Attachment_1_-_Specifications.pdf
PDF 2 MB Posted
- Attached to
- Renovate Building Interior AMX Federal contract opportunity
- Solicitation number
- FA301017R0021-Watanga
About this file
Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised_Wage_Det.pdf | ||
| 0002.pdf | ||
| Amendment.pdf | ||
| SOW_RevA,_3_Aug_17.pdf | ||
| Updated_Page_6_-__Drawing.pdf | ||
| Attachment_4_-_Wage_Determination.pdf | ||
| Attachment_2_-_Drawings.pdf | ||
| Attachment_8_-_PPQ.doc | DOC document | |
| 17-R-0021_Solicitation.pdf | ||
| Attachment_3_-_SOW.pdf | ||
| Attachment_5_-_SF_1444.pdf | ||
| Attachment_6_-_Notice_of_Compliance.pdf | ||
| Attachment_7_-_Reference_List.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT:
REPAIR/RENOVATE ROOMS AMX WX AMV STAND-UP
BLDG. 4221
PROJECT NUMBER: MAHG16-9004
17 MARCH 2017
KEESLER AIR FORCE BASE BILOXI, MISSISSIPPI
Keesler AFB 508 L Street Keesler AFB, MS 39534
Attachment 1
FA301017R0021
INDEX
SECTION NAME
00 10 20 DRAWING LIST
01 30 00 SUBMITTALS
02 61 30 ASPHALT PAVING
03 12 00 EARTHWORK
03 30 00 CAST IN PLACE CONCRETE
05 40 00 LIGHT GAUGE METAL FRAMING
07 20 00 INSULATION
07 92 00 JOINT SEALANTS
08 11 13 STEEL FRAMES
08 11 16 INTERIOR ALUMINUM DOORS, FRAMES AND PARTITIONS
08 20 00 WOOD DOORS
08 58 00 ALUMINUM SLIDING SERVICE WINDOW
08 71 00 DOOR HARDWARE
09 25 50 GYPSUM BOARD ASSEMBLIES
09 30 00 TILE AND ACCESSORIES
09 51 10 ACCOUSTICAL PANEL CEILINGS
09 65 13 RUBBER WALL BASE
09 65 50 RESILIENT ACCESSORIES
09 68 13 TILE CARPETING
09 91 00 PAINT
09 93 23 STAINS AND TRANSPARENT FINISHES
16 00 00 GENERAL PROVISIONS – ELECTRICAL
16 11 00 RACEWAYS
16 50 00 LIGHTING
32 31 00 HIGH SECURITY STEEL ROLL GATES
32 31 01 DECORATIVE FENCE PRODUCTS
SECTION 00 10 20
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
This document lists the drawings for the project.
1.2 CONTRACTDRAWINGS
Contract drawings are as follows:
DRAWING No. TITLE
T1.0 TITLE SHEET
C1.0 SITE PLAN – FENCING/UTILITIES
D1.0 DEMOLITION PLAN
A1.0 FLOOR PLANS
A2.0 WALL SECTIONS, DOOR AND FRAME ELEVATIONS, AND SCHEDULE
A3.0 INTERIOR ELEVATIONS
A4.0 REFLECTED CEILING PLAN
E1.0 EXISTING LIGHTING PLAN
E1.1 LIGHTING PLAN
E2.0 ELECTRICAL POWER PLANS
END OF SECTION
SECTION 01 30 00
SUBMITTALS
1.01 GENERAL
A. Related Requirements Specified Elsewhere
1. General Conditions-Statement of Work
B. Send all submittals to:
81 Contracting Building 4605 Keesler AFB, MS 39534
1.02 CONSTRUCTION SCHEDULE
A. Provide projected construction schedules for entire work, revise periodically.
B. Prepare in form of horizontal bar chart.
1. Provide separate horizontal bar column for each trade or operation.
2. Order: Chronological order or beginning of each item of work.
3. Identify each column:
a. By major specification section number.
b. By distinct graphic delineation.
4. Horizontal time scale: Identify first workday of each week.
5. Scale and spacing: To allow space for updating.
C. Provide complete sequence of construction by activity.
1. Shop Drawings, Product Data and Samples:
a. Submittal dates.
b. Dates reviewed copies will be required.
2. Product procurement and delivery dates.
3. Dates for beginning and completion of each element of construction, specifically:
Ordering/Delivery of Materials Preparation of Installation site Installation of Carpeting and accessories
D. Show projected percentage of completion for each item of work as of first day of each month.
1.03 SUB-CONTRACTORS AND SUPPLIERS
A. Submit to the Contracting Officer within 10 days of award of contract a list of all sub contractors to be used on the work.
B. Submit to the Contracting Officer within 10 days of award of contractor a list of all suppliers and material men furnishing products to be incorporated in the work not a part of a sub-contract.
C. Lists shall include company name, address, phone number and contact person if applicable.
1.04 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
A. Submit to the Designer samples and product data on the following:
1. Light Gauge Metal Framing
2. Sound Attenuation Batt Fiberglass
3. Wood Doors
4. Steel Frames
5. Aluminum Entrances and Storefronts
6. Door and Frame Hardware
7. Gypsum Board Assemblies
8. Acoustical Panel Ceiling tiles and metal grid
9. Paint to include color samples
10. Primer
11. Stains and Transparent Finishes
12. All adhesives and removers, to include MSDS for all.
13. Any and all contingent components deemed necessary by the Contracting Officer.
B. Each submittal shall be forwarded to:
81 Contracting Building 4605 Keesler AFB, MS 39534 with a separate transmittal letter identifying specification section and number pertinent to submittal. Transmittal letter shall delineate all variations of product submitted from that specified.
C. Designate on the Construction Schedule dates for submission and dates reviewed shop drawings, product data and samples will be needed for each product.
D. Product Data
1. Manufacturer's standard schematic drawings:
a. Modify drawings to delete information not applicable to project.
b. Supplement standard information to provide additional information applicable to project.
