Attachment_2_MAHG171056_SPEC.pdf

PDF 3 MB Posted

Attached to
LRS Wash Rack Federal contract opportunity
Solicitation number
FA301018R0031
Issued by
Department of the Air Force Air Education and Training Command

About this file

Attachment 2 - Specifications

View the file

Other files for this federal contract opportunity

Other files attached to LRS Wash Rack, newest first.
File Type Posted
Amend_1.pdf PDF
Attachment_10_-_SPEC_32_31_13.pdf PDF
Attachment_9_-_ADDENDUM_1.pdf PDF
Site_Visit_Sign_In.pdf PDF
Attachment_8_-_SF_1444.pdf PDF
FA301018R0031.pdf PDF
Attachment_6_-_PPQ.pdf PDF
Attachment_3_MAHG171056_DWG.pdf PDF
Attachment_7_-_Reference_List.pdf PDF
Attachment_1_MAHG171056SOW.pdf PDF
Attachment_5_WD_MS180141.pdf PDF
Attachment_4_AF66.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT:

REPAIR/RENOVATE OPS WASH RACK

BUILDING 4431

PROJECT NUMBER: MAHG17-1056

08 JUNE 2018

KEESLER AIR FORCE BASE BILOXI, MISSISSIPPI

Keesler AFB 508 L Street Keesler AFB, MS 39534

Attachment 2

FA301018R0031

MAHG18-1015

23MARCH2018

INDEX

SECTION NAME

00 10 20 DRAWING LIST

01 30 00 SUBMITTALS

01 73 20 SELECTIVE DEMOLITION

03 30 00 CAST IN PLACE CONCRETE

05 50 00 METAL FABRICATION

06 10 00 ROUGH CARPENTRY

07 40 00 PREFORMED METAL ROOFING

07 92 00 JOINT SEALANTS

08 11 13 STEEL FRAMES

08 71 00 DOOR HARDWARE

08 90 00 LOUVERS

09 91 00 PAINT

16 00 00 GENERAL PROVISIONS – ELECTRICAL

22 05 29 PLUMBINF HANGERS AND SUPPORTS

22 11 00 PIPING SYSTEM

32 31 01 DECORATIVE FENCE PRODUCTS

COLUMBIA LIGHTING FIXTURE DATA SHEET

COLUMBIA LIGHTING FIXTURE SPECIFICATION

MAHG18-1015

23MARCH2018

SECTION 00 10 20

LIST OF DRAWINGS

PART 1 GENERAL

1.1 SUMMARY

This document lists the drawings for the project.

1.2 CONTRACTDRAWINGS

Contract drawings are as follows:

DRAWING No. TITLE

G1.0 TITLE SHEET

A1.0 SITE PLAN, DEMOLITION PLAN & NEW PLANS

A2.0 ELEVATIONS & SECTION

A3.0 ENLARGED PLAN, ELEVATION, SECTIONS & DETAILS

E1.0 ELECTRICAL PLAN, DIAGRAM AND SCHEDULE

END OF SECTION

MAHG17-1056

08JUN2018

Section 01 30 00_1-3

SECTION 01 30 00

SUBMITTALS

1.01 GENERAL

A. Related Requirements Specified Elsewhere

1. General Conditions-Statement of Work

B. Send all submittals to:

Fernanda Silva (Designer) Vectrus Mission Systems 508 L. Street Bldg. 4705 Keesler AFB MS 39534 W: 228-377-5755 fernanda.silva.ctr@us.af.mil

1.02 CONSTRUCTION SCHEDULE

A. Provide projected construction schedules for entire work, revise periodically.

B. Prepare in form of horizontal bar chart.

1. Provide separate horizontal bar column for each trade or operation.

2. Order: Chronological order or beginning of each item of work.

3. Identify each column:

a. By major specification section number.

b. By distinct graphic delineation.

4. Horizontal time scale: Identify first workday of each week.

5. Scale and spacing: To allow space for updating.

C. Provide complete sequence of construction by activity.

1. Shop Drawings, Product Data and Samples:

a. Submittal dates.

b. Dates reviewed copies will be required.

2. Product procurement and delivery dates.

3. Dates for beginning and completion of each element of construction, specifically:

Ordering/Delivery of Materials Preparation of Installation site Installation of Carpeting and accessories

D. Show projected percentage of completion for each item of work as of first day of each month.

1.03 SUB-CONTRACTORS AND SUPPLIERS

A. Submit to the Contracting Officer within 10 days of award of contract a list of all sub contractors to be used on the work.

B. Submit to the Contracting Officer within 10 days of award of contractor a list of all suppliers and material men furnishing products to be incorporated in the work not a part of a sub-contract.

mailto:fernanda.silva.ctr@us.af.mil

Section 01 30 00_2-3

C. Lists shall include company name, address, phone number and contact person if applicable.

1.04 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES

A. Submit to the Designer samples and product data on the following:

1. Doors and Louvers

2. Joint Sealants

3. Guardrail system

4. Chain-link Fence

5. Bollard

6. Door hardware

7. Steel Frames

8. Paint

9. Any and all contingent components deemed necessary by the Contracting Officer.

B. Each submittal shall be forwarded to:

Fernanda Silva (Designer) Vectrus Mission Systems 508 L. Street Bldg. 4705 Keesler AFB MS 39534 W: 228-377-5755 fernanda.silva.ctr@us.af.mil with a separate transmittal letter identifying specification section and number pertinent to submittal. Transmittal letter shall delineate all variations of product submitted from that specified.

