Attachment_5_-_Appendix_D_DD_Form_1354_Checklist.pdf

PDF 239 KB Posted

Attached to
Building 10902 HVAC Federal contract opportunity
Solicitation number
FA3016-16-T-0050
Issued by
Department of the Air Force Air Education and Training Command

About this file

Attachment 5 - Appendix D DD Form 1354 Checklist

View the file

Other files for this federal contract opportunity

Other files attached to Building 10902 HVAC, newest first.
File Type Posted
FA3016-16-T-0050-0001.pdf PDF
Attachment_8_-_Wage_Determination_02_September_2016.pdf PDF
Attachment_5_-_Appendix_D_DD_Form_1354.pdf PDF
Attachment_9_-_Schedule_of_Material_Submittals.pdf PDF
Attachment_3_-_Appendix_B.pdf PDF
Attachment_8_-_Wage_Determination_17_June_2016.pdf PDF
Attachment_10_-_AETC_Form_47.pdf PDF
Attachment_7_-_Local_Information.pdf PDF
Attachment_2_-_Appendix_A.pdf PDF
Attachment_4_-_Appendix_C.pdf PDF
Attachment_1_-_Statement_of_Work.pdf PDF
Attachment_6_-_Appendix_E.pdf PDF
FA3016-16-T-0050.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Description/Title:

BOD Date:

Category Codes Nomenclature Total SF

Exterior Dimensions:

Main Bldg:

Wings:

Offsets:

No. of Stories:

Foundation:

Floors:

Exterior Walls:

Roof:

Fire Protection.

Category Nomenclature Unit Quantity Cost

880-211 Closed Head Auto Sprinklers SFIHD -$

880-212 Open Head Deluge System SFIHD -$

880-216 Pre-action Sprinkler System SF/HD -$

880-217 AFFF PA Sprinkler System SF/HD -$

880-218 Hi-expansion Foam, System EA -$

880-221 Auto Fire Protection System SF/EA -$

880-222 Manual Fire Alarm System EA -$

880-231 CO2 Fire System EA -$

880-232 Foam Fire System EA -$

880-233 Other Fire System EA -$

880-234 Halon 1301 Fire System EA -$

880-235 Dry Chemical System EA -$

880-236 Foam System EA -$

Security.

Category Nomenclature Unit Quantity Cost

872-841 Security Alarm System EA -$

DD Form 1354 Checklist

Type of Construction:

Total Cost

-$ Total Project Cost

1. General Building Data.

Project #:

Electric (Phase, voltage, wire):

Other Utility (Type, capacity, etc.):

Utilities:

Square Footage

Dimensions of Covered Walkways/Corridors:

Water (Type and size of pipe):

2. Installed Systems & Plants.

Gas (Type and size of pipe):

Total Fire Protection Cost

FA3016-16-T-0050 Attachment 5

Installed Plants.

Category Nomenclature Unit Quantity Cost

890-124 A/C From Central Plant SF -$

890-126 A/C Window Units SF/TN -$

890-125 A/C Plant < 5 Tons SF/TN -$

890-121 A/C Plant 5 to 25 Tons TN -$

826-122 A/C Plant 25 - 100 Tons TN -$

826-123 A/C Plant Over 100 Tons TN -$

821-115 Heating Plant MB -$

811-147 Emergency Power Generator KW -$

124-XXX Fuel Tank for Htg/Generator GA -$

Category Nomenclature Unit Quantity Cost

116-XXX Pads (Type: SY -$

411-XXX Large Storage Tanks BL -$

Contents:

812-223

*(60060)

Pri Elec Distr - Overhead LF -$

*Transformers KVA -$

*Power Poles LF/EA -$

812-224

*(60065)

See Elec Distr - Overhead LF -$

812-225

*(60070)

Pri Elec Distr - Underground LF -$

*Transformers KVA -$

*Power Poles LF/EA -$

812-226

*(60075)

See Elec Distr - Underground LF -$

812-926

*(60170)

Exterior Area Lighting

(Street/Parking Lights)

EA -$

824-464

*(60130)

Gas Mains LF -$

831-169 Sewage Septic Tank KG -$

832-255

*(60040)

Industrial Waste Mains LF -$

832-266

*(60050)

Sanitary Sewer Mains LF -$

841-161 Water Supply Mains LF -$

842-245

*(60005)

Water Distr Mains LF -$

843-315

*(60015)

Fire Hydrants EA -$

851-143

*(50195)

Curbs & Gutters LF -$

851-145

*(50230) Driveway SY -$

851-147

*(50205/50210) Road (50205 is asphalt and 50210 is concrete)

SY/LF -$

3. Related Facilities.

Total Installed Plants Cost

Category Nomenclature Unit Quantity Cost

852-262

*(50240)

Vehicle Parking SY -$

852-289

*(50300)

Sidewalk SY -$

871-183

*(50190)

Storm Drains LF -$

872-247

*(50040)

Security Fence LF -$

872-248

*(50030)

Interior Fence LF -$

890-144 Compressed Air Distr (x-line) LF -$

890-158 Load/Unload Platform (x-line) SF -$

890-187 Utility Vault (x-line) SF -$

890-272 EMCS Field Equipment (x-line) EA -$

890-273 EMCS Data Links (x-line) LF -$

135-583 Telephone Duct LF -$

135-586 Telephone Pole LF/EA -$

Demolition Cost Related to Project 1 JB -$

* In general, if the project was funded in part or in whole with minor construction (EEIC 529) or

MCP funds, a DD Form 1354 is required in order to transfer the completed construction to real property records.

4. Additions to Existing Facilities. Use checklists 1 - 3 above. Include any plants, systems, real property installed equipment, or related facilities added, removed, or replaced.

5. Alterations or Renovations to Existing Facilities. Use checklists 1 - 3 above. Include plants, systems, real property installed equipment, or related facilities added, removed, or replaced. If demolition of existing facilities was a part of the project, include the specifics and costs related to the demolition.

6. Remarks. Where needed, add any explanatory remarks or descriptions, which more fully describe items.

7. When is a DD Form 1354 Required?

* Initial construction of a new facility

* Demolition of an existing facility (and all its associated related real property)

* Removal of, or upgrade to, an installed system

Total Related Facilities Cost

* Addition to an existing facility

Project Remarks (attach blank sheet for continuations)

Construction Deficiencies (attach blank sheet for continuations)

(Note: " * " denotes Facility Number)

File details come from the government source that posted it. Updated .