2. Manufacturer's catalog sheets, brochures, diagrams, schedules, performance charts, illustrations and other standard descriptive data.
a. Clearly mark each copy to identify pertinent materials, products or models.
b. Show dimensions and clearances required.
c. Show performance characteristics and capacities.
d. Show wiring diagrams and controls.
E. Contractor Responsibilities
1. Review shop drawings, product data and samples prior to submission.
2. Verify:
a. Field measurements.
b. Field construction criteria.
c. Catalog numbers and similar data.
3. Coordinate each submittal with requirements of work and of Contract Documents.
4. Contractor's responsibility for errors and omissions in submittals is not relieved by
Contracting Officer's review of submittals.
5. Contractor's responsibility for deviations in submittals from requirements of Contract
Documents is not relieved by Contracting Officer's review of submittals, unless Contracting Officer gives written acceptance of specific deviations.
6. Notify Contracting Officer in writing at time of submission of deviations in submittals from requirements of Contract Documents.
7. Begin no work which requires submittals until return of submittals with Contracting Officer's stamp and initials or signature indicating review.
8. After Contracting Officer's review, distribute copies.
F. Submission Requirements
1. Schedule submissions at least ten days before dates reviewed submittals will be needed.
2. Submit number of shop drawings and product data and samples which Contractor requires for distribution plus two copies which will be retained by Contracting Officer on all items.
3. Accompany submittals with transmittal letter, in duplicate, containing:
a. Date
b. Project title and number
c. Contractor's name and address
d. Identification of product or material
e. Relation to adjacent structure or materials
f. Field dimensions, clearly identified as such
g. Specification section number. Applicable standards, such as ASTM number or
Federal Specification.
I. Contractor's stamp initialed or signed certifying to review of submittal, verification of field measurements and compliance with Contract Documents.
G. Resubmission Requirements
1. Shop Drawings:
a. Revise initial drawings as required and resubmit as specified for initial submittal.
b. Indicate on drawings any changes, which have been made other than those requested by Contracting Officer.
2. Product Data and Samples: Submit new data and samples as required for initial submittal.
END OF SECTION
SECTION 02 61 30
POLYMER MODIFIED SLURRY SURFACE SEAL
PART I - GENERAL
1.01 DESCRIPTION
A. The work required under this Section consists of Slurry Surface Seal as indicated on the Drawings with Polymer Modified Slurry Surface Seal. The work shall, as a minimum, include the following specific tasks:
1. Removal of deteriorated asphalt surfacing.
2. Repair of damaged asphalt surfacing.
3. Polymer Modified Slurry Surface Seal materials including placement.
4. Surface Stripping.
B. Related Requirements Specified Elsewhere
1. Section 01 30 00 - Submittals
1.02 SUBMITTALS
A. Submit in accordance with Section 01 30 00 - Submittals.
B. Submit mix design for the following:
1. Asphalt base and surface course.
2. Polymer Modified Slurry Surface Seal.
PART 2 - MATERIALS
2.01 BITUMINOUS MIXTURES
A. The bituminous mix shall be composed of a mixture of aggregate, mineral filler and other material, as required, mixed in a central mixing plant with asphalt cement in the proportions specified.
B. Mineral aggregates for the mixture shall be so sized and graded and shall be combined in such proportions that the resultant composite blend will meet the gradation requirements as specified in Table B, subsection 703.091, Mississippi standard Specifications for Road and Bridge Construction, 1976 Edition, For Surface Course and Bituminous Base Course 1976.
C. Coarse aggregate type for the mixture shall be crushed gravel, Class II and shall conform to the requirements for mixture Type III for surface mixtures as specified in Table A, subsection 703.091, of the aforementioned reference.
D. The bituminous material used in the mixture shall be Petroleum Asphalt Cement, Grade AC-8, conforming to requirements of Table I, subsection 702.08, of the aforementioned reference. In addition, the mixture shall be homogeneous, free of water and shall not foam when heated to a temperature of 347 degrees F. The percentage of asphalt cement, by weight of total mix, to be used in the mixture shall be as specified in Table B, subsection 703.091 of the aforementioned reference.
E. Mineral filler may be used in the mixture to obtain the desired properties; however, its excessive use will not be permitted. For surface course mixture SC-1, a minimum of one (1) percent mineral filler, by weight of the total mineral aggregate before addition of asphalt cement, shall be required. Mineral filler shall meet the requirements of subsection 703.15, Mississippi Standard Specifications, mentioned above.
2.02 PRIME COAT
A. Prime coat shall be Medium Curing Cutback Asphalt, MC-I, conforming to requirements of Table III, Section 702, of aforementioned reference.
2.03 BLOTTER MATERIAL
A. Aggregate for blotter material shall conform to gradation requirements as follows:
Percent passing 3/8 inch 100 Percent passing No. 4 screen 85-100 Percent passing No. 100 screen 10-30
The aggregate shall be free from vegetable or other deleterious matter.
2.04 TACK COAT
A. Tack coat shall be Emulsified Asphalt, Grade EA-4, meeting the requirements of Table V, Section 702, Mississippi Standard Specifications, hereinbefore specified.
2.05 EQUIPMENT
A. The central bituminous mixing plant shall conform generally to the requirements of subsection 401-08, Mississippi Standard Specifications for Road and Bridge Construction, 1967 Edition.
2.06 POLYMER MODIFIED SLURRY SEAL
A. Polymer Modified Emulsified Asphalt shall meet the requirements of Section 405.02.3 of the Mississippi Standard Specifications for Road or Bridge Construction.
B. Slurry Seal aggregate shall meet the requirements of Section 405.02.4 of the Standard Mississippi
Specifications for Road and Bridge Construction.
C. Water, Portland Cement, and Mineral Filler shall meet the requirements of Section 405.02.06 thru
405.02.8 of the Mississippi Standard Specifications for Road and Bridge Construction.
D. Slurry Seal Composition shall meet Section 405.02.9.2 Type 4 of the Mississippi Standard
Specifications for Road and Bridge Construction.