C. Designate on the Construction Schedule dates for submission and dates reviewed shop drawings, product data and samples will be needed for each product.

D. Product Data

1. Manufacturer's standard schematic drawings:

a. Modify drawings to delete information not applicable to project.

b. Supplement standard information to provide additional information applicable to project.

2. Manufacturer's catalog sheets, brochures, diagrams, schedules, performance charts, illustrations and other standard descriptive data.

a. Clearly mark each copy to identify pertinent materials, products or models.

b. Show dimensions and clearances required.

c. Show performance characteristics and capacities.

d. Show wiring diagrams and controls.

E. Contractor Responsibilities

1. Review shop drawings, product data and samples prior to submission.

2. Verify:

a. Field measurements.

b. Field construction criteria.

c. Catalog numbers and similar data.

3. Coordinate each submittal with requirements of work and of Contract Documents.

4. Contractor's responsibility for errors and omissions in submittals is not relieved by

Contracting Officer's review of submittals.

5. Contractor's responsibility for deviations in submittals from requirements of Contract

Documents is not relieved by Contracting Officer's review of submittals, unless

Attachment 2 mailto:fernanda.silva.ctr@us.af.mil

Section 01 30 00_3-3

Contracting Officer gives written acceptance of specific deviations.

6. Notify Contracting Officer in writing at time of submission of deviations in submittals from requirements of Contract Documents.

7. Begin no work which requires submittals until return of submittals with Contracting

Officer's stamp and initials or signature indicating review.

8. After Contracting Officer's review, distribute copies.

F. Submission Requirements

1. Schedule submissions at least ten days before dates reviewed submittals will be needed.

2. Submit number of shop drawings and product data and samples which Contractor requires for distribution plus two copies which will be retained by Contracting Officer on all items.

3. Accompany submittals with transmittal letter, in duplicate, containing:

a. Date

b. Project title and number

c. Contractor's name and address

d. Identification of product or material

e. Relation to adjacent structure or materials

f. Field dimensions, clearly identified as such

g. Specification section number. Applicable standards, such as ASTM number or

Federal Specification.

I. Contractor's stamp initialed or signed certifying to review of submittal, verification of field measurements and compliance with Contract Documents.

G. Resubmission Requirements

1. Shop Drawings:

a. Revise initial drawings as required and resubmit as specified for initial submittal.

b. Indicate on drawings any changes, which have been made other than those requested by Contracting Officer.

2. Product Data and Samples: Submit new data and samples as required for initial submittal.

08JUNE2018

SECTION 01 73 20_1/3

SECTION 01 73 20

SELECTIVE DEMOLITION

PART 1 - GENERAL

Section Includes:

Demolition and removal of selected portions of building or structure.

1.2 DEFINITIONS

Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or removed and reinstalled.

Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated.

Existing to Remain: Existing items of construction that are not to be permanently removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.

PREINSTALLATION MEETINGS

Predemolition Conference: Conduct conference at Project site.

1.3 INFORMATIONAL SUBMITTALS

Qualification Data: For refrigerant recovery technician.

Predemolition Photographs or Video: Submit before Work begins.

Statement of Refrigerant Recovery: Signed by refrigerant recovery technician.

1.4 CLOSEOUT SUBMITTALS

Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility licensed to accept hazardous wastes.

1.5 FIELD CONDITIONS

Conditions existing at time of inspection for bidding purpose will be maintained by THE GOVERNMENT as far as practical.

Before selective demolition, THE GOVERNMENT will remove the following items:

Furnishings within the area of work.

Notify Contracting Officer of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.

Hazardous materials will be removed by THE GOVERNMENT before start of the Work.

Unless specifically stated as part of the project.

If suspected hazardous materials are encountered, do not disturb; immediately notify THE

GOVERNMENT. Hazardous materials will be removed by THE GOVERNMENT under a separate contract.

Storage or sale of removed items or materials on-site is not permitted.

Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations. Maintain fire-protection facilities in service

SECTION 01 73 20_2/3

during selective demolition operations.

PART 2 - PRODUCTS

2.1 PEFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.

C. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to Contracting Officer.

3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.

A. Comply with requirements for existing services/systems interruptions specified in

Section 01100 "Summary."

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished.

A. Arrange to shut off indicated utilities with utility companies.

B. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.

a. Equipment to Be Removed: Disconnect and cap services and remove equipment.

b. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.

3.3 PREPARATION

A. Temporary Shoring: Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

3.4 SELECTIVE DEMOLITION, GENERAL

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to

SECTION 01 73 20_3/3

minimize disturbance of adjacent surfaces. Temporarily cover openings to remain.

B. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

C. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain fire watch and portable fire-suppression devices during flame-cutting operations.

D. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

E. Dispose of demolished items and materials promptly.

Removed and Reinstalled Items:

Clean and repair items to functional condition adequate for intended reuse.

Pack or crate items after cleaning and repairing. Identify contents of containers.

Protect items from damage during transport and storage.

Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Contracting Officer, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.

3.5 DISPOSAL OF DEMOLISHED MATERIALS

General: Except for items or materials indicated to be recycled, reused, salvaged, reinstalled, or otherwise indicated to remain THE GOVERNMENT's property, remove demolished materials from Project site and legally dispose of them in an EPA-approved landfill.

Do not allow demolished materials to accumulate on-site.

Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.

Comply with requirements specified in Section 01524 "Construction Waste Management."

Burning: Do not burn demolished materials.

Disposal: Transport demolished materials off THE GOVERNMENT's property and legally dispose of them.

