Performance_Work_Statement.docx

DOCX document 345 KB Posted

Attached to
Storage Systems Federal contract opportunity
Solicitation number
FA3016-17-U-0201
Issued by
Department of the Air Force Air Education and Training Command

About this file

PWS

View the file

Other files for this federal contract opportunity

Other files attached to Storage Systems, newest first.
File Type Posted
Shelf_Carriage_Picture.JPG JPG image
Shelf_Color_Tan_Picture.JPG JPG image
Request_for_Quote.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

MOBILE STORAGE SYSTEM

USAF BAND OF THE WEST, JBSA-LACKLAND

11 July 2017

1. DESCRIPTION OF SERVICES / GENERAL INFORMATION. The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to install the addition of one matching Spacesaver shelf carriage.

1.1. SPECIFICATIONS.

6’ 11 1/4” Total Upright and 12’ 5 1/8” WD (Three (3) 48” x 30” Sections) 7 Openings; Six (6) 9 ¾” Clear and One (1) 11¼” Clear;

3 Div Per Opening Color: Tan New Ramp, Wood Deck, & Rails

1.2.1. HOURS OF OPERATION. HouHouHouHours of operation are Monday through Friday, from 0730 through 1630 hrs.

1.2.2. HOLIDAYS OBSERVED. Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day, New Year’s Day, Martin Luther King Jr. Birthday, Presidents Day.

1.2.3. SECURITY REQUIREMENTS. Base pass required for access to worksites. No security clearance requirement.

1.3. QUALITY CONTROL. The contractor shall be responsible for quality control for all work accomplished during the performance of the task.

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES. Government will provide suitable and adequate space in Rm 114, Bldg 7246 for installation of mobile storage system. Entry and off-loading to Bldg 7246 shall be through the southeast loading dock or through the double doors on the east side. Parking is available in south parking lot. Electrical power, working lights, heating and air conditioning will be provided.

4. APPENDICES.

A. Maps and/or Site Plans

APPENDIX A

MAPS AND/OR SITE PLANS

Base Map:

image1.jpeg

File details come from the government source that posted it. Updated .