PART 3 - EXECUTION
3.01 REPAIR OF EXISTING PAVEMENT
A. Surface preparation: Prior to any construction, remove from the existing bituminous pavement surface all loose material, dirt, clay, and other objectionable substances. Clean all surface cracks and crevices in the existing asphalt surface. Cleaning shall be by power broom, blower, compressed air, stiff-bristled hand brooms, and other approved methods.
B. Pavement repair procedures: After cleaning operation is complete, identify all potholes, depressions, ruts, raveling, cracks, corrugations, shaved areas, etc., requiring remedial work prior to overlay application. The following procedures will be used in the repair of these defects:
1. Potholes, deep depressions, large cracks, shoved areas, upheavals, etc.:
a. Remove surface and base material as deep as necessary to reach firm support, extending at least a foot into good pavement outside cracked areas. Make the cut square or rectangular with spaces straight and vertical.
b. Apply a tack coat as hereinbefore specified to the vertical faces at the cut-out.
c. Backfill the hole with a dense graded hot bituminous mixture as hereinbefore specified. Spread carefully to prevent segregation of the mixture.
d. Compact in layers in the hole is more than 6 inches deep. Compact each layer thoroughly with equipment most suited for the size of the job. A vibratory plate compactor is excellent for small patches. A roller will be more practical for large area.
e. The finished surface shall be smooth and true to grade of existing section.
2. Ruts, shallow depressions, raveling, etc.:
a. Apply a fog seal tack coat of asphalt emulsion, EA-4, diluted equally with water, to entire area of patch at rate of 0.12-0.15 gallon per square yard.
b. Spread dense graded hot bituminous mixture as hereinbefore specified to the patch area. Be sure the material is feathered at the edges.
c. Compact thoroughly with a pneumatic-tired roller.
d. The finish surface shall be smooth and true to grade of existing section.
3. Cracks and Crevices:
a. After thorough cleaning as hereinbefore specified, apply fog seal of asphalt
Emulsion, EA-4, diluted equally with water, to entire surface of area to be patched at rate of 0.12-0.13 gallons per square yard. Emulsion shall be applied to large areas with a pressure distributor.
b. Allow time for the asphalt to break and then apply a light sand seal to the surface.
Sand shall be dry and completely free of extraneous material.
c. Roll the surface with a light pneumatic roller to form a complete seal.
d. Broom excess sand from the water.
3.02 POLYMER MODIFIED SLURRY SEAL APPLICATION
A. Apply Polymer Modified Slurry Seal in accordance with the requirements of Section 405.03.3 of the Mississippi Standard Specification for Road and Bridge Construction.
3.03 WORKMANSHIP
A. Specified hot bituminous pavement courses shall be constructed as nearly in accordance with the thicknesses specified and as the conditions of the underlying foundation will permit. Contractor shall be responsible for adhering to the alignment, thicknesses, grades, and sections as shown on the Drawings for obtaining the required in-place material density and adhering to the specified surface tolerances.
3.04 CLEAN-UP
A. At the conclusion of the project, the Contractor shall provide complete, total, and full clean-up service of the entire project site.
3.05 GUARANTEE
A. Guarantee materials and workmanship for this work for a period of one (1) year from date of acceptance.
END OF SECTION
SECTION 03 12 00
EARTHWORK
PART 1 - GENERAL 1.1 DESCRIPTION:
This section specifies the requirements for furnishing all equipment, materials, labor and techniques for earthwork including excavation, fill and backfill and site restoration utilizing fertilizer, seed and/or sod.
1.2 DEFINITIONS:
A. Unsuitable Materials:
1. Fills: Topsoil, frozen materials; construction materials and materials subject to decomposition; clods of clay and stones larger than 75 mm (3 inches); organic materials, including silts, which are unstable; and inorganic materials, including silts, too wet to be stable.
2. Existing Subgrade (footings only): Same as Paragraph 1, but no fill or backfill. If materials differ from reference borings and design requirements, excavate to acceptable strata subject to a Governmental Representative and/or Contracting Officer approval.
B. Earthwork: Earthwork operations required within the new construction area. It also includes earthwork required for auxiliary structures and buildings and sewer and other trench work throughout the job site.
C. Degree of Compaction: Degree of compaction is expressed as a percentage of maximum density obtained by the test procedure presented in ASTM D1557 Method A.
D. The term fill means fill or backfill as appropriate.
1.3 RELATED WORK:
A. Materials testing and inspection during construction: Section 01450, TESTING LABORATORY SERVICES.
B. Safety Requirements: Section 01000, GENERAL REQUIREMENTS.
C. Protection of existing utilities, fire protection services, existing equipment, roads, and pavements: Section 01
00 00, GENERAL REQUIREMENTS
D. Subsurface Investigation: Section 01000, GENERAL REQUIREMENTS
PART 2 - EXECUTION
2.1 SITE PREPARATION:
A. Clearing: Clearing within the limits of earthwork operations as described or designated by the Contracting Officer. Work includes removal of trees, shrubs, fences, foundations, incidental structures, paving, debris, trash and any other obstructions.
B. Grubbing: Remove stumps and roots 75 mm (3 inches) and larger diameter. Undisturbed sound stumps, roots up to 75 mm (3 inches) diameter, and nonperishable solid objects which will be a minimum of 900 mm (3 feet) below subgrade or finished embankment may be left.
C. Trees and Shrubs: Trees and shrubs, not shown for removal, may be removed from the areas within 4500 mm (15 feet) of new construction and 2250 mm (7’-6”) of utility lines if such removal is approved in advance by the Contracting Officer. Box, and otherwise protect from damage, existing trees and shrubs which are not shown to be removed in the construction area. Repair immediately damage to existing trees and shrubs by trimming, cleaning and painting damaged areas, including the roots, in accordance with standard industry horticultural practice for the geographic area and plant species. Building materials shall not be stored closer to trees and shrubs that are to remain, than the farthest extension of their limbs.