3.6 CLEANING

Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

SECTION 05 50 00_1/4

SECTION 05 50 00

METAL FABRICATIONS

1.01 DESCRIPTION

A. The work required under this Section consists of steel lintels, metal stairs, ladders, roof scuttles, metal fabrications, miscellaneous bolts, anchors, fastenings, shop painting and related items to complete the work as indicated on the Drawings and described in the Specifications.

B. Related Requirements Specified Elsewhere

1. Section 01300 - Submittals

2. Section 09900 - Painting

1.02 SUBMITTALS

A. Submittal data shall be submitted in accordance with Section 01300 - Submittals.

B. Submit shop drawings for all work herein. Drawings shall be completely detailed and dimensioned and show the following:

1. General arrangement

2. Design

3. Kind of metal

4. Sizes

5. Finish

6. Indicate fabrication

7. Assembly and erection details

8. Pattern

9. Clearances

10. All necessary connections to adjacent work

1.03 INDUSTRY STANDARDS

A. Comply with applicable current standard Specifications of:

1. American Society for Testing and Materials (ASTM)

2. American Institute of Steel Construction (AISC)

3. National Association of Ornamental Metal Manufacturers

4. American Welding Society's Code for Welding in Building Construction

1.04 HANDLING AND STORAGE

A. Protect products during transport and delivery to prevent scraping of shop painting. Store all products in an area protected from weather, moisture and damage. Handle all products so as to prevent damage, warping or rusting.

PART 2 - MATERIALS

2.01 METALS

A. Use best commercial quality for purposes specified, of new stock of domestic manufacture, free from defects that may impair strength, durability or appearance.

SECTION 05 50 00_2/4

B. Mild-Steel: Hot rolled, low carbon, AISC M 1020

C. Structural Steel: Weights of connections and accessories to be adequate to sustain safely and withstand stresses and strains to which normally subjected. Use new domestic material conforming to ASTM A 36 and to Industry Standards listed herein.

2.02 FABRICATION

A. Unless otherwise indicated all ironwork shall be mild or structural steel at the Contractor's option.

B. Verify measurements in field, as required, for work fabrication to fit job conditions.

C. Fabricate work in ample time not to delay job progress; deliver to job as such time required for proper coordination.

D. Fabricate and form work true to detail, with clean straight, sharply defined profiles. Iron shall have smooth finished surfaces unless otherwise indicated. Shearing and punching shall leave clean true lines and surfaces.

E. Fastenings shall be concealed where practical. Thickness of metal and details of assembly and supports shall give ample strength and stiffness. Joints exposed to weather shall be formed to exclude water. Provide holes and connections for the work of other trades.

F. Make joints of such character, assembly to be strong, rigid at adjoining sections. Weld or rivet permanent connections. Welds and flush rivets shall be finished flush and smooth on surfaces that will be exposed after installation; welds continuous. Do not use screws or bolts where they can be avoided; where used, heads shall be countersunk, screwed up tight and threads nicked to prevent loosening. Unexposed welded joints may be continuous or spot welded as required. Remove weld spatter from adjacent surfaces.

G. Casting shall be uniform quality free from blowholes, porosity, hard spots, shrinkage, distortion or other defects. Casting shall conform to dimensions indicated with a tolerance of + 1/8" except in the dimensions to of covers and openings to receive them shall be limited to plus or minus 1/16".

Casting shall be smooth and well cleared by shot blasting or other approved methods. Covers subject to street or foot traffic shall be machined horizontal bearing surfaces; provide machined bearing or contact surfaces for other joints where indicated or required.

2.03 FASTENINGS

A. For exposed work: Use same material, color and finish of material to which applied.

B. Provide miscellaneous bolts, anchors, and fastenings where necessary to carry out work as specified or shown on Drawings and of sizes, materials and types indicated or required.

2.04 SHOP PAINTING

A. Thoroughly clean all ferrous miscellaneous metal, in accordance with SSPC-SP-6-63 Commercial Blast Cleaning, to remove all dirt, grease, rust, scale and foreign matter.

B. Treat all galvanized metal in accordance with shop coat before painting.

C. Unless otherwise specified, shop-paint all metal items, including galvanized metal. Do not paint bronze, aluminum, or stainless steal. Surfaces inaccessible after assembly shall be painted before

SECTION 05 50 00_3/4

assembly. Work paint thoroughly into joints.

D. Materials shall be Tnemec 1009 Gray or approved equal.

2.13 STRUCTURAL STEEL FRAMES

A. Fabricated frames fabricated of structural steel, continuously welded intersections of all members, except removable members, with exposed welds ground smooth. Provide stops of solid sections welded in place.

B. Where frames abut masonry, attach at center of frame and at intervals of not over 8 inches, using not less than three anchors per side of frame. Provide wall anchors of appropriate size and strength to withstand required wind load rating.

C. Make provisions for installation of hardware.

2.14 SPECIAL FRAMING

A. Secure blocking and steel work as indicated. Attach structural steel sections to the supporting members in all locations. Provided bolts to engage the blocking and steel work in all cases.

2.15 SUPPLEMENTAL FRAMING

A. Provide supplemental framing under the sections covering items requiring supplemental framing for support, in accordance with requirements specified herein and as required by loading limitations on structural drawings.

B. Provide continuous slotted metal channels of standard commercial products, sheet steel hot-dip galvanized before fabrication, and provide complete with spring-held nuts for rod hangers and connection brackets and fasteners for connecting channels to channels.

C. Provide other metal supports of structural steel conforming to ASTM A 36/A36M, furring-type channels, or other approved metal supports. Hot-dip galvanized or prime paint to match hangers and other items for which supplemental framing is being provided.

