Amendment 1.pdf

PDF 527 KB Posted

Attached to
Repair Second Street Federal contract opportunity
Solicitation number
FA301020R0029
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section B - Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) were modified:

0001 - MAHG 20-1085 Repair Second Street WO# 82896 IAW Statement of Work, Specifications, and Drawings.

INFORMATION FROM TO

CIN 00000000000005364741

Section C - Specification/SOW/SOO/ORD

Miscellaneous text in this section has been modified to:

Questions & Answers- Repair Second Street

1. The plans call for 1.5" of milling and 3" of new asphalt. The road already has too high of a crown, and is flush with the curb and gutter. The gutters would have to be filled to put 3" of asphalt on it after milling only 1.5". Other recent jobs that called for 2" of milling and 2" of asphalt. Is this correct?

A. The project will change to 2" Mill and 2" Overlay. The SOW and DWGs will be updated to reflect the change to 2" Mill and 2" Pavement Overlay.

Section J - List of Attachments

The following attachments were added:

Attachment 1 - Repair Second Street SOW (Rev 2) Attachment 3 - Repair Second Street DWG (Rev 1)

The following attachments were deleted:

Attachment 1 - Repair Second Street SOW (Rev 1) Attachment 3 - Repair Second Street DWG

FA301020R00290001

IDCode:
Page: 1
Pages: 2
AmendNo: 0001
EffDate: 7/29/2020
ReqNo: F2J31D0108AW03
ProjNo: MAHG 20-1085
IssCode: FA3010
AdmCode:
IssuedBy: FA3010 81 CONS CC

310 M ST BLDG 4605

CP 228 377 3230

KEESLER AFB, MS 39534-2701

United States Frederick Cherry, Email: frederick.cherry@us.af.mil Telephone: 228-377-1822

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA301020R0029
SolDate: 7/10/2020
AwardChg:
AwardNo:
AwardDate:
Amended: 1
OffrExt:
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G
ChgeOrd:
ChgeOrder:
Modify:
SuppAgre:
SuppAuth:
ModOthr:
OthrSpec:
NoReq: 1
Require:
Copies:
Descript: The purpose of this amendment is to:

1. Provide Questions & Answers

2. Incorporate updated Attachment 1 - Repair Second Street SOW (Rev 2) and Attachment 3 - Repair Second Street DWG (Rev 1).

ContNameTitle:
CoNameTitle: Kimberley Alvarez

Email: kimberley.alvarez.1@us.af.mil Telephone: 228-377-1837

ContDate:
CODate:

File details come from the government source that posted it. Updated .