D. Stripping Topsoil: Unless otherwise indicated on the drawings, the limits of earthwork operations shall extend anywhere the existing grade is filled or cut or where construction operations have compacted or otherwise disturbed the existing grade or turf. Strip topsoil as defined herein, or as indicated in the geotechnical report, from within the limits of earthwork operations as specified above unless specifically indicated or specified elsewhere in the specifications or shown on the drawings. Topsoil, whether on site or imported, shall be fertile, friable, natural topsoil of loamy character and characteristic of the locality and shall meet the applicable requirements of MDOT. Topsoil shall be capable of growing healthy horticultural crops of grasses. Stockpile topsoil and protect as directed by the Contracting Agent. Eliminate foreign material, such as weeds, roots, stones, subsoil, frozen clods, and similar foreign materials, larger than
0.014 m3 (1/2 cubic foot) in volume, from soil as it is stockpiled. Retain topsoil on the station. Remove foreign materials larger than 50 mm (2 inches) in any dimension from topsoil used in final grading. Topsoil work, such as stripping, stockpiling, and similar topsoil work, shall not, under any circumstances, be carried out when the soil is wet so that the tilth of the soil will be destroyed.
1. Concrete Slabs and Paving: Score deeply or saw cut to insure a neat, straight cut, sections of existing concrete slabs and paving to be removed where excavation or trenching occurs. Extend pavement section to be removed a minimum of 300 mm (12 inches) on each side of widest part of trench excavation and insure final score lines are approximately parallel unless otherwise indicated.
E. Disposal: All materials removed from the property shall be disposed of at a legally approved site, for the specific materials, and all removals shall be in accordance with all applicable Federal, State and local regulations. No burning of materials is permitted onsite.
3.7 CLEAN-UP:
Upon completion of earthwork operations, clean areas within contract limits, remove tools, and equipment.
Provide site clear, clean, free of debris, and suitable for subsequent construction operations. Remove debris, rubbish, and excess material from the work site and dispose of it as directed above.
END OF SECTION
SECTION 03 30 00
CAST IN PLACE CONCRETE
1.1 GENERAL
1.2 Related Documents
A. Drawings and general provisions of the contract, including General and Supplementary conditions shall apply to this Section.
1.3 Summary
A. This section specifies cast-in place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes for the following:
1. Footings
2. Slab on Grade
1.4 Definitions
A. Cementitious Materials: Portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash and other pozzolans, ground granulated blast-furnace slag, and silica fume; subject to compliance with requirements.
1.5 Submittals
A. Design Mixtures: For each concrete mixture. Submit design mixtures.
1. Indicate amounts of mixing water to be withheld for later addition at Project site.
B. Material Test Reports: For the following from a qualified testing agency, indicating compliance with requirements:
1. Aggregates: Include service record data indicating absence of delirious expansion of concrete due to alkali aggregate reactivity.
1.6 Quality Assurance
A. ACI Publications: Comply with the following unless modified by requirements in the contact
Documents:
1. ACI 301, “Specification for Structural Concrete”, Sections 1 through 5.
2. ACI 117, “Specifications for Tolerances for Concrete Construction and Materials”.
B. Concrete Testing Service: Engage a qualified independent testing agency to perform material evaluation test and to design concrete mixtures.
2.1 Products
A. Steel Reinforcement
1. Reinforcement bars: ASTM A 615M, Grade 60 (Grade 420), deformed.
2.2 Concrete Materials
A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source, throughout the Project:
1. Portland Cement: SATM C 150, Type I/II.
a. Fly Ash: ASTM C 618, Class C or F.
b. Ground Granulated Blast-Furnace Slag: ASTM C 989, Grade 100 or 120.
B. Normal-Weight Aggregates: ASTM C 33, Class 3S course aggregate or better, graded. Provide aggregates from a single source with documented service record data of at least 10 years satisfactory service in similar applications and service conditions using similar aggregates and cementitious materials.
2. Maximum course-aggregate size: ¾ inch (19mm) nominal.
3. Fine aggregate: Free of materials with deleterious reactivity to alkali in cement.
2.3 Admixtures
A. Air-Entraining Admixture: ASTM C 260.
B. Chemical Admixtures: Provide admixtures certified by manufacturer to be compatible with other admixtures that will not contribute water-soluble chloride or admixtures containing calcium chloride.
1. Water-reducing admixture: ASTM C 494/C 494M, Type A.
2. Retarding Admixture: ASM C494/C 494M, Type B.
3. Water-Reducing and retarding admixture: ASTM C 494/C 494M, Type D.
4. High-Range, Water-Reducing Admixture: ASTM C 494/C 494M, Type F.
2.4 Concrete Mixtures for Building Elements
A. Footings: Proportion normal-weight concrete mixture as follows:
1. Minimum Compressive Strength: 4000 psi(27.6 MPa) at 28 days.
2. Maximum Water-Cementitious Materials Ratio: 0.40.
3. Slump Limit: 8 inches (200 mm) for concrete with verified slump of 2 to 4 inches (50 to
100MM) before adding high-range water-reducing admixture or plasticizing admixture, plus or minus 1 inch (25mm).
4. Air Content: 4 percent, plus or minus 1.5 percent at point of delivery for ¾ inch (19mm) nominal maximum aggregate size.
3.1 Concrete Placement
A. Before placing concrete, verify that installation of formwork, reinforcement, and embedded items is complete and that required inspections have been performed.
B. Do not add water to concrete during delivery, a Project site, or during placement unless approved by the Contracting Agent’s Representative.
C. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete will be placed on concrete that has hardened enough to cause seams of planes of weakness. If a section cannot be placed continuously, provide construction joints as indicated. Deposit concrete to avoid segregation.
D. Cold-Weather Placement: Comply with ACI 306.1 and as follows. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.
1. When the average high and low temperatures is expected to fall below 40 degrees F (4.4 degrees C) for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI 301.
2. Do not use frozen materials or materials containing ice or snow. Do not place concrete on frozen subgrade or on subgrade containing frozen materials.
3. Do not use calcium chloride, salt, or other materials containing antifreeze agents of chemical accelerators unless otherwise specified and approved in mixture designs.
E. Hot-Weather Placement: Comply with ACI 301 and as follows:
1. Maintain concrete temperature below 90 degrees F (32 degrees C) at time of placement.
Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water. Using liquid nitrogen to cool concrete is the Contractor’s option.