SECTION 05 50 00_4/4

2.16 WELDED STUDS

A. Provide studs headed as indicated or as required for intended use. Provide studs of cold-drawn bar stock conforming to ASTM A 108, Grade 1015 or 1020, and conform to requirements of AWS D1.1.

B. Provide headed studs of dimensions indicated. Provide head dimensions and lengths of other welded anchor studs of standard dimensions produced by a reputable manufacturer, unless greater lengths are indicated.

2.18 MISCELLANEOUS SUPPORTS

A. Provide miscellaneous supports as shown or as required for substantial support of the applicable items, including counters, supports for overhead grilles, roll-up doors, benches, window wall partition braces, electric closet transformers. Provide steel embeds for security equipment and furnishings.

3.01 INSTALLATION

A. Erect work with mechanics experienced in erection of respective types of materials.

B. Work shall be strong, secure and adequate for purposes intended.

C. Material and workmanship not conforming to the provisions of these Specifications shall be rejected at any time during the progress of the work. Rejected workmanship shall be corrected immediately after notification. Rejected material shall be removed from the project site at the time of such rejection.

D. Insulate dissimilar materials in contact or in contact with other metals in such a manner as to prevent corrosion. All steel in contact with concrete or earth shall have two coats of approved black asphaltic paint applied over shop coat. Use materials required for such results as approved by the Architect.

SECTION 06 10 00_1/2

SECTION 06 10 00

ROUGH CARPENTRY

PART 1 – GENERAL

A. Rough carpentry includes carpentry work not specified as part of other sections and which is generally not exposed, except as otherwise indicated. Types of work in this Section include rough carpentry for:

1. Wood nailers and blocking

2. Other rough carpentry indicated

B. Related Sections include the following:

1. Division 6 Section “Finish Carpentry”

2. Division 6 Section “Interior Architectural Woodwork”

1.2 DELIVERY STORAGE, AND HANDLING

A. Keep materials dry at all times. Protect against exposure to weather and contact with damp or wet surfaces. Stack lumber and provide air circulation within stacks.

1.3 PROJECT CONDITIONS

A. Fit carpentry work to other work; scribe and cope as required for accurate fit. Correlate location of furring, nailers, blocking, and similar supports to allow proper attachment of other work.

PART 2 – PRODUCTS

2.1 MATERIALS

A. Framing Lumber:

1. Miscellaneous Lumber:

a. Provide wood for support or attachment of other work including bucks, nailers, blocking, furring, stripping and similar members. Provide lumber of sizes shown or specified worked into shapes shown.

b. Grade: Standard or No. 2 Southern Pine.

c. Treated wood for exterior applications and at locations where wood meets concrete.

B. Plywood:

1. Plywood Backing Panels: For mounting millwork, provide fire retardant treated plywood panels with grade designation, APA C-C Plugged INT with exterior glue, in 3/4" thickness, 6 ply construction.

2.2 ACCESSORIES

1. Fasteners and Anchorages: Provide size, type, material and finish as indicated and as recommended by applicable standards, complying with applicable Federal Specifications for nail, staples, screws, bolts, nuts, washers and anchoring devices.

PART 3 – EXECUTION

3.1 INSTALLATION

A. General Requirements:

1. Discard units of material with defects which might impair quality of work, and units

SECTION 06 10 00_2/2

which are too small to use in fabricating work with minimum joints or optimum joint arrangement.

2. Framing lumber and other rough carpentry shall be fitted closely, set accurately to the required lines and levels and shall be secured in place in a rigid and substantial manner.

3. All framing and support members, not indicated or specified, shall be provided as necessary for the proper completion of the work.

4. Spiking, nailing and bolting shall be done in an approved manner; spikes, nails and bolts shall be of the proper size, and care shall be used so as not to split the members.

5. Provide framing to support all edges of covering material.

B. Wood Nailers, and Blocking:

1. Provide wherever shown and where required for attachment of other work. Form to shapes as shown or required and cut as required for true line and level of work to be attached. Coordinate location with other work involved.

2. Attach to substrates as required to support applied loading. Countersink bolts and nuts flush with surfaces, unless otherwise shown. Build into masonry during installation of masonry work.

3. 12" o.c. along intermediate supports, and 3/8" minimum from panel edge.

SECTION 07 40 00_1/8

SECTION 07 40 00

PREFORMED ROOFING AND SIDING

1.01 DESCRIPTION

A. The work required under this Section consists of materials and labor to furnish and install the standing seam metal roof and associated accessories to form a weathertight installation as indicated on the Drawings and described in the Specifications.

1.02 QUALITY ASSURANCE

A. For the purpose of designating quality and type of the standing seam roof system, the products manufactured or distributed by Butler Manufacturing Co., form the basis of this Specification.

Products manufactured by ASC Pacific, Inc. and ECI Building Components, Inc., which meet the requirements of the specifications and drawings shall be considered as equals.

B. Products of other manufacturers will be reviewed for consideration as an approved equal upon the submittal of the appropriate product data and samples in accordance with Section 01300 - Submittals.

C. Installers of metal roof system shall submit written certification that they are an experienced and qualified application of the manufacturer's system, from said manufacturer.

1.03 SUBMITTALS

A. Submit data in accordance with Section 01300 - Submittals.

B. Submit shop drawings, brochures, and design data including, but not limited to, the following:

1. Panel Layout Drawings

2. Materials, including finishes and gauges

3. Framing and Details

4. Connections Details

5. Accessories and Miscellaneous items

6. Flashing Details

7. Design criteria and calculations

C. Metal roofing manufacturer shall furnish shop and installation drawings for Project.

D. Furnish sample copy of warranty.

1.04 COORDINATION

A. The Contractor shall make provisions for these products to be built into the other trades as indicated on the Drawings.

