About this file

Amendment 3 - Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Replace Fire System B1002, newest first.
File Type Posted
Amend_2.pdf PDF
Amend_1.pdf PDF
Site_Visit_Sign_In_Sheet.pdf PDF
Attachment_7_-__Notice_of_Compliance.pdf PDF
Attachment_2_-_Stennis_Fire_Alarm_Phasing.pdf PDF
Attachment_3_-_Drawings.pdf PDF
Attachment_6_-_Reference_List.pdf PDF
Attachment_8_-_SF_1444.pdf PDF
Attachment_5_-_PPQ.pdf PDF
Attachment_4_-_Wage_Det_MS180141.pdf PDF
FA301018R0012.pdf PDF
Attachment_1_-_SOW.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F2J31D7333AW01

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate answ ers to questions submitted in response to the site vist.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA301018R0012

X 9B. DATED (SEE ITEM 11)

29-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Mar-2018

CODE

81ST CONTRACTING SQUADRON

TSGT MARCOS A. MORALES

310 M ST

KEESLER AFB MS 39534

FA3010 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA301018R0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS

1. Are there fire alarm devices under the raised flooring? If yes, what type and quantity?

A. Yes there are devices under flooring rooms 111A & 111B. Per SOW (section 3.2.4) old Halon System devices, wires and conduit can be abandoned in place if not accessible.

2. In the statement of work is calling for the cabling, metallic conductor and device to be removed from under the floor. The halon demo drawings are only showing the ceiling mounted devices to be demo. Are the under floor devices and conduit and conductors required to be removed? If yes what are the number of halon devices under the floor in each area? What is the approximant length of conduit under the floor in each area?

A. Yes there are devices under flooring rooms 111A & 111B. Per SOW (section 3.2.4) old Halon System devices, wires and conduit can be abandoned in place if not accessible.

3. On page FX-002, note #10 says: “Where suspended ceiling grid is damaged, repair/replace as required at no additional cost to owner”. Is a part of the ceiling already damaged or the replacement shall be made in case it gets damaged during the removal by the contractor? If already damaged, could you provide an estimate of the area to be replaced?

A. If damaged by contractor in the progress of project replace damaged ceiling grid or tile. Identify any ceiling grid or tiles that are damaged before any work begins.

4. Can proposal be emailed or does hard copies need to be sent?

A. Yes, proposals can be emailed.

5. Drawing FX-002 Note 2 conflicts with the specifications Attachment 1, 3.2.4. The drawings call for stainless steel and specify no thickness, the specifications call for 12 GA aluminum. Please clarify.

A. Per drawings FX-002 all opening require stainless steel plates, screws and completely cover opening. Provide 16 GA Stainless Steel.

6. Attachment 1, 3.2.4; please define perimeter walls.

A. Any wall forming the boundary of the secure area on the north side of the facility. Penetrations through this wall must be kept to a minimum and completely sealed afterwards. Any items removed from this wall must have the remaining opening patch and finished with a level 4 finish painted to match.

7. Can the existing sprinkler piping be reused?

A. Yes, the existing dry pipe system piping can be reused unless it is discovered to be damaged. If damaged pipe is discovered, notify the Contracting Officer. Modifications should be made to the risers as shown. Contractor to pressure test and identify any potential leaks before filling with water.

FA301018R0012

8. For design and planning purposes, will the Government make access available to all areas at one time for up front planning and design or will planning and design need to coincide with the phasing plan?

A. Per drawing FX-002; Note 14: Escorts are required in all spaces; therefore access to areas are limited. Weekly updates required to properly coordinate work in these spaces. [This is due to security requirements]

9. There are red strobe units located outside the spaces that were originally protected with Halon that appear to be part of the Halon system. Are these to remain? If they are to be removed, will the entire wall need repainting or just the colored area that the strobes are located in from corner to corner?

A. Per drawing FX-002 Note 1: Remove all portions of the Halon System to include all devices signs, wiring, accessible conduit and boxes and restore finishes. Surface devices to be removed are shown.

(End of Summary of Changes)