2. Fog-Spray forms, steel reinforcement and subgrade just before placing concrete. Keep subgrade uniformly moist without standing water, soft spots, or dry areas.
3.2 Concrete protection and curing
A. General Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with ACI 306.1 for cold-weather protection and ACI 301 fir hot-weather protection during curing.
3.3 Concrete Surface repairs
A. Defective Concrete: Repair and patch defective areas only if approved by the Owner’s
Representative. Remove and replace concrete that cannot be repaired and patched to Owner Representative’s approval.
B. Repairing Mortar: Mix dry-pack patch mortar, consisting of one part Portland cement to two and one- half parts fine aggregate passing a No. 16 (1.18 mm) sieve, using only enough water for handling and placing.
C. Repairing formed surfaces: Surface defects include color and texture irregularities, cracks, spalls, air bubbles, honeycombs, rock pockets, fins and other projections of the surface, and stains and other discolorations that cannot be removed by cleaning.
1. Immediately after form removal, cut out honeycombs, rock pockets, and voids more than ½ inch (13mm) in any dimension in solid concrete, but less than 1 inch (25 mm) in depth. Make edges of cuts perpendicular to concrete surface. Clean, dampen with water, and brush-coat holes and voids with bonding agent. Fill and compact with patching mortar before bonding agent has dried. Fill form-tie voids with patching mortar or cone plugs secured in place with bonding agent.
D. Perform structural repairs of concrete, subject to Owner Representative’s approval, using epoxy adhesive and patching mortar.
SECTION 05 40 00
LIGHT GAUGE METAL FRAMING
PART 1 - GENERAL
1.01 DESCRIPTION
A. The intent of this Section is to establish the standard of quality for materials, fabrication and erection of light gauge studs, track, and related accessories to complete the work as indicated on the Drawings and described in the Specifications.
B. Related Requirements Specified Elsewhere
1. Section 01 30 00 – Submittals
2. Section 07 20 00 - Insulation
3. Section 09 25 00 - Gypsum Drywall
1.02 APPLICABLE STANDARDS
A. American Iron and Steel Institute (AISI): Design of Cold Formed Steel Structural Members.
B. American Welding Society (AWS): Welding in building Construction.
C. American Society for Testing and Materials (ASTM), D. Building Code as applicable.
E. American Institute of Steel Construction (AISC): Manual of Steel Construction.
1.03 SUBMITTALS
A. Shop Drawings
1. Indicate all member gauges, spacing’s and sizes.
2. Indicate shop and field assembly details including cut and connections.
3. Indicate type and location of all welds, bolts and fastening devices.
4. Shop drawings shall indicate all prefabricated framing with individual panel drawings for each condition.
1.04 QUALITY ASSURANCE
A. For purposes of designating type, sizes and quality for the work under this Section, Drawings and Specifications are based on products manufactured or furnished by INRYCO/Milcor Steel Framing Systems. Sizes and shapes shown on Drawings are to be considered the minimum structural sections allowable.
B. Products of other manufacturers similar to those specified herein will be acceptable for use on the project when approved in writing by the Contracting Officer. Supporting technical literature, samples, drawings and performance data sheets must be submitted for comparison.
C. Products for use on this project shall be of one manufacturer unless noted specifically otherwise herein.
PART 2 - MATERIALS
2.01 FRAMING MEMBERS
A. All framing members shall be of the type and size as shown on the Drawings. Minimum 18 gauge.
B. All painted 18 and 20 gauge studs, and all painted track, bridging, end closures and accessories shall be formed from steel that corresponds to the requirements of ASTM A611, Grade C with a minimum yield of 33,000psi.
C. All painted material and accessories shall be primed with rust inhibitive paint meeting the performance requirements of TT-P-636C.
PART 3 - EXECUTION
3.01 FABRICATION
A. Framing components may be pre-assembled into panels prior to erecting. Prefabricated panels shall be square with components and attached in a manner as to prevent racking.
B. All framing components shall be cut squarely for attachment to perpendicular members, or as required for an angular fit against abutting members. Members shall be held positively in place until properly fastened.
C. Axially loaded studs shall be installed in a manner, which will assure that the ends of the studs are positioned against the inside track web, prior to stud and track attachment.
D. Provide insulation equal to that specified elsewhere in all double jamb studs and doubleheader members, which will not be accessible to the insulation contractor.
3.02 ERECTION WALLS
A. Erect framing and panels plumb, level and square in strict accordance with the approved shop drawings.
B. Handling and lifting of prefabricated panels shall be done in a manner as to not cause distortion in any member.
C. Track shall be securely anchored to the supporting structure.
D. At track butt joints, abutting pieces of track shall be securely anchored to a common structural element, or they shall be butt-welded or spliced together.
E. Studs shall be plumbed, aligned and securely attached to the flange or webs of both upper and lower tracks.
F. Jack studs or cripples shall be installed above window and door heads, and elsewhere to furnish support, and shall be securely attached to supporting members.
G. Wall stud bridging shall be attached in a manner to prevent stud rotation. Bridging rows shall be spaced according to the manufacturer. Minimum bridging shall be walls Up to 10,-0" height; one row at mid-height. Walls exceeding 10'-O" height; bridging rows spaced not to exceed 5'-O" on center.
H. Framed wall openings shall include headers and supporting studs as necessary.
I. Temporary bracing shall be provided until erection is completed.
J. Splices in axially loaded studs shall not be permitted.
3.03 RECOMMENDED EQUIPMENT
A. Cutting
1. A radial arm 7½ hp (3425 rpm) saw with an 18" x 5/32" friction blade, style 9MR, having 280 teeth (10 teeth per inch) is frequently used in the shop. Other suggested shop cutting equipment includes either the radial arm saw or an abrasive cut-off (chop) saw with a reinforced abrasive blade or a band saw.
2. For field cutting and small quantities, a 3 hp worm drive Skill saw equipped with a reinforced abrasive cut-off blade, a band saw or a power band saw will serve satisfactorily.