B. The preformed metal roof and siding will be the product of one manufacturer.

1.05 INDUSTRY STANDARDS

SECTION 07 40 00_2/8

A. American Society for Testing and Materials (ASTM).

B. American Institute of Steel Construction (AISC).

C. American Welding Society's Code for Welding in Building Construction.

D. Metal Building Manufacturers Association (MBMA).

1.06 HANDLING AND STORAGE

A. Protect products during transport and delivery to prevent scraping or abrading of shop or finish painting. Store all products in an area protected from weather, moisture, and damage. Handle all products so as to prevent damage, warping or rusting.

1.07 DESIGN CRITERIA

A. Design roofing system including uniform wind load capacity, roof panels, panel clips, substrate, and fasteners in accordance with Miami Dade Standards. Calculate wind pressures normal to the roof surface in accordance with ACSE 7.

B. Design loads are indicated.

C. Design connection of panel anchor clips purlins to resist loads developed by indicated pressures with prop regard for prying forces and/or bending due to eccentric loading. Evaluate performance at extreme positions of thermal movement. On third increase in allowable load is permitted for wind pressures. For design of system use allowable stresses in accordance with AIS use 2.5 factor of safety on testing of connections. Submit test data for any means of connection other than welds or threaded bolts and nuts covered by allowable stresses in code.

D. Design roofing system to meet or exceed performance required under wind uplift pressures indicated. Design and size components and connections to meet requirements of UL 580 for Class 90 Wind uplift.

E. Withstand 250 pounds (114 kg) applied to 4 square inch (2,500 mm2) area located in center of panel between leg and without buckling, permanent panel distortion, or side-lap separation.

F. Static Pressure Air Infiltration of Completed Metal Roof System: Including vapor barrier, provide maximum 0.01-cfm/square foot (0.051-L/s per-m2) with 6.24psf (30.5 kg/m2) air-pressure differential when tested in accordance with ASTM E 283.

G. None other than condensation when exposed to dynamic rain and 70-mph (113-km-per-hour) wind velocities for not less than 5 minute duration, when tested in accordance with AAMA 501.1 or ASTM E 331.

H. Certified by registered professional engineer, provide minimum safety factor for anchoring fasteners into metal of 2.35.

I. Uniform Static Air Pressure Difference: For standing seam metal roofing system, including panel-to-clip and clip-to-structure, submit certification that requirements of ASTM E 1592 have been made.

J. Components furnished shall be of gauge, size, strength and configuration as required to resist a

SECTION 07 40 00_3/8

wind-load of 130mits per hour without exceeding a deflection of 1/180th of the span. Section properties shall be calculated per AISI Cold Formed Steel Design Manual.

K. Live load = 20psf.

L. When tested by UL method 580 roof deck assembly shall qualify for a Class 90 wind uplift rating.

1.08 QUALIFICATIONS

A. Manufacturer shall be company specializing in manufacturing the products specified in this section.

B. Installer shall be authorized and trained by the manufacturer and specialized in installing preformed metal roofing systems.

1.10 DELIVERY, STORAGE, AND HANDLING

A. Deliver products to site and store, protect, and handle under provisions of Section 01600.

B. Stack preformed and pre-finished material to prevent twisting, bending, and abrasion and to provide ventilation. Slope metal sheets to ensure drainage.

C. Prevent contact with materials, which may cause discoloration or staining.

1.11 WARRANTY

A. Upon completion of the work, furnish a written guarantee from the manufacturer, an unlimited twenty (20) year guarantee for water tightness covering the entire system for material and workmanship.

B. In addition to the manufacturer's guarantee above, upon completion of the job, furnish a written roofing and flashing guarantee to run two (2) years from the date of Substantial Completion.

1. Wording of the guarantee shall be:

I (We) the undersigned, do warrant the roofing, including flashing and sheet metal work, on the (name of project) to be free from defects in materials and workmanship for a period of two (2) years from date of Substantial Completion. Said guarantee includes defects caused by normal wear and tear but excludes acts of violence, God or natural disasters unless failure of performance of roof during natural disasters is a result of poor workmanship.

2. Guarantee shall be executed by General Contractor and roofer.

1.12 EXISTING ROOF WARRANY

A. The existing school roof is presently a new Butler VSR-24 gauge roofing system. All roof repairs/additions shall maintain present roof warranty.

PART 2 - PRODUCTS

2.01 BRAND - NAMES OR EQUAL

A. Where brand names or equal are listed in this specification, they are listed for informational purposes establishing a general standard of quality and the Government is making no warranty of availability or fitness of the product use.

SECTION 07 40 00_4/8

2.02 UNDERWRITER LABORATORIES (UL) LISTINGS

A. The Contractor shall submit proof that items which he proposes to furnish under this specification conforms to the standard of a nationally recognized testing organization. The label of the nationally recognized testing organization shall be accepted as conforming to this requirement.

B. In lieu of the label, the Contractor may submit a written certification from any nationally recognized testing agency, adequately equipped and competent to perform such services, that the item has been tested and conforms to the standards including methods of test of the nationally recognized testing agency.

2.03 ROOF PANELS

A. Metal roof panels shall be rolled formed, 24 gauge, 0.5 oz./sq. ft. Galvalume steel sheet with a minimum yield of 50,000psi., Type MR 24 by Butler Manufacturing Co., or approved equal.

B. Roof panels shall be 24" wide a 3" high rib on each side. One side of the panel shall be female in configuration suitable to accept the other male side and form a self-locking assembly.

C. Roof panels shall be of a length such that end-laps are not required. Panel end-laps will not be allowed.

2.04 FASTENERS

A. Panels shall be secured to the structure by the use of concealed two-piece, sliding clip that will allow for expansion of the metal caused by changing temperature.

B. Roof system shall be anchored at the eave strut or eave purling. All other connections shall be designed to allow panel movement due to expansion/contraction of roof system.

C. All exposed fasteners shall be stainless steel with combination metal and neoprene washers. All exposed fasteners shall be re-painted to match the roof panel.

SECTION 07 40 00_5/8

2.05 FASCIA PANELS

A. Fascia panels shall be 24" wide standing rib 24 gauge panels.

2.06 FLASHING AND TRIM

A. All flashing, caps, crickets, trim, and other accessories shall be shop fabricated by the roof panel manufacturer from material that is the same gauge and finish as the roof panel to which they are attached.

B. Ridge flashing shall be accomplished with the use of metal zee closures and hat ridge flashing of expansion joint design. System shall be provided with necessary sealant and fasteners to assure weathertight design.

2.10 SEALANTS AND CLOSURES

A. Factory applied sealant used in panel side-laps shall be a hot melt, foamable mastic-Q41A.

B. Field applied sealant used at the ridge assembly and gable flashings shall be 100% solids, butyl-based elastomeric tape sealer, furnished in roll form or precut to length. Sealant used at eave shall be a pre-compressed expanding foam sealant taps.

C. Outside closures shall be manufactured from the same materials as the roof panels, inside closures shall be 18 gauge metal.

2.11 INSULATION

A. Provide not less than 2" thick, .0516 per cubic foot density fiberglass fiber batt insulation with UL flame-spread classification of 25 or less complete with vinyl foil laminate vapor retardant.

2.12 FINISH

A. Roof panels and all trim, flashing, caps, other metal accessories shall have a 0.8 mil polyvinylidene fluoride (PVF2) Kynar-500 70% resin finish coat applied over a 0.2 mil baked on epoxy base primer to a total film thickness of 1.0 mil. Color top is to be selected from manufacturer's standard colors.

Manufacturer shall submit a minimum of six standard colors top selection.

3.01 EXAMINATION

A. Examine alignment and placement of building roof structure before proceeding with installation of preformed metal roofing. Do not proceed with roofing panel installation until structural system, including bracing, is complete, fully aligned, and squared.

B. Examine metal roof deck before starting installation. Deck shall be clear, clean, and smooth, free of depressions, waves, and projections. Maintain deck dry and free of ice or snow, after roofing application commences. Deck flutes shall be clean and dry.

C. Structural supports, board insulation, vapor retarder and other substrate shall be in place. Tighten mechanical connections before proceeding with work.

SECTION 07 40 00_6/8

D. Verify correct placement of treated wood nailers specified in Section 06100 Rough Carpentry.

3.02 PREPARATION

A. Examine the alignment and placement of the building structure before proceeding with installation of preformed metal roofing.

B. Prior to beginning metal roofing work, a pre-roofing conference shall be held to review work to be accomplished.

1. Contractor, metal roofing subcontractor, metal roofing system manufacturer's representative and all other subcontractors who have equipment penetrating roof or whose work involves access to roof shall be present.

2. Contractor shall notify Contracting Officer and other attending parties at least three days prior to time for conference.

3. Contractor shall record minutes of meeting and shall distribute copies of minutes to all attending parties.

3.03 INSTALLATION

A. General Installation Requirements:

1. Install roofing and flashings in accordance with approved shop drawings and erection tolerances specified.

2. Isolate dissimilar metals and masonry or concrete from metals with bituminous coating.

Use gasketed fasteners where required to prevent corrosive action between fastener, substrate and panels.

3. Limit exposed fasteners to extent indicated on approved shop drawings.

4. Coordinate flashing and sheet metal work to provide weathertight conditions at roof terminators. Fabricate and install flashing and sheet metal work in accordance with standards of SMACNA Manual using continuous cleats at exposed edges.

5. Provide for temperature expansion and contraction movement panels at roof penetrations, and roof-mounted equipment.

6. Coordinate all roof penetrations with installation of roof that penetrations do not occur at seams.

B. Where metal will be in contact with wood or other absorbent material subject to wetting, seal joints with sealing compound and apply one coat of heavy bodied bituminous paint.

C. Install rigid insulation boards as specified in 07212 in accordance with approved shop drawings and manufacturer's instructions. Tightly butt end joins of boards.

D. Preformed Metal Panels shall be installed as follows:

1. Attach panel clips to installed substrate.

2. Fasten clips with fasteners as recommended by manufacturer at spacings required to resist specified wind uplift design pressures.

3. Verify with manufacturer locations of fixed connections and expansion connections.

Provide in accordance with approved manufacturer's shop drawings.

SECTION 07 40 00_7/8

4. Install metal roof panels in continuous lengths in accordance with approved shop drawings.

5. Provide seam caps with positive mechanism to prevent "walking" of cap in relation to panels.

6. Allow minimum 1/16 inch between pans. Press seams together tightly in each operation.

7. Erect metal roofing with lines, planes, rises, and angles shown and true, and plane surfaces free from objectionable wave, warp, dents, buckle, or other physical defects with minimum oil-canning.

