Entry Controller each time the employee completes the duties and leaves the area. This requirement is waived for contractor personnel who have unescorted access privileges and display a controlled area badge for the restricted/controlled areas.
5.8.5. Employee Background Checks. All Contractor employees who do not have a current security investigation acceptable to the Security Forces, and who require a National Agency Check (NAC) for the performance of their duties, shall complete an Electronic Personnel Security Questionnaire (EPSQ), SF 85P, Questionnaire for Public Trust Positions, in three copies (original and two photocopies); and an AF Form 2583, Request for Personnel Security Action. For all employees requiring local area network (LAN) access (if applicable), the Contractor shall submit the following information: full name, date and place of birth, social security account number, affirmation of United States citizenship, and any current security investigation data. Information shall be in writing, on company letterhead, and submitted to Security Forces through the CES Security Manager.
5.8.5.1. Pre-approval Coordination. The CES Security Manager is the source for the necessary forms and will provide instructions for receiving, preparing, and processing these forms. The Contractor shall coordinate with all required facilities to process all necessary paperwork. After forms have been properly completed, the CES Security Manager will make an appointment for contractor employee(s) to go to the Security Forces for submittal of paperwork and fingerprinting.
Appointments will be scheduled within two weeks of request.
5.8.5.2. Badge Issuance. A minimum of 180 days is required to process contractor employee NACs. Additional time will be required if the NAC is unfavorable and may result in denial of entry to restricted/controlled areas or denial of base LAN access. The CES Security Manager will notify the Contractor of any NAC results. After completion of a favorable NAC, each eligible employee shall report to the CES Security Manager for processing of AF Form 2586, Unescorted
Entry Authorization Certificate. The CES Security Manager will schedule appointments for issuance of badges.
5.8.5.3. Access Revocation. The Columbus AFB Installation Commander reserves the right to deny restricted area entry to any contractor employee who’s NAC is unfavorable, and the right to terminate the entry of any employee upon disclosure of information indicating the individual’s continued entry to a secure area is not in the best interest of national security.
5.8.5.4. Badge Validity. Controlled area badges will be valid only for the actual period of employment or the term of the contract, whichever occurs first. Contractor employees must display the controlled area badge on their outer garment above waist level, and must, upon request, surrender the badge to any DoD member for identification verification. Violations or deviations from established security procedures by contractor employees may result in confiscation of controlled area badges and denial of future entry to restricted areas.
5.8.5.5. Contract Personnel Requirements. The Contractor shall not employ persons for work on this contract who are identified to the Contractor by the CO as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
5.8.6. Contractor Vehicles. Contractor vehicles must be maintained in a safe and operational condition at all times while on Columbus AFB.
5.8.7. For Official Use Only (FOUO). The contractor shall comply with DoD 5400-7-R, DoD Freedom of Information Act (FOIA) Program, requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
5.8.8. Reporting Requirements. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security or well-being of DoD personnel, contractor personnel, resources, and classified or unclassified defense information.
5.8.9. Physical Security. The contractor shall be responsible for safeguarding all government property and controlled forms provided for contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.
5.8.10. Key Control. The contractor shall establish and implement methods of making sure all keys/combinations issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons. The contractor shall not duplicate any keys issued by the government. The contractor shall immediately report to the COR or CO any occurrences of lost or duplicated keys. In the event keys other than master keys are lost or duplicated, the contractor may be required, upon written direction of the CO, to re-key or replace the affected lock or locks without cost to the government. The government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such from the monthly payment due the contractor. In the event a master key is lost or duplicated, the government shall replace all locks and keys for that system, and the total cost will be deducted from the monthly payment due the contractor.
5.9. SAFETY REQUIREMENTS AND REPORTS. The contractor shall perform work in a safe manner as required by OSHA Safety and Health Requirements. Provide a verbal report to the CO as soon as possible of each occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact. Provide a completed copy of required Accident Investigation Reports to the CO within five calendar days of each occurrence.
5.10. CONTRACTING OFFICER’S REPRESENTATIVE (COR)
The CO will appoint a primary and alternate CO for management of the day-to-day activities of the contract. The identity, title, and authority of this representative will be provided in writing to the contractor after contract award.
6. APPENDICES.
A. Estimated Workload Data
B. Government Furnished Property/Services/Equipment
C. Acronyms
APPENDIX A
TABLE A1 - ESTIMATED WORKLOAD DATA
ITEM/
CLIN
REF
NAME
ANNUAL
ESTIMATED
QUANTITY
X001 Recyclable Commodity – Paper (white/mixed) 55.13 Tons X001 Recyclable Commodity – Glass 5.77 Tons X001 Recyclable Commodity – Plastic 9.01 Tons X001 Recyclable Commodity – Cardboard 58.02 Tons X002 Unscheduled Pickups 4 Each X002 Special Event Container Placements 3 Each X003 Construction and Demolition (C&D) Container
Placements 4 Each
X004 Public / Common Use Recycling Receptacles 2 Each X006 (Yard and Wood Waste) 18.85 Tons X007 Container Maintenance 200 Each X007 Compactor Maintenance 3 Each
APPENDIX B
GOVERNMENT FURNISHED PROPERTY/SERVICES/EQUIPMENT
Baler 3 Can crusher 1 Power provided Skid Steer 2 Glass Pulverize 1 Water provided Shredder 1 Tractor 1
Scale 1 Trailers 3 Grinder 1 Facility 1
APPENDIX C
ACRONYMS
AFB Air Force Base AFPD Air Force Policy Directive C&D Construction and Demolition Debris CDR Contract Discrepancy Report CES Civil Engineer Squadron CO Contracting Officer COR Contracting Officer’s Representative DD Department of Defense DoD Department of Defense eCMRA Electronic Contractor Manpower Reporting Application EPSQ Electronic Personnel Security Questionnaire FAR Federal Acquisition Regulation FOIA Freedom of Information Act FOUO For Official Use Only GPC Government-provided container HSPD Homeland Security Presidential Directive IAW in accordance with ISWM Integrated Solid Waste Management LAN Local Area Network MFH Military Family Housing MSW Municipal Solid Waste NAC National Agency Check PWS Performance Work Statement QRP Qualified Recycling Program SF Standard Form SS Service Summary SSPP Strategic Sustainability Performance Plan USAF United States Air Force
| PERFORMANCE WORK STATEMENT |
| FOR |
| Columbus AFB |
| 1.1. COLLECTION REQUIREMENTS |
| 1.3. DISPOSAL. |
| 3.1. QUALITY CONTROL |
| 3.2. QUALITY ASSURANCE |
| 3.3. PERFORMANCE ASSESSMENT |
| 3.4. PERIODIC PROGRESS MEETINGS |
| 5. GENERAL INFORMATION |
| 5.2. BACKGROUND |
| 5.3. HOURS OF OPERATION |
| 5.4. HOLIDAYS & CLOSURES |
| 5.4.3. Performance of Service During Crisis or Heightened Security |
| 5.5. CONTRACTOR WORK SCHEDULE |
| 5.6. CONTRACT EMPLOYEES |
| 5.7. CONTRACTOR MANPOWER REPORTING |
| 5.10. CONTRACTING OFFICER’S REPRESENTATIVE (COR) |
| 6. APPENDICES. |
| APPENDIX A |
| APPENDIX B |
File details come from the government source that posted it. Updated .