B. Welding
1. A wire feed type welder is recommended for fastest and most uniform welding in the shop.
Good welds are also obtained with a 3/32" or 1/8" AWS type 6013 or 7014 rod with a welding head of 60-110 amperes depending on the gauge of material and the fit of the parts.
2. For field welding, a 225 amp, 230 volt single phase current are welder may be used.
C. Screw Attachment
1. For screwing of metal to metal, a reversible screw gun capable of handling metal self tapping screws is acceptable.
2. For attachment of metal to concrete, a self contained, .22 caliber power driving tool may be used.
3.06 CLEAN-UP
A. Remove all debris from site upon completion of work.
SECTION 06 65 00
SOLID SURFACE FABRICATIONS
PART I - GENERAL
1.01 DESCRIPTION
A. The work required under this Section consists of acrylic (polymer) solid surface material used for reception counter surfacing and counter top surfacing to complete the work as indicated on the Drawings and described in the Specifications.
1.02 REFERENCES
A. Applicable Standards: Standards of the following, as referenced herein:
1. American National Standards Institute (ANSI)
2. American Society for Testing and Materials (ASTM)
3. National Electrical Manufacturers Association (NEMA)
1.03 SUBMITTALS
A. Shop Drawings: Indicate dimensions, component sizes, fabrication details, attachment provisions and coordination requirements with adjacent work.
B. Samples: Submit minimum 2” x 2” (50 mm x 50 mm) samples. Indicate full range of color and pattern variation. Approved samples will be retained as standards for work.
C. Product Data: Indicate product description, fabrication information and compliance with specified performance requirements.
D. Maintenance Data: Submit manufacturer’s care and maintenance data, including repair and cleaning instructions. Include in project closeout documents.
1.04 QUALITY ASSURANCE
A. Allowable Tolerances:
1. Variation in component size: + 1/8” (3 mm).
2. Location of openings: + 1/8” (3 mm) from indicated location.
1.05 DELIVERY, STORAGE AND HANDLING
A. Deliver no components to project site until areas are ready for installation. Store components indoors prior to installation.
B. Handle materials to prevent damage to finished surfaces. Provide protective coverings to prevent physical damage or staining following installation for duration of project.
1.06 WARRANTY
A. Provide manufacturer’s ten (10) year warranty against defects in materials. Warranty shall provide material and labor to repair or replace defective materials. Damage caused by physical or chemical abuse or damage from excessive heat will not be warranted.
PART 2 - PRODUCTS
2.01 SOLID SURFACE FABRICATIONS
A. Specifications are based on solid surface materials manufactured by Dupont Corian, P.O. Box 80702, Wilmington DE 19880-0702; Phone (800) 426-7426.
B. Other Acceptable Products: approved equal.
C. Material: Homogeneous filled acrylic; not coated, laminated or of composite construction; meeting
ANSI Z124.3.
1. Superficial damage to a depth of 0.010” (25mm) shall be repairable by sanding and polishing.
D. Reception Counter and Counter Tops: Horizontal surfaces and vertical surfaces shall be thick solid polymer material adhesively joined with inconspicuous seams; edge details as indicated on the drawings.
E. Color: Color shall be priced from the Private and Terra Collections price group. If lower priced series is selected, credit shall be given.
2.02 ACCESSORIES
A. Joint Adhesive: Manufacturer’s standard two part adhesive kit to create inconspicuous, non-porous joints, with a chemical bond.
2.03 FABRICATION
A. For warranty coverage, fabricator/installer shall be approved or certified by solid polymer manufacturer.
B. Fabricate components in shop to greatest extent practical to sizes and shapes indicated, in accordance with approved shop drawings and solid polymer manufacturer requirements.
C. Form joints between components using manufacturer’s standard joint adhesive. Joints shall be inconspicuous in appearance and without voids. Attach 2” (50 mm) wide reinforcing strip of solid polymer material under each joint.
D. Provide holes and cutouts for plumbing and bath accessories as indicated on the drawings.
E. Rout and finish component edges to a smooth, uniform finish. Rout all cutouts and sand all edges smooth. Repair or reject defective or inaccurate work.
3.01 INSTALLATION
A. Install components plumb and level, in accordance with approved shop drawings and product installation details.
B. Form filed joints using manufacturer’s recommended adhesive, with joints inconspicuous in finished work. Keep component and hands clean when making joints.
C. Adhere top-mount sink/bowls to countertops using manufacturer’s recommended adhesives and color matched silicone sealant.
D. Provide backsplashes and endsplashes as indicated on drawings. Adhere to countertops using manufacturer’s standard color matched silicone sealant.
E. Keep components and hands clean during installation. Remove adhesives, sealants and other stains.
F. Protect surfaces from damage. Repair or replace damaged work that cannot be repaired to Architect’s satisfaction.
SECTION 07 20 00
INSULATION
PART 1 - GENERAL
1.01 DESCRIPTION
A. The work required under this Section consists of rigid board wall insulation, batt insulation, blanket insulation and related items to complete the work as indicated on the Drawings and described in the Specifications.
B. Related Requirements Specified Elsewhere
1. Section 01 30 00 – Submittals
1.02 SUBMITTALS
A. Submit data in accordance with Section 01300 - Submittals.
B. Submittals shall include, but not be limited to, the following;
1. Technical literature
2. Performance data
3. Spec-Data sheets
4. Manufacturer's installation instructions
1.03 COORDINATION
A. Efficient utilization of this product requires minimum damage thereto and maximum surface integrity. Therefore, allow others adequate time and space in which to work to complete their requirements prior to commencing insulation work.
B. Insulation which must be installed as other trades perform their work will be installed in a timely manner and protected so that the work of adjacent trades does not damage or displace insulation.