8. Apply sealant at exterior perimeter closures with gun-applied sealant.

9. Install panels in accordance with approved manufacturer's instructions and shop drawings.

E. Flashing

1. Comply with SMACNA recommendations for installation of work.

2. Allow for thermal expansion of exposed sheet metal work exceeding 15-foot zero inches running length maximum.

3. For flashing and trim, space expansion joints maximum of 10 feet zero inch located 2 feet zero inch from corners and intersections.

4. Conceal fasteners and expansion provisions wherever possible.

5. Fold back edges if concealed side of exposed edge to form hem.

6. Insert metal flashings into reglets, anchor with fastener and wedges and seal joints

7. Set sheet metal items level, true and line, and plumb.

8. Secure to wood with screws or nails and washers.

9. Set metal already partly formed in place and fasten by means of continuous cleats.

10. Use cleats to keep laps closed when face width exceeds 8 inches for 22-gage steel.

3.04 INTERFACE WITH OTHER PRODUCTS

A. Coordinate flashing with gutter system and fabricate watertight installation at gutters.

B. Coordinate with installation of board insulation specified in Section 07212.

C. Coordinate with Section 06100 - Rough Carpentry.

D. Coordinate soffit panel installation with soffit specified in Section 07450 - Preformed Soffit Panels.

3.05 FIELD QUALITY CONTROL

A. Applicable Erection Tolerances: Maximum variation from true plane or lines shall be ¼” inch (6.25

mm) in 20 feet zero inches (6,000 mm), 3/8 inch (9.38 mm) in 40 feet zero inches (12,000 mm) or

SECTION 07 40 00_8/8

more.

B. Roofing Manufacturer's Inspection: Have representative from roofing manufacture inspect finished installation and certify that it meet requirements of the contract documents and requirements of warranty. If intermediate inspections are required by the manufacturer to provide certification, provide them as a part of the work.

3.06 PROTECTION AND CLEANING

A. Protect work from other trades.

B. Touch up areas as required or directed with manufacturer's touch-up paint. Apply in strict accordance with manufacturer's instructions.

C. Remove or repair any damaged panel as required by the Contracting Officer at no cost.

D. Remove all debris and rubbish from site upon completion of work.

SECTION 07 92 00_1/6

SECTION 07 92 00

JOINT SEALANTS

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C1311 (2010) Standard Specification for Solvent Release Agents

ASTM C509 (2006; R 2011) Elastomeric Cellular Preformed Gasket and Sealing Material

ASTM C734 (2006; R 2012) Low-Temperature Flexibility of Latex Sealant After Artificial Weathering

ASTM C834 (2010) Latex Sealants

ASTM C919 (2012) Use of Sealants in Acoustical Applications

ASTM C920 (2011) Standard Specification for Elastomeric Joint Sealants

ASTM D1056 (2007) Standard Specification for Flexible Cellular Materials - Sponge or Expanded Rubber

ASTM D1667 (2005; R 2011) Flexible Cellular Materials - Poly (Vinyl Chloride) Foam (Closed-Cell)

ASTM D217 (2010) Cone Penetration of Lubricating Grease

ASTM D2452 (2003; R 2009) Standard Test Method for Extrudability of Oil- and Resin-Base Caulking Compounds

ASTM D2453 (2003; R 2009) Standard Test Method for Shrinkage and Tenacity of Oil- and Resin-Base Caulking Compounds

ASTM E84 (2012c) Standard Test Method for Surface Burning Characteristics of Building Materials

1.2 SUBMITTALS

Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

A. SD-03 Product Data

1. Sealants

2. Primers

3. Bond breakers

4. Backstops

Manufacturer's descriptive data including storage requirements, shelf life, curing time, instructions for mixing and application, and primer data (if required). Provide a copy of the Material Safety Data Sheet for each solvent, primer or sealant material.

SECTION 07 92 00_2/6

B. SD-07 Certificates

1. Sealant

2. Certificates of compliance stating that the materials conform to the specified requirements.

1.3 ENVIRONMENTAL CONDITIONS

Apply sealant when the ambient temperature is between 4 and 32 degrees C 40 and 90 degrees F.

1.4 DELIVERY AND STORAGE

Deliver materials to the job site in unopened manufacturers' external shipping containers, with brand names, date of manufacture, [color,] and material designation clearly marked thereon.

Label elastomeric sealant containers to identify type, class, grade, and use. Carefully handle and store materials to prevent inclusion of foreign materials or subjection to sustained temperatures exceeding 32 degrees C 90 degrees F or less than 4 degrees C 0 degrees F.

1.5 QUALITY ASSURANCE

1.4.1 Compatibility with Substrate

Verify that each of the sealants are compatible for use with joint substrates.

1.4.2 Joint Tolerance

Provide joint tolerances in accordance with manufacturer's printed instructions.

1.6 SPECIAL WARRANTY

Guarantee sealant joint against failure of sealant and against water penetration through each sealed joint for five (5) years.

PART 2 PRODUCTS

2.1 SEALANTS

Provide sealant that has been tested and found suitable for the substrates to which it will be applied.

2.1.1 Interior Sealant

Provide ASTM C834 [ASTM C920, Type S or M, Grade NS, Class 12.5, Use NT. Location(s) and color(s) of sealant for the following:

1. Location: Small voids between walls and door frames, built-in or surface-mounted equipment and fixtures, and similar items.

2. Color: As selected by Designer of Record

2.1.2 Floor Joint Sealant

Provide ASTM C920, Type S or M, Grade P, Class 25, Use T. Provide location(s) and color(s) of sealant as follows:

1. Location: Seats of metal thresholds for exterior doors.

2. Color: As selected by Designer of Record

SECTION 07 92 00_3/6

2.2 PRIMERS

Provide a non-staining, quick-drying type and consistency recommended by the sealant manufacturer for the particular application.

2.3 BOND BREAKERS

Provide the type and consistency recommended by the sealant manufacturer to prevent adhesion of the sealant to backing or to bottom of the joint.

2.4 BACKSTOPS

Provide glass fiber roving or neoprene, butyl, polyurethane, or polyethylene foams free from oil or other staining elements as recommended by sealant manufacturer. Provide 25 to 33 percent oversized backing for closed cell and 40 to 50 percent oversized backing for open cell material, unless otherwise indicated. Make backstop material compatible with sealant. Do not use oakum and other types of absorptive materials as backstops.

2.5 CLEANING SOLVENTS

Provide type(s) recommended by the sealant manufacturer (except for aluminum and bronze surfaces that will be in contact with sealant).

PART 3 EXECUTION

3.1 SURFACE PREPARATION

Clean surfaces from dirt frost, moisture, grease, oil, wax, lacquer, paint, or other foreign matter that would tend to destroy or impair adhesion.

Remove oil and grease with solvent. Surfaces must be wiped dry with clean cloths. When resealing an existing joint, remove existing caulk or sealant prior to applying new sealant. For surface types not listed below, contact sealant manufacturer for specific recommendations.

3.1.1 Steel Surfaces

Remove loose mill scale by sandblasting or, if sandblasting is impractical or would damage finish work, scraping and wire brushing. Remove protective coatings by sandblasting or using a residue-free solvent.

3.1.2 Aluminum or Bronze Surfaces

Remove temporary protective coatings from surfaces that will be in contact with sealant. When masking tape is used as a protective coating, remove tape and any residual adhesive just prior to sealant application. For removing protective coatings and final cleaning, use non-staining solvents recommended by the manufacturer of the item(s) containing aluminum or bronze surfaces.

3.1.3 Concrete and Masonry Surfaces

Where surfaces have been treated with curing compounds, oil, or other such materials, remove materials by sandblasting or wire brushing. Remove laitance, efflorescence and loose mortar from the joint cavity.

SECTION 07 92 00_4/6

3.1.4 Wood Surfaces

Keep wood surfaces to be in contact with sealants free of splinters and sawdust or other loose particles.

3.2 SEALANT PREPARATION

Do not add liquids, solvents, or powders to the sealant. Mix Multi-component elastomeric sealants in accordance with manufacturer's instructions.

3.3 APPLICATION

A. Acceptable Ratios:

JOINT WIDTH JOINT DEPTH

Minimum Maximum

For metal, glass, or other nonporous surfaces:

6 mm (minimum) 6 mm 6 mm over 6 mm 1/2 of width Equal to width

For wood, concrete, or masonry.

6 mm (minimum) 6 mm 6 mm over 6 mm to 13 mm 6 mm Equal to width over 13 mm to 50 mm 50 mm 16 mm

Over 50 mm As recommended by sealant manufacturer

For metal, glass, or other nonporous surfaces:

1/4 inch (minimum) 1/4 inch 1/4 inch

For wood, concrete, or masonry.

1/4 inch (minimum) 1/4 inch 1/4 inch over 1/4 inch to 1/2 inch 1/4 inch Equal to width over 1/2 inch to 2 inch 1/2 inch 5/8 inch

Over 2 inch As recommended by sealant manufacturer over 1/4 inch 1/2 of width Equal to width

SECTION 07 92 00_5/6

B. Unacceptable Ratios: Where joints of acceptable width-to-depth ratios have not been provided, clean out joints to acceptable depths and grind or cut to acceptable widths without damage to the adjoining work. Grinding is not required on metal surfaces.

3.3.2 Masking Tape

Place masking tape on the finish surface on one or both sides of a joint cavity to protect adjacent finish surfaces from primer or sealant smears. Remove masking tape within 10 minutes after joint has been filled and tooled.

3.3.3 Backstops

Install backstops dry and free of tears or holes. Tightly pack the back or bottom of joint cavities with backstop material to provide a joint of the depth specified. Install backstops in the following locations:

1. Where backstop is not indicated but joint cavities exceed the acceptable maximum depths specified in paragraph entitled, "Joint Width-to-Depth Ratios".

3.3.4 Primer

Immediately prior to application of the sealant, clean out loose particles from joints. Where recommended by sealant manufacturer, apply primer to joints in concrete masonry units, wood, and other porous surfaces in accordance with sealant manufacturer's instructions. Do not apply primer to exposed finish surfaces.

3.3.5 Bond Breaker

Provide bond breakers to the back or bottom of joint cavities, as recommended by the sealant manufacturer for each type of joint and sealant used, to prevent sealant from adhering to these surfaces. Carefully apply the bond breaker to avoid contamination of adjoining surfaces or breaking bond with surfaces other than those covered by the bond breaker.

3.3.6 Sealants

Provide a sealant compatible with the material(s) to which it is applied. Do not use a sealant that has exceeded shelf life or has jelled and cannot be discharged in a continuous flow from the gun.

Apply the sealant in accordance with the manufacturer's printed instructions with a gun having a nozzle that fits the joint width. Force sealant into joints to fill the joints solidly without air pockets.

Tool sealant after application to ensure adhesion. Make sealant uniformly smooth and free of wrinkles. Upon completion of sealant application, roughen partially filled or unfilled joints, apply sealant, and tool smooth as specified. Apply sealer over the sealant when and as specified by the sealant manufacturer.

3.4 PROTECTION AND CLEANING

3.4.1 Protection

Protect areas adjacent to…