Statement_of_Work-65669v2.pdf

PDF 57 KB Posted

Attached to
Install Carpet - Bldg 1612 Federal contract opportunity
Solicitation number
FA2835-18-R-0046
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hanscom Air Force Base

About this file

Revised Statement of Work. Mohawk Product ID Updated.

View the file

Other files for this federal contract opportunity

Other files attached to Install Carpet - Bldg 1612, newest first.
File Type Posted
3rd_floor_1612.pdf PDF
FA2835-18-R-0046.pdf PDF
Bid_Schedule.xlsx XLSX spreadsheet
Statement_of_Work-65669.pdf PDF
Wage_Determination-65669.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 of

STATEMENT OF WORK

For

Replace Carpeting 3rd Floor Location Building: 1612

By: Lenore Gerossie

WORK ORDER NUMBER: 65669

DATED: 13 September 2018

1. GENERAL INFORMATION:

This project is intended to replace carpeting 3rd floor in accordance with all applicable National, Air Force, State and local building codes and regulations. This work will consist of supplying/furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described below in compliance with the Commonwealth of Massachusetts Building Code and Massachusetts General Law requirements, Unified Facilities Criteria (UFC) state and federal codes, base standards and manufacturer’s instructions. Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply. Effective immediately: Due to safety concerns the use of manhole fixed ladders on Hanscom AFB is prohibited for the purpose of entry and egress is prohibited. An alternative means is authorized (i.e.

appropriate portable ladder/personnel lowering device).

2. SCOPE: Replace Carpeting 3rd Floor

• Remove approximately 17000 sq. ft. of carpeting

• See Attached drawing

• Remove approximately 4000 ft. of cove base

• Level and prepare floor for carpeting

• Install approximately 1888 sq. yd. of 24” x 24” carpet tiles

• Replace 4000 ft. of cove base

• Customer will remove all personal items

• Contractor is responsible for the movement of all furniture

• All measurements need to be field verified

• Contractor will order carpet from one of the four following distributors

• This is for the carpet only

• Contractor is responsible for the delivery charges

Company Contract Number POC Phone Products Shaw FA8057-1-C-0002 Farrah Finley 888-393-2830

Pin 2273 Base No Limits J0108 Philadelphia 6901 Everlasting No Limits J0108 Philadelphia 69703 Border

J&J Flooring FA8057-17-C-0003 Kay Henderson 800-241-4586 x

7246 Impulse III Modular 746 3408/ Call an Old Flame 7246 Impulse III Modular 7246 1807 Jump Right In

Mohawk FA8057-17-C-0004 Anna.eigh Warmack

800-622-6228 x 46554

1OL Ready Confetti

CMA-

Mililken

FA8057-17-C-0005 Paul Snyder/Betty King

888-669-9772 Effervesce Chatter CTR119 Vintage Effervesce Chatter CTR1107 Pinot

2 of

3. GENERAL REQUIREMENTS:

Work includes, but is not limited to the following:

a. Provide resolutions of any technical problems that arise during the construction.

b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work.

c. Provide updates to Project POC. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates.

d. The Contractor is solely responsible for compliance with the Occupational Safety and Health Act of 1974

(OSHA) and the protection of their employees and all sub-contractor employees. In performing work under this contract on a Government installation, the contractor shall report any accidents involving Air Force property/equipment damage, or contractor personnel injuries occurring on the job or an accident resulting in death, injury, occupational disease, or adverse environmental impact to the contracting officer within five days.

e. Any modifications and addition on a facility that contains Lightning Protections System (LPS) This includes paint projects, roofing projects, projects requiring roof penetrations, installation of new HVAC or other metallic equipment, antenna installation, or other work. Additions and modifications to the facility envelope require re-evaluation of the LPS for the completed facility as a whole. The LPS required by the addition or modification shall not be a simple addition to the LPS. The LPS must be considered a single entity and must comply with requirements of a single LPS upon completion. The LPS shall be inspected by a commercial, third-party inspector whose sole work is lightning protection, and shall be certified by this third-party inspector as compliant with AFI 32-1065 and NFPA 780, in that priority order.

Projects calling for an LPS addition to an existing LPS project shall consider the configuration of the final LPS in the initial design. Projects of this type shall ensure the final LPS as a whole is compliant with AFI 32-1065 and NFPA 780, in that priority order. The same third-party inspector requirements shall apply.

f. Complete the “builder data inventory and assessment sheet” for newly installed assets, ensuring the bar code number is attached to the new equipment. Transfer bar codes from any removed equipment to the builder assessment ½ sheet form

g. Provide three (3) copies of O & M manuals and warranty letter

h. Period of Performance 60 days after award of contract

4. ADMINISTRATION:

Points of Contact (POC):

POC: Lenore Gerossie Phone Number. (781) 225-2960 Alternate POC: Roland Hartz Phone Number. (781) 225-5924

STATEMENT OF WORK
2. SCOPE: Replace Carpeting 3rd Floor
3. GENERAL REQUIREMENTS:
4. ADMINISTRATION:

File details come from the government source that posted it.