1.04 HANDLING AND STORAGE
A. Deliver all materials to the job site in the original manufacturer's sealed packages.
B. Store all materials off-ground and cover to keep dry.
PART 2 – MATERIALS
2.01 Manufacturer
A. Owens-Corning.
B. Or Approved equal
2.01 SOUND ATTENUATION BATTS
A. Type: Unfaced glass fiber acoustical insulation complying with ASTM C 665, Type I.
B. Size:
1. Thickness 2½” Width 16” Length 96” (furr out in room 125B).
2. Thickness 3½” Width 16” Length 96” (partition walls –rooms 125C and 125D).
C. Surface Burning Characteristics:
1. Maximum flame spread: 10
2. Maximum smoke developed: 10
3. When tested in accordance with ASTM E 84.
D. Combustion Characteristics:
1. Passes ASTM E 136.
E. Fire Resistance Ratings:
1. Passes ASTM E 119 as part of a complete fire tested wall assembly.
F. Sound Transmission Class: STC 44 G. Dimensional Stability:
1. Linear Shrinkage less than 0.1%
3.01 WALL INSULATION (Sound Attenuation Batt Fiberglass)
H. Install 3 ½” sound attenuation batts in stud spaces of partition walls and elsewhere as indicated.
Chink loose spots, holes and gaps with insulation.
I. Install 2 ½” sound attenuation batts in “furred” out wall area of room 125B. Chink loose spots, holes and gaps with insulation.
3.02 WORKMANSHIP
A. All work of this Section shall be done by competent craftsmen in a neat workmanlike manner. All insulation shall be left in good condition and neat appearance.
3.03 CLEAN UP
A. Remove all debris from the site upon completion of insulation work.
SECTION 07 92 00
JOINT SEALANTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C1311 (2010) Standard Specification for Solvent Release Agents
ASTM C509 (2006; R 2011) Elastomeric Cellular Preformed Gasket and Sealing Material
ASTM C734 (2006; R 2012) Low-Temperature Flexibility of Latex Sealant After Artificial Weathering
ASTM C834 (2010) Latex Sealants
ASTM C919 (2012) Use of Sealants in Acoustical Applications
ASTM C920 (2011) Standard Specification for Elastomeric Joint Sealants
ASTM D1056 (2007) Standard Specification for Flexible Cellular Materials - Sponge or Expanded Rubber
ASTM D1667 (2005; R 2011) Flexible Cellular Materials - Poly (Vinyl Chloride) Foam (Closed-Cell)
ASTM D217 (2010) Cone Penetration of Lubricating Grease
ASTM D2452 (2003; R 2009) Standard Test Method for Extrudability of Oil- and Resin-Base Caulking Compounds
ASTM D2453 (2003; R 2009) Standard Test Method for Shrinkage and Tenacity of Oil- and Resin-Base Caulking Compounds
ASTM E84 (2012c) Standard Test Method for Surface Burning Characteristics of Building Materials
1.2 SUBMITTALS
Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
A. SD-03 Product Data
1. Sealants
2. Primers
3. Bond breakers
4. Backstops
Manufacturer's descriptive data including storage requirements, shelf life, curing time, instructions for mixing and application, and primer data (if required). Provide a copy of the Material Safety Data Sheet for each solvent, primer or sealant material.
B. SD-07 Certificates
1. Sealant
2. Certificates of compliance stating that the materials conform to the specified requirements.
1.3 ENVIRONMENTAL CONDITIONS
Apply sealant when the ambient temperature is between 4 and 32 degrees C 40 and 90 degrees F.
1.4 DELIVERY AND STORAGE
Deliver materials to the job site in unopened manufacturers' external shipping containers, with brand names, date of manufacture, [color,] and material designation clearly marked thereon.
Label elastomeric sealant containers to identify type, class, grade, and use. Carefully handle and store materials to prevent inclusion of foreign materials or subjection to sustained temperatures exceeding 32 degrees C 90 degrees F or less than 4 degrees C 0 degrees F.
1.5 QUALITY ASSURANCE
1.4.1 Compatibility with Substrate
Verify that each of the sealants are compatible for use with joint substrates.
1.4.2 Joint Tolerance
Provide joint tolerances in accordance with manufacturer's printed instructions.
1.6 SPECIAL WARRANTY
Guarantee sealant joint against failure of sealant and against water penetration through each sealed joint for five (5) years.
PART 2 PRODUCTS
2.1 SEALANTS
Provide sealant that has been tested and found suitable for the substrates to which it will be applied.
2.1.1 Interior Sealant
Provide ASTM C834 [ASTM C920, Type S or M, Grade NS, Class 12.5, Use NT. Location(s) and color(s) of sealant for the following:
1. Location: Small voids between walls and door frames, built-in or surface-mounted equipment and fixtures, and similar items.
2. Color: As selected by Designer of Record
2.1.2 Floor Joint Sealant
Provide ASTM C920, Type S or M, Grade P, Class 25, Use T. Provide location(s) and color(s) of sealant as follows:
1. Location: Seats of metal thresholds for exterior doors.
2. Color: As selected by Designer of Record
2.2 PRIMERS
Provide a non-staining, quick-drying type and consistency recommended by the sealant manufacturer for the particular application.
2.3 BOND BREAKERS
Provide the type and consistency recommended by the sealant manufacturer to prevent adhesion of the sealant to backing or to bottom of the joint.
2.4 BACKSTOPS
Provide glass fiber roving or neoprene, butyl, polyurethane, or polyethylene foams free from oil or other staining elements as recommended by sealant manufacturer. Provide 25 to 33 percent oversized backing for closed cell and 40 to 50 percent oversized backing for open cell material, unless otherwise indicated. Make backstop material compatible with sealant. Do not use oakum and other types of absorptive materials as backstops.
2.5 CLEANING SOLVENTS
Provide type(s) recommended by the sealant manufacturer (except for aluminum and bronze surfaces that will be in contact with sealant).
PART 3 EXECUTION
3.1 SURFACE PREPARATION
Clean surfaces from dirt frost, moisture, grease, oil, wax, lacquer, paint, or other foreign matter that would tend to destroy or impair adhesion.
Remove oil and grease with solvent. Surfaces must be wiped dry with clean cloths. When resealing an existing joint, remove existing caulk or sealant prior to applying new sealant. For surface types not listed below, contact sealant manufacturer for specific recommendations.
