Attachment 3 - Schedule of Material Submittal Register

View the file

Other files for this federal contract opportunity

Other files attached to Convert Maintenance Bay to Cyber Lab, newest first.
File Type Posted
FA3016-17-R-0070_Site-Visit_Sign-in_Sheet.pdf PDF
Attachment_5_-_Progress_Schedule_Example.xls XLS spreadsheet
Attachment_1_-_Specifications.pdf PDF
Attachment_2_-_Floor_Layout_Drawings.pdf PDF
Attachment_4_-_DD_Form_1354.pdf PDF
FA301617R0070.pdf PDF
Attachment_6_-_Wage_Determination_21_July_2017.pdf PDF
Attachment_7_-_Construction_Cost_Estimate_Breakdown.xls XLS spreadsheet
Presolicitation_Notice.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 7 PAGES

CONTRACT NO. Attachment 3 FA3016-17-R-0070

CONVERT MAINT BAY TO LAB

01 11 00 SD-01 Preconstruction Submittals

1.6 GSalvage Plan

1.5 GWork Clearance Request

01 14 00 SD-01 Preconstruction Submittals

1.5.1.1Contact Personnel

01 30 00 SD-01 Preconstruction Submittals

1.2 GView Location Map

1.3 GProgress and Completion

Pictures

01 32 01.00 10 SD-01 Preconstruction Submittals

3.1 GProject Schedule

01 33 16 SD-01 Preconstruction Submittals

1.5.1 GDesign Quality Control Plan

1.5.2.2Initial Design Conference

1.5.2.3Preconstruction Conference

3.4.1 GDCM Procedures

3.7.4 GSubmittal Register

SD-05 Design Data

1.5.2.2Draft Applicable Codes And

Specifications

1.7.1Design and Code Checklists

2.5Sustainable Design

3.5.5.1.1 GInterior And Exterior Building

Finishes Scheme

3.6.3Conference Documentation

3.2 GInterim Design (60-65)

SUBMITTAL REGISTER

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 7 PAGES

FA3016-XXXXXXXX

CONVERT MAINT BAY TO LAB

01 33 16 3.2 GFinal Design (90%)

3.2 GReleased For Construction

(100Reviewed)

SD-11 Closeout Submittals

3.7.5 ADD Form 1354

01 33 29 SD-01 Preconstruction Submittals

1.5.1.1 GPreliminary Sustainability

Notebook

1.5.1.1Preliminary High Performance and Sustainable Building Checklist

SD-07 Certificates

1.4.4Third Party Certification (TPC)

1.4.5Third Party Certification (TPC)

SD-11 Closeout Submittals

GFinal Sustainability Notebook

1.5.1.1 GFinal High Performance and

Sustainable Building Checklist

1.5.1.1 GAmended Final Sustainability

Notebook

3.2.1 GThird Party Certification Plaque

and Certificates

01 35 29 SD-01 Preconstruction Submittals

1.5 GAccident Prevention Plan (APP)

Lead Hazard Control Plan (for description see spec section

13281); GA.

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 7 PAGES

CONVERT MAINT BAY TO LAB

01 35 29 1.6 GActivity Hazard Analysis (AHA)

GCrane Critical Lift Plan

GCrane Operators

SD-06 Test Reports

GAccident Reports

GCrane Reports

GMonthly Exposure Reports

GRegulatory Citations and

Violations

SD-07 Certificates

Confined Space Entry Permit

Hot work permit

01 35 30 SD-08 Manufacturer’s Instructions

GSite Safety and Health Plan

SD-09 Manufacturer’s Field

Reports

GSafety and Health Phase-Out

Report

01 35 35 SD-01 Preconstruction Submittals

1.6 GENVIRONMENTAL

PROTECTION PLAN

SD-02 Shop Drawings

GAsbestos Work Plans

GAsbestos Certifications

GAsbestos Transporter License

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 7 PAGES

CONVERT MAINT BAY TO LAB

01 35 35 GAsbestos Medical clearances

(may be reviewed on site)

GAsbestos Training Certificates

GAsbestos TDSHS License as applicable

GAny Asbestos Inspection reports that have not been provided by the area specific Environmental Office.

GAny Asbestos Inspection Reports that were not included in the original assessment or a results to a change in the scope of work.

GLead Work Plans

GLead Occupant Protection Plan.

GTexas Department of State

Health Services Lead Licenses

GLead Notifications

GLead Training Certificates

GLead Based Paint Reports

GLead Inspection reports

SD-03 Product Data

GAsbestos Air Monitoring reports

GLead Air Monitoring reports

SD-04 Samples

GLead OSHA Negative Exposure

Assessment or

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 7 PAGES

CONVERT MAINT BAY TO LAB

01 35 35 GLead Work Plan.

EPA Lead Training

GLead Awareness Training certificates

GOSHA Air Monitoring

GLead Training Certificates

GWaste Disposal Plan, May be included in work plan

GLead Inspection reports

GLead Based Paint Reports

SD-07 Certificates

1.5.4 GStorm Water Pollution Prevention

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

01 45 00.00 20 SD-01 Preconstruction Submittals

GContractor Quality Control (CQC)

Plan

01 54 23.00 SD-01 Preconstruction Submittals

GFor each type of product indicated

01 78 00 SD-03 Product Data

1.4.1Warranty Management Plan

1.4.4Warranty Tags

Spare Parts Data

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 7 PAGES

CONVERT MAINT BAY TO LAB

01 78 00 1.4.1Instructions

SD-10 Operation and Maintenance

Data

3.3 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.2 GRecord Drawings

As-Built Record of Equipment and Materials

Final Approved Shop Drawings

Construction Contract

Specifications

2.1 GCertification of EPA Designated

Items

01 83 13.07 40 SD-01 Preconstruction Submittals

GMaterial, Equipment, and Fixture

Lists

GQuality Control Plan

SD-02 Shop Drawings

GConnection Diagrams

GFabrication Drawings

SD-03 Product Data

GManufacturer's Catalog Data

GSpecific Equipment Data

1.5 GWarranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 7 PAGES

CONVERT MAINT BAY TO LAB

01 83 13.07 40 SD-05 Design Data

GDesign Analysis and Calculations

SD-06 Test Reports

GAlignment Test

GBalancing Test

GCode and Requirements

Verification Test

GDesign Analysis and Calculations

GVibration Analysis Test

GVisual Inspection

GWarranty Test

SD-07 Certificates

GCertificates;

SD-08 Manufacturer’s Instructions

GManufacturer's Instructions

SD-11 Closeout Submittals

GRecord Drawings

GAcceptance Documentation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR