Questions_&_Answers.docx

DOCX document 12 KB Posted

Attached to
Rolling Shelves Federal contract opportunity
Solicitation number
FA302019QA032
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Rolling Shelves, newest first.
File Type Posted
Question_&_Answer_2.docx DOCX document
Atch_1_-_Drawing.pdf PDF
Combined_Synopsis-Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1) Are the roll up doors required on both sides of every carriage?

- NO, a solid back with a lockable roll-up style door on the front is required.

2) Does that included the 24"d stationary unit on the right, or does it have a closed back on the outside?

- YES, the stationary unit should have a solid back with a lockable roll-up style door on the front.

3) Can you please verify what type of product you will be storing per the 48x24" shelf? Do you have an average dimension for the product to be stored?

- The type of items being stored will include the following: CBRN protective gear (Suit/Boots/Gloves/Masks), Radiological/Chemical detection equipment and gear, body armor, Kevlar helmets, sampling supplies.

- Most "equipment" type items will be shelved in hard Pelican Cases with an average dimension of 20"x15"x8", while other gear will be stacked loose with varying dimensions.

4) Can you please verify the weight capacity required per shelf?

- We would like a weight capacity for each shelf to be 600 lbs.

5) The 3D drawing does not show any doors, but the top down drawing mentions roll up doors on all shelving - can you confirm these are required on all shelving units?

- YES, answered on question 1 above.

6) Are the tracks surface mounted or recessed into the concrete? If they are recessed, we need to confirm that you will be providing the troughs for the tracks and the second pour of concrete to fill in around them?

- Tracks for the shelving unit need to be surface mounted.