6_-_Cost_Estimate_Breakdown.pdf

PDF 236 KB Posted

Attached to
Construct A Metal Shade Canopy With Two Overhead 1 Ton Hoists Federal contract opportunity
Solicitation number
FA301617R0056
Issued by
Department of the Air Force Air Education and Training Command

About this file

Attachment 6: Cost Estimate Breakdown

View the file

Other files for this federal contract opportunity

Other files attached to Construct A Metal Shade Canopy With Two Overhead 1 Ton Hoists, newest first.
File Type Posted
Questions_and_Answers.doc DOC document
5_-_Contractor_Responsibility_Questionnaire.docx DOCX document
3_-_JBSA_Base_Pass_Request.pdf PDF
4_-_Financial_Information_Questionnaire.docx DOCX document
FA301617R0056.doc DOC document
1_-_SoW.pdf PDF
2_-_Wage_Determination_02_June_17.pdf PDF
1a_-_Drawings_B241.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Estimate Details Labor - Material - Equipment

General Construction - General Construction - Basic Contract Year - 1/01/2017 to 12/31/2017

Install 40' X 110' Steel Framed Canopy W/2ea 1 Ton Hoist Install a 40' X 110' canopy to cover the supplies and equipment at the rear of building 241. It will be steel framed with a metal roof. Approximately 2' to 3' off the biulding all around.

Avoiding the light fixtures but not covering their illumination. this will be free standing with no utilities. Structure will have 2 each 1 ton electric monorail hoist installed to lift and move items the entire lenght of the structure. Structure will be installed North to South , lenghthwise.

Project Scope:

Division Summary (MF04) 01 - General Requirements 26 - Electrical 02 - Existing Conditions 03 - Concrete

27 - Communications 28 - Electronic Safety and Security

04 - Masonry 31 - Earthwork 05 - Metals 32 - Exterior Improvements 06 - Wood, Plastics, and Composites 33 - Utilities 07 - Thermal and Moisture Protection 34 - Transportation 08 - Openings 35 - Waterway and Marine Transportation 09 - Finishes 41 - Material Processing and Handling Equipment 10 - Specialties 44 - Pollution Control Equipment 11 - Equipment 46 - Water and Wastewater Equipment 12 - Furnishings 48 - Electric Power Generation 13 - Special Construction Alternate 14 - Conveying Equipment Trades 21 - Fire Suppression Assemblies 22 - Plumbing FMR 23 - Heating, Ventilating, and Air-Conditioning (HVAC) MF04 Total (Without totalling components) Totalling Components General Construction Subtotal General Construction Profit (10.0000%) General Construction Labor Burden (35.0000%) General Construction Overhead (15.0000%)

General Construction Bonding (2.5000%)

Material, Labor, and Equipment Totals (No Totalling Components)

Labor:

Equipment:

Other:

Laborhours:

Green Line Items:0

Material:

Priced/Non-Priced Total Priced Items:

Total Non-Priced Items:

Grand Total

Page 1 of 3 Printed 14 APR 2017 2:16PM v2.632

1461618576A Typewritten Text

1461618576A Typewritten Text FA301617R0056 Attachment 6

1461618576A Typewritten Text

Totalling Component Details Description Item Count Applicable Amount Applied Amount Applied Result Balance

General Construction Subtotal Included in Total: Yes Type:Total, Master Format Type: MF04 Values:Total Includes: Priced, Non Priced Filtering: (none)

General Construction Labor Burden Included in Total: Yes Type:Percentage (Project Level), Master Format Type: MF04 Values:Labor Includes: Priced, Non Priced Filtering: (none)

General Construction Overhead Included in Total: Yes Type:Percentage (Project Level) Subtotal based on 2 items: "General Construction Labor Burden", "General Construction Subtotal"

General Construction Profit Included in Total: Yes Type:Percentage (Project Level) Subtotal based on 3 items: "General Construction Labor Burden", "General Construction Overhead", "General Construction Subtotal"

General Construction Bonding Included in Total: Yes Type:Percentage (Project Level) Subtotal based on 4 items: "General Construction Labor Burden", "General Construction Overhead", "General Construction Profit", "General Construction Subtotal"

Page 2 of 3 Printed 14 APR 2017 2:16PM v2.632

Item UM Crew

Install 40 X 110' Steel Framed Canopy W/2ea 1 Ton Hoist

Quantity Material Labor Equipment Unit Cost TotalDescription

01 - General Requirements 1 Architectural fees, for new construction, minimum Project01-11-31-10-0060

2 Engineering fees, structural, minimum Project01-11-31-30-1200

3 Engineering fees, structural, minimum Project01-11-31-30-1200

4 Engineering fees, structural, minimum Project01-11-31-30-1200

01 - General Requirements Total

03 - Concrete 5 Concrete in place, including forms, 4 uses, Grade 60 rebar, portland cement Type I, placement and finishing unless otherwise indicated, footings, strip, 3000 PSI, 24" x 12", reinforced

C.Y.03-30-53-40-3940

03 - Concrete Total

13 - Special Construction 6 Tension structures, rigid steel or aluminum frame, vinyl coated polyester fabric shell, excluding foundations and floors, 60' clear span, 6,000 S.F.

SF Flr.13-31-23-50-0200

13 - Special Construction Total

41 - Material Processing and Handling Equipment 7 Container piece material conveyors, monorail, overhead, manual, channel type, 500 lbs. per L.F.

L.F.41-21-23-16-3900

8 Material handling, hoists, electric overhead, chain, hook hung, 15' lift, 1 ton capacity

Ea.41-22-23-10-2100

2 each hoist to travel 150' the length of the canopy.

9 Material handling, for motor trolley, add (Modified using 41-22-23-10-2800)

Ea.41-22-23-10-2100-2800

2 each hoist to travel 150' the length of the canopy.

10 Material handling, for lifts over 15', 1 ton, add (Modified using 41-22-23-10-3000)

L.F.41-22-23-10-2100-3000

2 each hoist to travel 150' the length of the canopy.

41 - Material Processing and Handling Equipment Total

Estimate Grand Total

Page 3 of 3 Printed 14 APR 2017 2:16PM v2.632

File details come from the government source that posted it. Updated .