3.1.1 Steel Surfaces
Remove loose mill scale by sandblasting or, if sandblasting is impractical or would damage finish work, scraping and wire brushing. Remove protective coatings by sandblasting or using a residue-free solvent.
3.1.2 Aluminum or Bronze Surfaces
Remove temporary protective coatings from surfaces that will be in contact with sealant. When masking tape is used as a protective coating, remove tape and any residual adhesive just prior to sealant application. For removing protective coatings and final cleaning, use non-staining solvents recommended by the manufacturer of the item(s) containing aluminum or bronze surfaces.
3.1.3 Concrete and Masonry Surfaces
Where surfaces have been treated with curing compounds, oil, or other such materials, remove materials by sandblasting or wire brushing. Remove laitance, efflorescence and loose mortar from the joint cavity.
3.1.4 Wood Surfaces
Keep wood surfaces to be in contact with sealants free of splinters and sawdust or other loose particles.
3.2 SEALANT PREPARATION
Do not add liquids, solvents, or powders to the sealant. Mix Multi-component elastomeric sealants in accordance with manufacturer's instructions.
3.3 APPLICATION
A. Acceptable Ratios:
JOINT WIDTH JOINT DEPTH
Minimum Maximum
For metal, glass, or other nonporous surfaces:
6 mm (minimum) 6 mm 6 mm over 6 mm 1/2 of width Equal to width
For wood, concrete, or masonry.
6 mm (minimum) 6 mm 6 mm over 6 mm to 13 mm 6 mm Equal to width over 13 mm to 50 mm 50 mm 16 mm
Over 50 mm As recommended by sealant manufacturer
For metal, glass, or other nonporous surfaces:
1/4 inch (minimum) 1/4 inch 1/4 inch
For wood, concrete, or masonry.
1/4 inch (minimum) 1/4 inch 1/4 inch over 1/4 inch to 1/2 inch 1/4 inch Equal to width over 1/2 inch to 2 inch 1/2 inch 5/8 inch
Over 2 inch As recommended by sealant manufacturer over 1/4 inch 1/2 of width Equal to width
B. Unacceptable Ratios: Where joints of acceptable width-to-depth ratios have not been provided, clean out joints to acceptable depths and grind or cut to acceptable widths without damage to the adjoining work. Grinding is not required on metal surfaces.
3.3.2 Masking Tape
Place masking tape on the finish surface on one or both sides of a joint cavity to protect adjacent finish surfaces from primer or sealant smears. Remove masking tape within 10 minutes after joint has been filled and tooled.
3.3.3 Backstops
Install backstops dry and free of tears or holes. Tightly pack the back or bottom of joint cavities with backstop material to provide a joint of the depth specified. Install backstops in the following locations:
1. Where backstop is not indicated but joint cavities exceed the acceptable maximum depths specified in paragraph entitled, "Joint Width-to-Depth Ratios".
3.3.4 Primer
Immediately prior to application of the sealant, clean out loose particles from joints. Where recommended by sealant manufacturer, apply primer to joints in concrete masonry units, wood, and other porous surfaces in accordance with sealant manufacturer's instructions. Do not apply primer to exposed finish surfaces.
3.3.5 Bond Breaker
Provide bond breakers to the back or bottom of joint cavities, as recommended by the sealant manufacturer for each type of joint and sealant used, to prevent sealant from adhering to these surfaces. Carefully apply the bond breaker to avoid contamination of adjoining surfaces or breaking bond with surfaces other than those covered by the bond breaker.
3.3.6 Sealants
Provide a sealant compatible with the material(s) to which it is applied. Do not use a sealant that has exceeded shelf life or has jelled and cannot be discharged in a continuous flow from the gun.
Apply the sealant in accordance with the manufacturer's printed instructions with a gun having a nozzle that fits the joint width. Force sealant into joints to fill the joints solidly without air pockets.
Tool sealant after application to ensure adhesion. Make sealant uniformly smooth and free of wrinkles. Upon completion of sealant application, roughen partially filled or unfilled joints, apply sealant, and tool smooth as specified. Apply sealer over the sealant when and as specified by the sealant manufacturer.
3.4 PROTECTION AND CLEANING
3.4.1 Protection
Protect areas adjacent to joints from sealant smears. Masking tape may be used for this purpose if removed 5 to 10 minutes after the joint is filled.
3.4.2 Final Cleaning
Upon completion of sealant application, remove remaining smears and stains and leave the work in a clean and neat condition.
1. Masonry and Other Porous Surfaces: Immediately scrape off fresh sealant that has been smeared on masonry and rub clean with a solvent as recommended by the sealant manufacturer. Allow excess sealant to cure for 24 hour then remove by wire brushing or sanding. Metal and Other Non-Porous Surfaces: Remove excess sealant with a solvent-moistened cloth.
-- End of Section --
SECTION 08 11 13
STEEL FRAMES
1.1 REFERENCES
A. The publications listed below form a part of this specification to the extent referenced.
The publications are referred to in the text by the basic designation only.
B. AMERICAN WELDING SOCIETY (AWS)
1. AWS D1.1/D1.1M (2010; Errata 2011) Structural Welding Code – Steel
C. ASTM INTERNATIONAL (ASTM)
1. ASTM A653/A653M (2011) Standard Specification for Steel Sheet, Zinc Coated
(Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
2. ASTM A879/A879M (2012) Standard Specification for Steel Sheet, zinc Coated by the Electrolytic Process for Applications Requiring Designation of the Coating Mass on Each Surface
3. ASTM A924/A924M (2013) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process
4. ASTM C578 (2012b) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
5. ASTM C591 (2013) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation
6. ASTM C612 (2010) Mineral Fiber Block and Board Thermal Insulation
7. ASTM D2863 (2013) Measuring the Minimum Oxygen Concentration to Support
Candle-Like Combustion of Plastics (Oxygen Index)
8. ASTM E1300 (2012a; E 2012) Determining Load Resistance of Glass in Buildings
9. ASTM E283 (2004; R 2012) Determining the Rate of Air Leakage Through Exterior
Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen
10. ASTM F2248 (2012) Standard Practice for Specifying an…